Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from General Services Administration was posted on May 8, 2020. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

O'Brien Upper Envelope Project

Closed
47PC0220R0014Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity, categorized under NAICS code 236220, specifically calls for bids from Disadvantaged Business Enterprise (DBE) subcontractors. The solicitation was posted on October 20, 2026, with a response deadline of November 4, 2026. The project area for subcontracting opportunities is identified as Riverside or Los Angeles. Compliance with strict Disadvantaged Business Enterprise requirements is mandatory to secure project financing, and failure to meet these standards will result in a bid being deemed non-responsive. Bidders must demonstrate Good Faith Efforts (GFE), including proof of posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening. Additionally, bidders must provide proof of utilizing the Small Business Administration and the Minority Business Development Agency within their bid package. While outreach documentation may be submitted up to three business days after the bid closing, the publicity and agency assistance proofs must be included at the time of submission.
RT CONTRACTOR CORP

POSTED

about 10 hours ago

DEADLINE

in 14 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The primary project involves a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. This scope encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, telecommunications, and the installation of underground stormwater retention and utility systems. An additional option for the P1016 facility includes a 17,978 square foot laboratory with similar structural specifications and the demolition of an existing 548 square meter engineering facility. The solicitation is open to various small business designations, including SDB, WOSB, HUBZone, and VOSB. Bidders must adhere to Davis Bacon Wage Rates, and the project is exempt from sales tax. Pricing is requested across a wide array of trades, including demolition, abatement, structural steel, mechanical, electrical, plumbing, and fire protection, among others. Interested parties must contact the primary point of contact to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 10 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of an upgraded 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. The project, managed by C. Overaa & Co., has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and facility relocation; construction of a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant in service during the first two phases while ensuring compliance with General Order/NOA standards. This solicitation is open to small businesses, including certified veteran, women, and disadvantaged business enterprises, with a specific local hiring goal requiring 50 percent of the construction workforce to be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic invoicing system and are responsible for associated service fees. Bids are due by November 10, 2026, following a mandatory pre-bid meeting held on October 5, 2026. Award acceptance is conditioned upon the subcontractor's full agreement to Overaa standard terms, including potential 100 percent performance and labor bonds and specific workers compensation insurance waiver of subrogation endorsements.
C. Overaa & Co.

POSTED

about 10 hours ago

DEADLINE

in 20 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
J & J Contractors, Inc. is soliciting bids for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. This comprehensive construction project has a duration of 1828 calendar days and involves the creation of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes the construction of an Ordnance Operations building, a Truck Inspection facility, and a Sentry building, alongside the demolition of 18 existing magazines and two other buildings. Technical requirements encompass a wide range of trades, including demolition, abatement, structural steel, electrical, plumbing, and mechanical work. Key site features include rigid inclusions, load transfer mats, grounding and lightning protection, intrusion detection systems, and extensive site preparation involving rock excavation and wetland mitigation. The project also requires the installation of primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact Rahul Maheshwari to receive bid documents before the October 31, 2026 deadline.
J & J Contractors, Inc

POSTED

about 10 hours ago

DEADLINE

in 10 days
NAICS: 236220
New
SLED
Colville Fuels, Coyote Ridge Golf Course, Secondary Emergency Exit from Clubhouse Basement
Solicitation # Request-for-Bid-Coyote-Ridge-Golf-Course-Secondary-Emergency-Exit-from-Clubhouse-Basement.pdf
Colville Fuels LLC is soliciting bids for the construction of a code-compliant secondary emergency exit from the clubhouse basement at Coyote Ridge Golf Course in Washington. The scope of work includes saw cutting reinforced concrete walls, installing a commercial-grade exterior door assembly with panic hardware, and excavating a permanent ADA-accessible egress path with required drainage, retaining walls, and handrails. The contractor must ensure all work is code-compliant, coordinate inspections with the Authority Having Jurisdiction, and restore all affected surfaces to match existing clubhouse architecture. This is a price-based invitation for bids where the award will be granted to the lowest responsive and qualified bidder, subject to budgetary limits and Indian preference requirements. Preference is tiered from 100% Colville Business Enterprises down to non-certified Indian-owned businesses, with allowable price differentials based on the total bid amount. Bidders must submit a firm fixed price bid, a performance schedule, a subcontracting plan, and evidence of financial stability, insurance, and licensing by November 20, 2026. The project is expected to be completed by March 31, 2026, though this date is weather-dependent. Final contract terms and payment conditions will be negotiated upon the selection of the successful bidder.
Confederated Tribes of the Colville Reservation

POSTED

about 11 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
SLED
ADA Improvements for Patterson Park and MPD
Solicitation # 1914.02
The City of Murfreesboro is soliciting sealed bids for solicitation number 1914.02, which entails construction upgrades for the Police Headquarters Vestibule and ADA improvements for the Patterson Park Recreation Center Entry. The project is based on AIA Documents A101 and A201 (2017) and requires the contractor to provide high-grade workmanship, including cutting, patching, and the restoration of disturbed structures. Bidders must be licensed General Contractors in the State of Tennessee and registered through the OpenGov procurement portal. The contract will be awarded to the lowest responsive and responsible bidder based on the sum of the base bid and any accepted alternates, with evaluation criteria focusing on experience, financial ability, reputation, and past work history with the owner. Submission requirements include a lump sum base bid, a 5% contingency allowance, and a bid security equal to 5% of the bid, which must be uploaded electronically and delivered physically to the Purchasing Department. The successful contractor must provide performance and payment bonds totaling 100% of the contract sum. Key deliverables include a construction schedule submitted within 21 days of award, various certificates of occupancy and inspection, and specific documentation such as AIA Forms G706, G706A, and G707. The contractor is responsible for quality control and must adhere to strict packaging and marking standards for hardware and wiring, as well as specific waste management and labeling protocols. Payment is processed via Applications for Payment, which must be accompanied by an updated Construction CPM Schedule and a schedule of values.
Facilities

POSTED

about 11 hours ago

DEADLINE

in 23 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Albany, NY, 12207, USA

Set-Aside

SBA

Documents

28

47PC0220R0014 Amendment 0001

PDF, High priority: read this first3 pages · amendment
High

47PC0220R0014 Amendment 0002 - Leo W. O’Brien Federal Building Construction

PDF, High priority: read this first3 pages · amendment
High

47PC0220R0014 Amendment 0003

PDF, High priority: read this first2 pages · amendment
High

47PC0220R0014 Amendment 0004 - Leo W. O’Brien Federal Building Construction

PDF, High priority: read this first6 pages · amendment
High

47PC0220R0014 Amendment 0005

PDF, High priority: read this first2 pages · amendment
High

47PC0220R0014 Amendment 0005 Q&A

PDF, High priority: read this first2 pages · amendment
High

47PC0220R0014 - Leo W. O’Brien Federal Building Construction

PDF, High priority: read this first43 pages · rfp
High

47PC0220R0014 - Solicitation, Offer, and Award

PDF, High priority: read this first3 pages · rfp
High

General Decision Number NY20200002 - Wage Determination

PDF, High priority: read this first21 pages · wage-determination
High

GSA Project RNY 12932 - Addendum No. 1

PDF, High priority: read this first15 pages · amendment
High

GSA Project # RNY 12932 - Section 028200 Asbestos Remediation

PDF, High priority: read this first12 pages · sow
High

GSA Project RNY 12932 - Table of Contents (Addendum 1)

PDF, High priority: read this first2 pages · specifications
High

Key Personnel Qualification Resume Form - O'Brien Upper Envelope Repairs

PDF, High priority: read this first1 page · past-performance
High

Leo O'Brien Federal Bldg - Upper Envelope Project (RNY#12932)

PDF, High priority: read this first24 pages · specifications
High

Leo W. O’Brien Federal Building Construction Agreement (C101-SB-GC)

PDF, High priority: read this first42 pages · contract-document
High

O’Brien Upper Envelope Project Preliminary Design Narrative Report

PDF, High priority: read this first10 pages · specifications
High

O’Brien Upper Envelope Project (RNY12932) - Statement of Work

PDF, High priority: read this first2 pages · sow
High

OBrien Upper Envelope Repairs - Experience on Similar Projects Offeror Form

PDF, High priority: read this first1 page · past-performance
High

Patroon Island RF Pre-Install Assessment (850-AWS3 Add)

PDF, High priority: read this first13 pages · specifications
High

Solicitation 47PC0220R0014 Amendment 0002

PDF, High priority: read this first2 pages · amendment
High

Solicitation 47PC0220R0014 Amendment 0004

PDF, High priority: read this first2 pages · amendment
High

Upper Envelope Project - Addendum No. 2

PDF, High priority: read this first2 pages · amendment
High

VZ Site ID 071290 - Antenna Placement (Patroon Island)

PPTX, High priority: read this first1 page · specifications
High

GSA 527 - Contractor Qualifications and Financial Information

PDF, Low priority6 pages · past-performance
Low

OBrien Upper Envelope Repairs - Past Performance Questionnaire

PDF, Low prioritypast-performance
Low

Offeror Representations and Certifications (DEC 2019)

PDF, Low priority11 pages · reps-and-certs
Low

For+Construction_OBrien_Upper_Envelope_Specs_2020-03-10.pdf

PDF

OBrien+Boiler+Existing+Stacks.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

5 updates
PhaseClosed
Posted

Solicitation

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

The notice description changed.

Notice updated

Response deadline changed from Apr 14, 2020 to May 14, 2020. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R2 Repair And Alterations Branch
Contacts2 people available
OfficeNEW YORK, NY, 10007, USA

Full Description

Show more
This Amendment 0005 is being issued to provide a revised GSA response to RFI No. 8 of the Amendment 0004 and an additional RFI that was inadvertently left out from previous Amendments. Please see attached Amendment 0005 Q-A document for details. This amendment must be signed and returned with your offer. _________________________________________________________________________________________________ This Amendment No. 0004 is being issued to extend the proposal due date and provide additional information in response to RFIs received. Please see Amendment No. 0004 and attachments to it for details. This amendment must be signed and returned with your offer. _________________________________________________________________________________________________ This Amendment No. 0003 (see attached SF30) is being issued to: 1. Postpone the site visit scheduled on March 31, 2020; once GSA has determined the new site visit date, a follow on amendment will be issued providing the information for it; 2. Please submit your questions/RFIs, if any, by COB, Monday April 6, 2020; 3. Extend the proposal due date to Thursday, April 30, 2020, by 4:00 P.M. EST. This amendment must be signed and returned with your offer. _________________________________________________________________________________________________ This Amendment 0002 is being issued to reschedule the Pre-Proposal and Site Visit information. Please see attached Amendment 0002 for details. This amendment must be signed and returned with your offer. ____________________________________________________________________________________________ This Amendment 0001 (See Attached Amendment 0001) is being issued to postpone the Pre-Proposal/Site Visit as follows: I.D. Pre-Proposal Conference Date: March 31, 2020 Time: 10:00 AM to 12:00 PM Location: Leo W. O'Brien Federal Building 1 Clinton Ave. Albany, NY 12207 Conference Room - TBD Interested parties must contact Jayshree Tank, Contract Specialist to register, by COB March 27, 2020, by sending an email with the names of attendees, company name, contact information mobile phone no. as well as email address. Only those parties who have notified the Contract Specialist and provided necessary information in advance of the walk-through will be allowed to attend. To request reasonable accommodations due to a disability, contact Jayshree Tank, Contract Specialist at (212) 577-8681. _______________________________________________________________________________________________ THIS IS A SOLICITATION NOTICE. The General Services Administration, Region 2, Public Buildings Service, hereby issues a Request for Proposal (RFP) # 47PC0220R0014, to replace existing roofing systems at the Leo O'Brien Federal Building. The project is being solicited with a Base Bid; one (1) alternative to the base scope of work and one (1) Option. The government will determine which approach (base or alternative) to take prior to the award. It will be an either or type situation regarding the base work versus the alternative and clearly identified within the award document. The Option work applies to both the base work and the alternative approach regardless of which is selected by the government. Base Bid Work includes but is not limited to the following work: approximately 17,225 sf of existing roofing systems at the Leo O'Brien Federal Building (127 ft x 157 ft) will be replaced with new roofing systems with a new fully adhered TPO membrane roofing system comprised of torch down vapor barrier, multiple layers of Type VI Extruded Polystyrene (XPS) insulation (amount of insulation required will create a height of approximately 4.5 inches), cover board, and eighty (80) mil TPO membrane; fire rated pressure treated wood will be used to add curbing and or curbing height as depicted within project documents; existing roof drains will receive new inserts and strainers; all drains will be confirmed as being clear and free any obstruction prior to completion; the existing roof has been identified to contain asbestos containing material (ACM) in specific areas as identified with project documents will be abated as part of project; new OSHA-complaint guardrails will be installed around the perimeter; a roof tie-off system (anchor points) will be installed and pull rating verified; and new lightning protection system installed and certified as functioning and operational. At the conclusion of the project, the existing site will be restored to its original condition. As part of the verification process to confirm proper installation the roofing system's technical representative must conduct periodic inspection during the course of the installation, conduct a final inspection to verify TPO seam and roof terminations integrity. Additionally within one year of the date of substantial completion at a time mutually agreement upon by GSA and contractor the contractor as part of their contract shall perform an infrared scan of all the roofing areas using an independent third party. The scan results shall be sent directly to GSA with copy going to contractor. Contractor shall resolve any concerns identified. Contractor shall provide GSA with labor and material warranty in accordance with project documents. Alternative Base Bid Work includes performing ALL of the work outlined within the base bid scope of work EXCEPT that the amount of insulation to be installed will instead create a height of 6.5 inches and that a raised roof area will be created under each of the four (4) cell tower areas. The creation of this new raised roof area around the cell tower footprint is being required to facilitate the installation of the increase amount of insulation around the cell tower structures. The roof assembly remains relatively unchanged for wood substrate a stick down membrane is required such as Grace Ice and Water and or a similar type material. The approach required to install the TPO on this newly created raised area will be the same as that for the elevator penthouse roof area. The newly created raised roof under the cell towers will require walkway mats to be installed in that area to provide safe walk areas when working on and around the cell towers. Option Work (option work applies regardless of whether base or alternative is selected): Furnish all material, equipment, labor and supervision to perform the following work which includes but is not limited to: removing the existing roof pavers and installing a monolith roof under the cooling towers; reinstalling the previously removed pavers ensure all damaged pavers are replaced with new; removing and replacing the narrow band of roof surrounding the building at this level (10th floor); existing roof drains will receive new inserts and strainers; all drains will be confirmed as being clear and free of any obstruction prior to completion; remove one (1) door and frame, sealing up the opening by toothing in new masonry concrete block; and sealing the mason walls surrounding the cooling tower area (three sides) by applying two (2) coats of Dow-Corning Silicone coating. Additionally within one (1) year of the date of substantial completion, at a time mutually agreed upon by GSA and contractor, the contractor (as part of their contract) shall perform an infrared scan of all roofing areas using an independent third party. The scan results shall be sent directly to GSA with copy going to contractor. Contractor shall resolve any concerns identified. Contractor shall provide GSA with full labor and material warranty in accordance with project documents. TYPE OF SET-ASIDE: This requirement will be solicited as a 100% Total Small Business set-aside.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS