Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on January 28, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Oak Hall Waterlines Project Entech No. 4139.055

Awarded
4139.056State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key deliverables include the installation of a new wet well, valve vault, pumps, a generator, and odor control equipment, as well as the demolition of existing pumps and piping. Additional requirements include site improvements, stormwater facilities, fencing, and the installation of new gravity sewers and manholes. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with evaluation focusing on qualifications, financial ability, and strict adherence to bidding documents. Bidders must provide bid security, evidence of authority to sign, and M/WBE compliance documentation, including a Good Faith Efforts Form and Table A. The successful contractor is required to furnish performance and payment bonds equal to the contract price and maintain insurance from companies with an A.M. Best rating of A-VII or better. Project administration follows EJCDC standards, with payments processed monthly via applications for payment submitted to the Engineer, and final acceptance contingent upon the Engineer's written recommendation.
Don Moorhead Construction, Inc.

POSTED

about 2 hours ago

DEADLINE

in 2 days
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
The Jefferson Street Pump Station Replacement project for the City of Winchester, Virginia, involves the construction of a new pump station featuring a precast concrete building, controls, and a standby generator. The scope of work includes site electrical, yard piping, security fencing, grading, paving, the relocation of an existing fuel tank, and the demolition of existing facilities. All work must be completed within 610 calendar days following the Notice to Proceed, with liquidated damages set at 1,000 dollars per day for delays. The project is governed by VDOT 2020 Road and Bridge Specifications and the City of Winchester Standards Manual, with strict adherence to OSHA and ADA requirements. WG Construction is seeking MBE/WBE subcontractor participation for paving, material supply, site development, fencing, MEP, roofing, and carpentry. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder. Requirements for bidders include registration in the Commonwealth of Virginia, submission of a bid guarantee, and the provision of performance and payment bonds equal to 100 percent of the contract amount. Additionally, the project is subject to Davis-Bacon wage determinations and requires compliance with various federal executive orders regarding non-discrimination and the use of American Iron and Steel.
WG Construction Co., Inc.

POSTED

about 2 hours ago

DEADLINE

in 2 days

AI Contract Overview

Show more

The College Township Water Authority is soliciting bids for the Oak Hall Waterlines Project (Entech No. 4139.055) in Centre County, Pennsylvania. The scope of work involves the installation of approximately 7,240 linear feet of 12-inch ductile iron waterline and 900 linear feet of 8-inch waterline, along with valves, fittings, 16 service connections, and hydrants. Construction will take place along Boalsburg Road, Brush Valley Road, and across country, including two stream crossings. The project is divided into two lump-sum construction contracts: Contract No. 1 for General/Mechanical work and Contract No. 2 for Electrical work. Additional requirements include the installation of a preformed metal roofing system for the well facility and booster pump station, which must be performed by manufacturer-approved contractors and include a 20-year warranty. Bids must be submitted electronically via the PennBid Program by 2:00 pm local time on Tuesday, February 24, 2026. Attendance at a mandatory pre-bid conference on February 10, 2026, at the College Township Office is required for bid eligibility. The project mandates the use of United States-made steel and adherence to prevailing minimum wage rates and the Public Works Employment Verification Act. Performance timelines specify substantial completion within 300 days of commencement, with final payment due by day 330. Quality assurance requires destination inspection at the project site, including pressure testing at a minimum of 250 psi with zero leakage.

General Info

Contract Value

$1,959,959

Place of Performance

Centre County, PA, USA

Set-Aside

NONE

Award Issued Date

Documents

7
XLSX, High priority: read this firstbid-tabulation
High
XLSX, High priority: read this firstbid-schedule
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstamendment
High
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseAwarded
Posted

Solicitation

Notice updated

Solicitation number changed from College Township Water Authority, Centre County to 219452. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Centre County
ContactsNo contacts available
OfficeCentre County, PA, USA
Organization / AgencyPennsylvania → Centre County
Office AddressCentre County, PA, USA
ContactsNo contact information available

Interested Companies (161)

360
4-M Construction Services
All-Terra Construction

See All 161 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
Ref. #: College Township Water Authority, Centre County
College Township Water Authority (Owner) is requesting Bids for the construction of the following Project:
Oak Hall Waterlines Project Entech No. 4139.055
Bids for the construction of the Project will be received electronically via the PennBid Program by the College Township Water Authority until 2:00 pm local time, Tuesday, February 24, 2026. After bid opening, a public notice will be issued via PennBid containing any available bid results. It should be noted that bid results are subject to further review and should not be construed as issuance of an award.
The Project includes the following Work:
Work consists of but is not limited to the installation of approximately 7,240 LF of 12-inch ductile iron waterline, 900 LF of 8-inch waterline, valves, fittings, 16 service connections, and hydrants along Boalsburg Road, Brush Valley Road, and across country within College Township, Centre County, PA. The work includes two stream crossings. The extent of the work is described in the Contract Documents, Drawings and Specifications.
Obtaining the Bidding Documents
All project documents are available at no cost via the PennBid Program (https://pennbid.bonfirehub.com).
Pre-bid Conference
A mandatory pre-bid conference for the Project will be held on Tuesday, February 10, 2026 at 10:00 am at the College Township Office, 1481 East College Avenue, State College PA 16801. Bids will not be accepted from Bidders that do not attend the mandatory pre-bid conference.
Instructions to Bidders
For all further requirements regarding bid submittal, bid security, qualifications, procedures, and contract award, refer to the Instructions to Bidders that are included in the Bidding Documents.
Attention is called to the fact that prevailing minimum wage rates as determined by the Secretary of the Department of Labor and Industry must be paid by the Contractors on this project and that employees and applicants for employment shall not be discriminated against because of their race, age, color, religion, sex, national origin, or handicap. Each Bidder is required to meet the requirements of Public Works Employment Verification Act, Act 127 of 2012.
Any and all steel products used or supplied in the performance of the contract or any subcontracts shall be from steel made in the United States.
The College Township Water Authority hereby reserves the right, which is understood and agreed to by all bidders, to refuse and reject any or all bids submitted, and also reserves the right to waive any informality in bids received.
Except as otherwise provided by law, no bidder may withdraw its bid for sixty (60) days after the Bid Due Date, unless the contract award is delayed by a required approval of another government agency, the sale of bonds, or the award of a grant or grants, in which case the Bids shall remain open to acceptance and shall be irrevocable for a period of one hundred twenty (120) days after the Bid Due Date.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS