Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Department Of Energy was posted on June 10, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Nuclear-Compliant Valve Testing and Inspection Services

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves conducting hydrostatic pressure testing, nondestructive examination, and operational performance assessments on four nuclear-grade check valves to ensure they meet stringent ASME and Idaho National Laboratory standards. These tests will evaluate critical parameters such as closure time, leakage, and disc stability, verifying the valves’ integrity and functional compliance for nuclear applications. The scope is vital to maintaining safety and reliability in nuclear systems. This subcontract, issued by Battelle Energy Alliance under the Department of Energy, is designated for performance in Idaho Falls, with a response deadline set for July 10, 2026. It falls under NAICS code 541380, which pertains to testing laboratories and inspection services, reflecting the specialized nature of the testing required. The contract supports initiatives requiring highly technical and regulatory-compliant inspection services in the nuclear energy sector.

General Info

Hydrostatic and nondestructive testing of nuclear check valves to ensure ASME and safety compliance.

Agency

Department Of Energy → Battelle Energy Alliance–doe CntrView Agency

NAICS

541380 - Testing Laboratories and ServicesView NAICS

Place of Performance

Idaho Falls, ID, 83415, USA

Set-Aside

NONE

Documents

This scope was carved out of INL-26-045.

The full solicitation package (2 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Cooling System Check Valve Replacement

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Energy → Battelle Energy Alliance–doe Cntr
ContactsNo contacts available
OfficeN/A
Organization / Agency
Department Of Energy → Battelle Energy Alliance–doe Cntr
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Perform hydrostatic pressure testing, nondestructive examination (NDE), and operational performance testing (closure time, leakage, disc stability) on four nuclear-grade check valves to verify compliance with ASME and INL standards.

More opportunities from Department Of Energy → Battelle Energy Alliance–doe Cntr

Same awarding agency

NAICS: 336419
New
Federal
SR-1 Freedom Reactor Radiation Shielding Design/Build
Solicitation # INL-26-053
Battelle Energy Alliance (BEA), the Management and Operating Contractor for the Department of Energy's Idaho National Laboratory (INL), is seeking Expressions of Interest for the design and fabrication of the Reactor Radiation Shielding system (RRS) for the NASA SR-1 Freedom interplanetary spacecraft. The RRS must protect spacecraft components from neutron and gamma photon radiation, maintaining a composite weight of less than 1200 kg and operating in a space vacuum with temperatures ranging from -273°C to 800°C. The system must interface with the reactor structure, control drum actuators, Heat Management System heat pipes, and Power Conversion System structure, while being qualified to withstand launch forces and vibrations. The project will be executed as a firm-fixed price contract awarded in progressive phases, with the possibility of multiple initial awards during the design phase before a final fabrication firm is selected. The project must be completed by July 2027. Interested firms must submit their qualifications by September 24, 2026, demonstrating expertise in radiation shielding design, transport modeling, and fabrication. Qualified offerors must adhere to ISO 9001-2015 and ANSI/ASQC C1-1996 quality standards and be capable of meeting INL Quality Supplier List audit requirements. A formal Request for Proposal is anticipated in late September or early October 2026, with a final award decision expected in October 2026.
Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing

POSTED

about 24 hours ago

DEADLINE

in 13 days
View Details
NAICS: 335910
Federal
Long-Duration Energy Storage (LDES) Battery System
Solicitation # INL-26-050
Idaho National Laboratory (INL) and Argonne National Laboratory (ANL) have issued an Expression of Interest (EOI) under solicitation INL-26-050 to identify qualified vendors for non-lithium, rechargeable electrochemical long-duration energy storage (LDES) battery systems. The objective is to acquire systems for benchmark performance testing, specifically requiring two modules with at least 10 kW continuous power and 100 kWh usable energy, and one full-scale system with at least 100 kW continuous power and 1,000 kWh usable energy. All systems must be capable of at least 10 hours of continuous discharge, operate between 0 to 50 degrees Celsius, and possess a minimum field lifetime of 15 years. Acceptable technologies must be pre-built and exclude lithium-ion, lithium metal, lead-acid, and redox flow batteries. Technical requirements include a 3-phase 480 VAC AC interface and an isolated 800-1500 VDC DC interface, with support for SCADA protocols such as Modbus TCP/IP, DNP3, or IEC 61850. Systems must comply with NFPA 855, UL 9540/9540A, and NEC/IEEE standards, and include comprehensive hazard assessments and safety systems. Deliverables involve 70%, 90%, and final design packages, along with Factory and Site Acceptance Testing reports. Modules are to be delivered to INL within approximately three months of design acceptance, while the full-scale system is destined for ANL within six months. This EOI serves as a preliminary screening process to inform a future Request for Proposal (RFP); interested vendors must submit a consolidated response by September 24, 2026, to Chase Egbert.
Battery Manufacturing

POSTED

19 days ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS