Northfield Point Site Improvements

Closed
IFB#26-17State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237990
New
North of River Sanitary District No. 1 WRRF Upgrades and Expansion
Solicitation # north-river-sanitary-district-no-1-wrrf-upgrades-expansion
Kiewit Infrastructure West Co. is soliciting sub-quotes for the North of River Sanitary District No. 1 WRRF Upgrades and Expansion project located in Bakersfield, California. The scope of work is extensive, covering civil and site work such as aggregates, trucking, asphalt paving, and curb and gutter, as well as structural and finishing tasks including concrete reinforcing, masonry, welding, roofing, and electrical work. Interested firms must contact Kiewit to receive an Invitation to Bid through the Building Connected system, with a bid deadline of September 17, 2026, at 10:00 a.m. The project is partially financed by the Water Infrastructure Finance and Innovation Act (WIFIA) administered by the EPA, making it subject to the American Iron and Steel (AIS) Provisions, Davis-Bacon Related Acts, and DBE Program requirements. Qualified bidders must possess a valid California Contractor’s license and provide acceptable insurance. Additionally, responsible subcontractors may be required to provide bonding for 100 percent of their contract value, with Kiewit agreeing to reimburse bond premiums. The solicitation specifically encourages quotes from certified Disadvantaged Business Enterprises (DBE), including MBE, WBE, and SBE firms, and emphasizes the importance of maintaining labor harmony on the project.
Kiewit Infrastructure West Co.

POSTED

about 20 hours ago

DEADLINE

in 19 days
NAICS: 237990
New
Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair
Solicitation # W9128A26BA002
The Haleiwa Small Boat Harbor Maintenance Dredging and Revetted Mole Repair project, solicitation W9128A26BA002, is a firm-fixed-price contract issued by the U.S. Army Corps of Engineers Honolulu District. The project is located in Haleiwa, Oahu, Hawaii, and is set aside for small businesses, including SDB, WOSB, HUBZone, and VOSB certifications. The estimated contract value ranges from 1,000,000 to 5,000,000 dollars, with a performance period of 200 calendar days from the date of the Notice to Proceed. The scope of work is divided into three primary components: mobilization and demobilization, the dredging and ocean disposal of approximately 4,260 cubic yards of material, and the repair of the revetted mole, which includes clearing, grubbing, and stone rework. The contract requires strict adherence to USACE EM 385-1-1 safety standards and ASTM international standards for stone materials. Key personnel requirements include a Project Manager, Project Superintendent, Quality Control System Manager, and Site Safety and Health Officer, all of whom must be approved by the Contracting Officer. Bidders must provide a bid guarantee and subsequent performance and payment bonds. Liquidated damages for construction delays are set at 2,297 dollars per calendar day. Quality control is managed through a three-phase inspection process, and final acceptance is contingent upon a certificate from the QC Manager attesting that all work complies with the contract specifications. Payment is handled via monthly invoices, and the contract is subject to Davis-Bacon Act prevailing wage requirements.
Healy Tibbitts Builders, Inc.

POSTED

about 20 hours ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The contract involves the construction of site improvements at Northfield Point, located at 600 Davol Street in Fall River, Massachusetts, aimed at creating a durable natural waterfront environment for public enjoyment. The scope of work includes comprehensive site preparation such as erosion control measures, grading, and landscaping. Additionally, the project requires installation of stabilized aggregate pathways, placement of salvaged granite stones fashioned into benches, provision of water services with yard hydrants and a water bottle filling station, as well as the setup of solar-powered lighted bollards, an osprey nesting pole, and poles for security cameras. All landscaping efforts include loaming, seeding, and miscellaneous park amenities, with the pedestrian walkway along the Fall River Bicentennial trail remaining accessible throughout construction. This solicitation, issued by the Massachusetts Redevelopment Authority under IFB#26-17, was posted on April 22, 2026, with a response deadline of May 21, 2026. All activities must comply with permits granted by the Fall River Conservation Commission, Massachusetts Department of Environmental Protection, and Army Corps of Engineers to ensure environmental and regulatory adherence. The project emphasizes maintaining public access and ecological sensitivity, with contact for inquiries directed to Trevor Coelho, Purchasing Agent, at the provided email and phone number.

General Info

Construction of Northfield Point waterfront improvements including pathways, landscaping, lighting, and water services.

Agency

Massachusetts → Redevelopment AuthorityView Agency

NAICS

237990 - Other Heavy and Civil Engineering ConstructionView NAICS

Place of Performance

MA, USA

Set-Aside

NONE

Documents

(10)

Northfield Point Site Improvements.pdf

PDF

Appendix_B_North_Field_Point_Site_Improvements_-_Project_Plans.pdf

PDF

Appendix_D_Northfield_Point_WQC.pdf

PDF

Appendix_C_IFB_26-17_Order_of_Conditions_-_Northfield_Pt.pdf

PDF

Appendix_E_IFB_26-17_MM_Approval_25-WWAR-0030-APP.pdf

PDF

Appendix_F_00_ACOE_PCN.pdf

PDF

Appendix_A_-_Draft_Contract_for_IFB_#26-17.pdf

PDF

Northfield_Prevailing_Wage_Rates.pdf

PDF

IFB#26-17_Bid_Sheet.pdf

PDF

26-17_Northfield_Point_Site_Improvements_Project_Manual.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyMassachusetts → Redevelopment Authority
Contacts1 person available
OfficeFall River, MA, 02720, USA
Organization / Agency
Massachusetts → Redevelopment Authority
View Agency Profile
Office AddressFall River, MA, 02720, USA
Contacts
Trevor CoelhoPurchasing Agent

Interested Companies (34)

Show more
Edward Paige
Westwood, Massachusetts
Rock Solid Construction Gulf Coast Florida
Dunedin, FL
Pawtucket Hot Mix Asphalt
Pawtucket, Rhode Island

See All 34 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
Project Purpose is to construct a resilient natural environment along the waterfront for public use. The work consists of furnishing all labor, materials and equipment for the construction of site improvements at Northfield Point, 600 Davol Street, Fall River. Work includes site preparation, installation of erosion controls, rough and finish grading, installation of stabilized aggregate pathways, cutting and placing of salvaged granite stones for benches, installation of water service with yard hydrants and water bottle fill station, furnishing and installing lighted bollards (solar), an osprey nesting pole, poles for security cameras as well as loaming, seeding and related site landscaping and miscellaneous park site amenities. The Fall River Bicentennial trail /pedestrian walkway shall remain open at all times during construction of the park. All work shall be in accordance with project permits issued by the Fall River Conservation Commission, Massachusetts Department of Environmental Protection and the Army Corps of Engineers.