Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

NSN SP132 ELECTRICAL WORK FOR HELICOPTER HOIST TRAINER

Active
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

Department Of The Navy → Navfac Mid-AtlanticView Agency

NAICS

N/A

Place of Performance

USA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Navy → Navfac Mid-Atlantic
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of The Navy → Navfac Mid-Atlantic
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
INSTALL 120V OUTLET 20AMP The Device 9H1, Helicopter Hoist Trainer provides hands-on training in helicopter rescue hoist procedures using the rescue hook, rescue basket, or the rescue strop. The 9H1 consists of a platform, a shelf assembly, electrical equipment, rotor downwash, an electric winch, a cable and a rescue hook assembly. Scope Of Work: ELECTRICAL: 1. CLIN 1: Install a 1P/20A 120V GFCI breaker, route new circuits, a junction box at the trainer location as referenced and specified in the “Proposed Electrical Design for Install.” Install a 1P/20A 120V GFCI breaker to the existing P2 panel. Utilize existing trench and conduit lay to route new circuits. Saw cut Trench for 1” EMT conduit installation and refinish flooring Install a 1-5/8”x-5/8” SS316 Unistrut mounted to wall and the new 9H1 HOIST platform with appropriate hanger connection. Provide and Route circuits through the 1” SCH 80PVC conduit or 1” EMT conduit, as applicable. Route it to the proposed J-Box location, install junction box and cap off the wires. 2. CLIN 2: Reroute the existing surface conduit and circuits through existing trench to the conduit opening and cap off or provide and install a 1-5/8”x-5/8” SS316 Unistrut mounted to wall (As mentioned in CLIN 1 and the new 9H1 HOIST platform and route new conduit and circuits and terminate (cap off) at junction box. This conduit will be cut and terminated at the wall during demolition and removal of existing platform (By others). 3. CLIN 3: Provide a GFCI outlet with weatherproof cover casing to be installed by others (NAWCTSD). Command Name: NAWCTSD