Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Noyo Harbor Marina Geotechnical Boring Project (Project) (Notification of Lake or Streambed Alteration, No. EPIMS-MEN-66304-R1)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka

NAICS

N/A

Place of Performance

Fort Bragg, CA

Set-Aside

NONE

Documents

(1)

EPIMS-MEN-66304-R1C_Notice-of-Exemption

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Contacts2 people available
OfficeN/A
Organization / Agency
California → Fish and Wildlife, Region 1 - Northern Region, Redding and Eureka
Office AddressN/A
Contacts
Jennifer GarrisonSenior Environmental Scientist Specialist
Anna NeumannPlease contact Jennifer Garrison of CDFW

Full Description

Show more
The California Department of Fish and Wildlife has executed Lake and Streambed Alteration Agreement EPIMS Notification No. EPIMS-MEN-66304-R1, pursuant to Section 1602 of the Fish and Game Code to Anna Neumann representing the Noyo Harbor District (Permittee). The Project is limited to one encroachment for geotechnical investigations to inform the Noyo Harbor Redevelopment Project design. The work includes up to eight (8) in water borings and eight (8) onshore borings within the mooring basin. To avoid potential impacts to salmonids and green sturgeon, in-water construction shall occur within the National Oceanic and the Atmospheric Administration (NOAA) approved work window of July 15 to October 15. The project is anticipated to be completed within approximately 30 working days. Onshore Borings Eight (8) onshore borings will be conducted using a truck-mounted or track-mounted drill rig. Borings depths will be between 15 and 35-feet below the ground surface and will collect representative soil samples for laboratory testing. Bore holes will be backfilled with concrete, capped at the ground surface, and erosion control measures installed to minimize erosion. Material from the borings that is not collected as part of the geotechnical samples will be deposited in drums and stored at an upland site prior to disposal at an approved facility. In-Water Borings Eight (8) in-water borings will be conducted by a barge-mounted drill rig and support vessels may be used to assist with barge movement and anchoring. Boring depths will be between 30 and 70-feet below the mooring basin bed. The barge will include the drill rig, a drill mud circulation system and pumps, and generators to run the pumps. Material from the borings that is not collected as part of the geotechnical samples will be deposited in drums and stored at an upland site prior to disposal at an approved facility.