Oakmont Memorial Park Regulator Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Oakmont Memorial Park Regulator Replacement Project, managed by the East Bay Municipal Utility District, involves the construction of a permanent regulator facility and associated pipelines, valves, and supporting infrastructure in Pleasant Hill, California. This project aims to replace an existing temporary regulator to improve reliability and maintain critical fire flow capacity in the northern portion of the Leland Pressure Zone. Once the new facility is operational, the temporary infrastructure will be decommissioned and demolished. Work will be performed within the public right-of-way along Reliez Valley Road and requires a standard encroachment permit. Construction is scheduled to begin in 2029 and is expected to last approximately one year, with activities primarily limited to weekday hours between 7:00 a.m. and 7:00 p.m. The project will adhere to standard EBMUD environmental and safety practices to minimize public impact.

General Info

EBMUD will replace the Oakmont Memorial Park regulator in Pleasant Hill starting 2029.

Agency

California → East Bay Municipal Utility District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

Location 1: 160’ northwest of Reliez Valley Rd and Silverhill Dr, Pleasant Hill, CA, 94523

Set-Aside

NONE

Documents

(1)

NOE_Contra Costa_Oakmont Memorial Park Regulator Replacement Project_FileNo_2026-00266

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → East Bay Municipal Utility District
Contacts1 person available
OfficeN/A
Organization / Agency
California → East Bay Municipal Utility District
Office AddressN/A
Contacts
Charles NjorogeAssistant Engineer

Full Description

Show more
The project involves the construction of a new regulator facility and associated pipeline, valves, and supporting infrastructure and demolition of the existing temporary regulator and associated pipeline, valves, and supporting infrastructure. Overview and Background The Colorados Pressure Zone Improvements Study (2021) identified the Oakmont Memorial Park Regulator as a critical facility for maintaining adequate fire flow capacity in the northern portion of the Leland Pressure Zone and recommended replacing the existing standby regulator with a permanent facility. The Oakmont Memorial Park Regulator Replacement Project (Project) involves constructing a new permanent facility and associated pipelines, valves and supporting infrastructure to replace the existing temporary regulator. Project Purpose and Objectives The purpose of this Project is to improve the regulator reliability through the construction of a permanent replacement facility. Project Location The Project is located within the public right-of-way along Reliez Valley Road in Pleasant Hill, as shown in Figure 1. Project Characteristics The Project consists of constructing a new regulator and the associated pipelines to supply the facility from the Colorados PZ. Once the new facility is operational, the existing regulator will be removed from service and demolished. Permits and Approvals A standard encroachment permit will be required to perform work within the public right-of-way along Reliez Valley Road. Any necessary permits from the regulatory agencies and jurisdictions will be obtained to complete the Project. Schedule and Work Hours The construction is anticipated to start in 2029 and will take approximately one year to complete. Construction activities will be limited to the daytime weekday hours (7:00 a.m. to 7:00 p.m.) to the extent feasible. EBMUD Practices and Procedures Standard construction environmental and safety practices applicable to all EBMUD construction projects have been incorporated into the Project. These standard practices minimize impacts to the public resulting from EBMUD construction projects.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Hagerstown Wastewater Treatment Plant Improvements - Phase 1
Solicitation # hagerstown-wastewater-treatment-plant-improvements-phase-1
The Hagerstown Wastewater Treatment Plant Improvements - Phase 1 is a solicitation issued by Carl Belt, Inc. for a project located in Maryland. The primary objective is to address aging infrastructure to ensure compliance with nitrogen, phosphorous, and NPDES thermal requirements, thereby improving the water quality of receiving streams and increasing plant reliability. The scope of work includes the replacement of influent screens, washer compactors, in-plant pumps, RAS pumps, and the Operations Building Sanitary Grinder Pump Station. Additionally, the project requires the installation of a headworks enclosure building, a dedicated chemical storage building for ferric chloride or alum, and the replacement of Motor Control Centers, PLCs, and switchgear. Structural repairs to concrete at the headworks and miscellaneous building improvements to HVAC, roofing, and doors are also required. This project is wage rated and strongly encourages participation from small businesses, including veteran-owned, HUBZone, disadvantaged, and woman-owned concerns. Carl Belt, Inc. is specifically seeking MBE, DBE, and WBE participants for various subcontracting roles such as electrical, mechanical, masonry, and painting, as well as suppliers for wastewater pumps, sluice gates, and concrete materials. Bids are due by August 17, 2026, at 4:00 PM and should be submitted to the Cumberland, Maryland office or via the designated online portal. Detailed plans and specifications are available through the company website, and Jared Burkett serves as the primary administrative contact.
Carl Belt, Inc.

POSTED

about 3 hours ago

DEADLINE

in 3 days
View Details
NAICS: 237110
New
Cypress Lake WTP, Wellfield, & Raw Water Main in Osceola County, FL
Solicitation # cypress-lake-wtp-wellfield-raw-water-main-osceola-county-fl
Wharton-Smith, Inc. is soliciting proposals from State of Florida Certified Disadvantaged Business Enterprise (DBE) subcontractors and suppliers for the Cypress Lake WTP, Wellfield, and Raw Water Main project in Osceola County, Florida. This project, owned by the Central Florida Water Cooperative, has an estimated value of 270 million dollars. The scope of work is extensive, encompassing the construction of raw water production wells with well heads and pumps, discharge piping, surge bladder tanks, and site civil works. It also includes the construction of an electrical building, standby generator, wellhead cages, and specialized facilities such as Operations and Reverse Osmosis buildings, a pretreatment chemical building, a post-treatment chemical building, a post-treatment degasification system, and an odor control air exhaust dispersion stack system. Additionally, the contractor must provide production well disinfection and primary and secondary water quality analytical laboratory testing to achieve regulatory certification. The deadline for bid submissions is August 19, 2026, at 2:00 PM EST. Interested parties must submit their proposed scope of work at least 24 hours before the bid date and provide firm pricing by 10:00 AM on the day of the bid. Proposals should be emailed to Nichole Voitel at watergmpbids@whartonsmith.com. Bidding documents, including plans, specifications, and addenda, are available for free download via ConstructConnect. Wharton-Smith, Inc. has indicated a willingness to review responsible quotes and negotiate terms where appropriate.
Wharton-Smith, Inc.

POSTED

about 3 hours ago

DEADLINE

in 4 days
View Details