Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Pennsylvania was posted on May 19, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Oak Hill, Central, and South Scotland Sewer Interceptor Upgrades

Closed
Greene Township Municipal Authority, Franklin CountyState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia, identified by solicitation number 2027-027. This opportunity is open to various small business designations, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by the deadline of December 4, 2026. The scope of work involves comprehensive sewer installation and site development, including the open cut installation of PVC pipes ranging from 6 to 30 inches and Ductile Iron Pipe from 18 to 24 inches. Key structural requirements include the installation of standard and doghouse manholes, interior drop assemblies, and a CSO regulator fit out. Specialized tasks include 24-inch DIP trenchless crossings with associated launch and receiving shafts, as well as the abandonment of existing pipes and manholes. Site work entails clearing and grubbing of 5,130 square yards of wooded areas, seeding, fine grading, and the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP). Critical project deliverables include the maintenance of flows and bypass for all pipes and manholes to ensure operational continuity, along with geotechnical instrumentation and monitoring. Additionally, the project requires specific railroad insurance. The bid schedule outlines various general and contingent items, including mobilization and extra depth excavation, though the total estimated contract value is not specified.
Cleary Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in about 1 month
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont in North Carolina with a project estimate of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and extensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The final deliverables comprise a fully operational pumping station featuring mechanical and electrical systems, a generator, odor control equipment, and new gravity sewer connections. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on responsiveness regarding the submission of MWBE documents, including the Good Faith Efforts Form and Table A. Performance is governed by EJCDC standard forms, including the C-700 General Conditions and C-800 Supplementary Conditions. The contractor is required to provide performance and payment bonds, as well as proof of insurance. Project timelines are triggered by a Notice to Proceed, and failure to achieve substantial completion will result in liquidated damages of 1,000 dollars per day. Payment is processed via applications for payment submitted to the Engineer, with terms due thirty days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 7 hours ago

DEADLINE

in 11 days
NAICS: 237110
New
Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 in CA
Solicitation # main-wastewater-treatment-plant-secondary-reactors-rehabilitation-phase-2-ca
Garney Pacific, Inc. is seeking quotes from qualified subcontractors for the Main Wastewater Treatment Plant Secondary Reactors Rehabilitation Phase 2 project located in Oakland, California, for the East Bay Municipal Utility District. The comprehensive scope of work involves the rehabilitation of covered and open concrete structures, including the installation of platforms and access improvements. Mechanical and piping requirements include the relining, modification, or replacement of small and large diameter steel and ductile iron pipes, pipe supports, valves, and piping appurtenances, as well as the installation and operation of a temporary 11 MGD pumped bypass. Additionally, the project entails the rehabilitation of reactor mixers and aerators, replacement of motor control center components, modifications to sluice and slide gates, rerouting of sump pump discharge lines, excavation, trench work, and surveying. This solicitation is open to various small business set-asides, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Subcontractors are specifically requested for lead abatement, metals fabrication, painting, coatings, FRP reinforcing systems, and access hatches. All subcontractors must utilize union labor and be prepared to provide a 100 percent Payment and Performance Bond from a US Treasury listed Surety Company, with bond rates provided at the time of bid for reimbursement. Quotes are due by November 17, 2026, and the final bid date is November 18, 2026. Contracts will be based on Garney Standard Purchase Order and Subcontract forms, and any exceptions must be submitted as redlines with the quote.
Garney Pacific, Inc.

POSTED

about 7 hours ago

DEADLINE

in 20 days

AI Contract Overview

Show more

Sealed bids for the Oak Hill, Central, and South Scotland Sewer Interceptor Upgrades project in Greene Township, Franklin County, Pennsylvania, must be submitted electronically through the PennBid platform by 1:00 p.m. prevailing time on June 29, 2026. The project involves constructing a 30-inch diameter gravity sewer line spanning approximately 9,150 linear feet across three phases—Phase 1 at 3,600 LF, Phase 2 at 3,450 LF, and Phase 2A as an optional alternate at 2,100 LF—along with associated work including trench excavation, backfilling, installation of precast concrete manholes, temporary bypass systems, erosion and sediment control measures, clearing and restoration of wooded areas, fields, and roads, and submission of a post-construction acceptance video. Bids must be accompanied by a certified check, bank money order, or bid bond equal to at least 10 percent of the bid amount, payable to the Owner. A mandatory virtual pre-bid meeting is scheduled for June 8, 2026, via Microsoft Teams, with registration required by June 4, 2026. The contract is funded in part by the Pennsylvania Small Water and Sewer Grant Program through the Commonwealth Financing Authority. Contractors must comply with the Pennsylvania Steel Products Procurement Act, the Pennsylvania Prevailing Wage Act, and federal and state non-discrimination laws, including adherence to wage predeterminations included in the Project Manual and maintenance of records to verify compliance with anti-discrimination requirements. All work must adhere to ASTM, AWWA, ANSI, and Pennsylvania DOT specifications, with materials stored and protected according to temperature and environmental controls to ensure integrity. Inspection and acceptance occur on-site and require the contractor to perform and pay for all testing, including a line acceptance test using a minimum 3.5 psig air pressure with no more than a 1.0 psig drop within specified timeframes. The Owner retains the right to waive minor bid irregularities and reject any or all bids. The contract does not specify a fixed-price type, and while unit-price line items are structured for Phase 1, Phase 2, and Phase 2A alternatives, pricing is left blank for bidder submission. There is no formal FAR clause structure, no requirement for UEI or CAGE codes, no socioeconomic set-asides, and no listed COTR, COR, or PCO; oversight

General Info

Construction of 30-inch gravity sewer pipe in three phases, bids due June 29, 2026, online.

Place of Performance

Franklin County, PA, USA

Set-Aside

NONE

Documents

3

71859 Construction Plan Set for Sewer Interceptor Upgrades May 2026

PDF, High priority: read this firstconstruction-plan-set
High

Addendum 1 to Oak Hill Sewer Interceptor Upgrade Contract Documents

PDF, High priority: read this firstamendment
High

GTMA Oak Hill, Central, & South Scotland Interceptor Upgrade May 2026 Project Manual

PDF, High priority: read this firstspecifications
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

2 updates
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from Jul 9, 2026 to Jun 29, 2026. The notice description changed. The point of contact changed.

Notice updated

The notice description changed. The point of contact changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyPennsylvania → Franklin County
Contacts1 person available
OfficeFranklin County, PA, USA
Office AddressFranklin County, PA, USA
Contacts
Emily Fleischauer

Interested Companies (75)

Insight pipe Contracting
Schuylkill Tree and Landscaping
Gov AlphaBrooklyn, New York

See All 75 Interested Companies

Get full access to view all interested companies, their contact details, and full contractor profiles.

Get full access

Full Description

Show more
SEALED Bids will be received online via the PennBid Program by the Owner until 1:00 p.m., prevailing time, June 29, 2026.
The Project consists of the construction of 30-inch diameter gravity sewer pipe. Additional work associated with the installation of the sewer includes but is not limited to temporary bypassing, trench excavation and backfill, construction and installation of precast concrete manholes, erosion and sedimentation control, post construction acceptance video, clearing, grubbing, and restoration of wooded areas, fields, and roads. Approximate lengths for each Phase are as follows:
a. Phase 1: 3,600 linear feet b. Phase 2: 3,450 linear feet c. Phase 2A: 2,100 linear feet
Bidding Documents are available at no cost at PennBid - https://pennbid.net/
Each Bid shall be accompanied by a certified check, bank money order, or a Bid Bond in an amount not less than 10 percent of the Bid total, payable to the Owner in accordance with the Instructions to Bidders.
Laws and regulations applicable to this Contract include the following:
Commonwealth of Pennsylvania "Steel Products Procurement Act" - Act No. 3 of l978 as amended
Endangered Species Act
Pennsylvania Prevailing Wage Act (Act of 1961, P.L. 987, No. 442). Bidders are subject to all applicable provisions of the Pennsylvania wage laws, and bids shall be prepared accordingly. The applicable wage predetermination is included in the Project Manual.
All contractors on this Project are required to ensure that employees and applicants will not be discriminated against because of race, creed, color, religion, sex, age, handicap, marital status or national origins; and, that the statutes and regulations of federal and state law regarding non-discrimination are met.
The Commonwealth Financing Authority, under the PA Small Water and Sewer Grant Program is providing a portion of the funding for this Project.
Contractors and subcontractors are required to furnish records to ascertain compliance with the Nondiscrimination Clause.
A mandatory pre-bid meeting will be held at 1:00 p.m., prevailing time, June 8, 2026. The pre-bid meeting will be conducted virtually via Microsoft Teams. Anyone interested in participating in the pre-bid meeting should contact Emily Fleischauer at contact@example.gov to receive meeting participation instructions. Please submit your request by close of business on Thursday, June 4, 2026.
The Owner reserves the right, at its option, to waive as an informality any, defects, errors, or omissions in any or all Bids; and to reject any or all Bids.

More opportunities from Pennsylvania → Franklin County

Same awarding agency

NAICS: 237110
SLED
Montour Township Board of Supervisors - Pump Station No. 4 Modifications (General & Electrical)
Solicitation # Montour Township, Columbia County
The Montour Township Board of Supervisors is soliciting bids for the modification of Pump Station No. 4 in Franklin County, Pennsylvania. The project is divided into two separate contracts to comply with state public contracting requirements: Contract 1 for General Construction, covering mechanical, site, and general work, and Contract 2 for Electrical Construction. The scope of work involves the removal and replacement of sewage pumps, brackets, supports, guide rails, controls, level floats, probes, piping, valves, and fittings, as well as the integration of these new components with the existing communication and monitoring system. This project is funded by a Community Development Block Grant, making it subject to specific federal requirements. The contract will be awarded to the lowest responsive and responsible bidder based on a total lump sum bid amount. Bids must be submitted electronically via the PennBid portal by December 8, 2026. Awarded contractors are required to provide performance and payment bonds equal to 100 percent of the contract price, as well as certificates of insurance, within ten days of notification. Additionally, contractors must adhere to Pennsylvania prevailing wage rates and comply with O.S.H.A. safety guidelines and various federal and state non-discrimination and equal employment opportunity certifications. Payment is processed monthly, with a 10 percent retention held until the work is 50 percent complete, at which point the retention reduces to 5 percent. Final acceptance is contingent upon the delivery of record drawings and the approval of the engineer.
Water and Sewer Line and Related Structures Construction

POSTED

7 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS