This Solicitation opportunity from Utah was posted on October 22, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
NS27-130 American Preparatory Academy - West Valley City Campus 2/3 Expansion, Phase 1 - K-6 Addition
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
Mahas Construction, acting as the Construction Manager for American Preparatory Academy, is soliciting labor and material bids for the West Valley City Campus 2/3 Expansion, Phase 1 – K-6 Addition. Located at 3636 West 3100 South in West Valley City, Utah, the project scope involves adding six new classrooms, three breakout classrooms, and restrooms to the existing elementary school wing. All work must be performed according to plans and specifications prepared by SPE Architects, with a required substantial completion date of July 9, 2027. Proposals must be submitted via email to [email hidden] by November 10, 2026, at 2:00 PM Mountain Time. Bidders are required to visit the site and examine all bid documents, including Addendum 01, which provides updates to life safety plans and roof-edge metal testing. Submissions must be properly executed on the provided proposal forms without alterations or deletions. Upon request, bidders must provide a Contractor’s Qualification Statement (AIA Document A305). The Owner and Construction Manager reserve the right to reject any proposal based on budget restraints or their sole subjective determination of the Owner's best interest. Questions regarding the scope of work or trade coordination should be directed to Rasty Snow.
General Info
Agency
Place of Performance
Set-Aside
Documents
3AI Contract Breakdown
Uniform Contract FormatSign up to view the full breakdown with detailed analysis of each section.
View Full BreakdownSolicitation requirements
11 mandatory16 requirements in 6 areas
- Submission8 · 5 must001
Proposal Submission Deadline
Contract notice - Quality Assurance3 · 3 must013
Product Substitution Standards
- Eligibility2 · 1 must009
Qualification Statement Compliance
- 13 more requirements, each with its source quote
Read every requirement with its source and proposal context.
Read all 16 requirementsThis one is closed. Find the next one like it.
Open contracts like this one, right now:
- DB Major M&R Sector Lake MIchigan, INTERNALOpen now, due in 21 days
- Building 262 Renovations FLETC GlyncoOpen now, due in 6 days
Ask CLEATUS
I've read this contract. Ask me anything.
Timeline
Solicitation
Response deadline changed from Nov 2, 2026 to Nov 10, 2026. The notice description changed.
Deadline has passed
Organization & Contact Information
Interested Companies (20)
See All 20 Interested Companies
Get full access to view all interested companies, their contact details, and full contractor profiles.
Full Description
**Questions: Questions on scope of work, trade coordination, and bidding should be emailed to Rasty Snow (•••••@•••••.•••Sign up to see this detail). The deadline for questions will be October 26, 2026, at 5:00 pm.**
**Submission: Proposals will be received on or before October 29, 2026 @ 2:00 PM prevailing Mountain Time at the office of the Construction Manager - Email: •••••@•••••.•••Sign up to see this detail. Amended Notice extends due date to November 10, 2026, 2:00 PM.**
Please note that there is a 1GB limit on a single file upload. This courtesy posting is an advertisement of a procurement opportunity for **American Preparatory Academy / Mahas Construction**, not the Division of Purchasing. Responses should be directed to the designated individual/office as designated in the solicitation document. The contract award for this solicitation will not be posted on this website. Instead, you will need to contact the designated individual/office as identified in the solicitation document. This solicitation posting will be canceled/closed upon the closing date of this solicitation; however, a vendor’s response will still be evaluated by **American Preparatory Academy / Mahas Construction** as described in the solicitation document. The Division of Purchasing is neither the issuing or conducting procurement unit for this solicitation, as such it is the vendor's responsibility to review the entire solicitation in order to comply with any requirements.
More opportunities from Utah
Same awarding agency
Get AI-powered intelligence on the opportunities still open
Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.
Join 900+ contractors already using CLEATUS
