Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, July 22 at 2:00 PM EDT

Register Free →

OC River Walk Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Agency

California → City of Anaheim

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Between Ball Road and Orangewood Avenue, CA, 92805

Set-Aside

NONE

Documents

(35)

OC River Walk Project Draft Environmental Impact Report Chapter 4

PDFenvironmental-impact-report

Preliminary Geotechnical Evaluation OC River Walk Anaheim and Orange CA

PDFgeotech-report

OC Riverwalk Air Quality and GHG Data Report

PDFreport

OC River Walk Project Draft EIR Section 4.9 Transportation

PDFenvironmental-impact-report

Chapter 7 Individuals and Agencies Consulted

PDFother

OC River Walk Project Hydrology and Water Quality Section

PDFenvironmental-analysis

Appendix B NOP Comments for OC Riverwalk Project

PDFnop-comments

Chapter 3 Environmental Setting - Draft EIR

PDFenvironmental-impact-report

OC River Walk Project Cultural Resources Section

PDFenvironmental-assessment

2023030639_DOT Comment on OC River Walk Project DEIR

PDFcomment

OC River Walk Project Greenhouse Gas Emissions Evaluation

PDFenvironmental-assessment

OC River Walk Project Biological Resources Technical Report February 2025

PDFtechnical-report

Orange County River Walk Project Cultural Resources Survey Letter Report

PDFcultural-memo

Chapter 8 References Document for OC River Walk Project

PDFother

Notice of Determination for OC River Walk Project 2025

PDFnotice-of-determination

City of Anaheim OC River Walk Project Notice of Preparation

PDFnotice-of-preparation

OC River Walk Project Draft EIR Biological Resources Section

PDFenvironmental-impact-report

Appendix G Hydrology and Hydraulics Report for OC River Walk EIR Feb 2025

PDFsow

OC River Walk Project Notice of Completion & Environmental Document Transmittal SCH#2023030639

PDFnotice-of-completion

OC River Walk Project CEQA Summary Form

PDFceqa-summary

OC River Walk Project Tribal Cultural Resources Section

PDFenvironmental-assessment

Chapter 5 Alternatives Analysis for OC River Walk Project

PDFenvironmental-impact-report-alternatives

Environmental Impact Report for OC River Walk Conceptual Master Plan

PDFenvironmental-impact-report

Trip Generation Analysis for OC River Walk Project

PDFanalysis-report

Appendix H Noise Data Report OC River Walk

PDFsupporting-document

OC River Walk Project Description Chapter 2

PDFproject-description

OC River Walk Project Noise Impact Assessment Section

PDFenvironmental-assessment

OC River Walk Project Environmental Impact Report Executive Summary

PDFexecutive-summary

OC River Walk Project Geology and Soils Section

PDFenvironmental-assessment-section

OC River Walk Project Environmental Impact Report Introduction

PDFenvironmental-impact-report

OC River Walk Project Hazards and Hazardous Materials Section

PDFenvironmental-assessment-section

Notice of Availability Draft Environmental Impact Report No. 357 for OC River Walk Project

PDFnotice-of-availability

Draft Environmental Impact Report No. 357OC River Walk Project

PDFenvironmental-impact-report

6_Other CEQA Considerations - Environmental Impact Report Chapter

PDFenvironmental-impact-report

OC River Walk Project Environmental Impact Report - Air Quality Section

PDFenvironmental-impact-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Anaheim
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Anaheim
Office AddressN/A
Contacts
Ana StraabePrincipal Project Planner
William HalliganSenior Director

Interested Companies (1)

Show more
Harris & Associates
Concord, CA

Full Description

Show more
The project consists of various multi-purpose improvements to transform the Santa Ana River corridor and portions of the existing Santa Ana River Trail along with related off-site improvements necessary for its implementation. The main components of the OC River Walk Conceptual Master Plan involve creating two water impoundments by installing three inflatable rubber dams, modifying the riverbanks, constructing two pedestrian/bike bridges, providing new trails, improving existing trails, creating new and protection of existing access ramps, constructing two new undercrossings on the west bank at the UPRR and the Metrolink railroad, providing enhanced community recreation amenities (e.g., terraced seating, nature play areas, parklets, plazas, gathering areas for large-scale events, festivals, and other activities, water access, kayak launch, etc.), and other improvements.

Similar Contracts

NAICS: 237310
New
SLED
Call 001 612187-134319The project involves the design-build replacement of Bridge C-13-038 over State Route 116 (Chicopee Street) in District 2, Massachusetts, under procurement by the Massachusetts Department of Transportation (MassDOT). This is a lump sum contract structured as a Best Value Design-Build (BVDB) procurement, where selection is based on the lowest overall value rating—the total price divided by the cumulative technical score. The scope encompasses full civil, structural, traffic, stormwater, environmental, and utility coordination, including demolition of the existing bridge, new construction, temporary traffic control, public outreach, asbestos inspection and testing, and invasive species management. All unit prices are defined as all-inclusive, covering design, engineering, project management, quality control, equipment, transportation, installation, utilities, insurance, bonds, and warranty. The contract requires submission of both a technical proposal capped at 40 pages and a separate price proposal via the Bid Express platform, with a mandatory 5% bid bond. The technical evaluation is weighted 65% toward the design-build technical approach and 35% toward project management and coordination, with strict pass/fail gates for submission compliance, proper organization, and bid bond submission. The project must be completed within 2,039 calendar days from the anticipated Notice to Proceed date of December 8, 2026, with adjustments allowed if the completion date falls between December 1 and March 15. MassDOT mandates strict adherence to state laws, including MGL Chapter 149A (public construction labor standards), Chapter 268A (conflict of interest), and Chapter 30, §39M1/2 and §151/2 (procurement compliance). The contractor must implement a comprehensive Quality Control System with dedicated full-time managers for design, construction, and fabrication oversight, including independent oversight at fabrication plants beyond the fabricator’s own program. Non-conformance reports must be mitigated through defined procedures. Affirmative Action and Equal Employment Opportunity compliance is required, with firms of 50 or more employees and contracts over $50,000 needing an approved affirmative action plan on file with MassDOT. Disadvantaged Business Enterprise participation must be actively pursued. The contractor is responsible for all bonding, including performance and payment bonds for the full contract amount, and must comply with insurance and risk management standards. All documentation, including escrowed proposal materials, must be certified as complete and used solely
MASSDOT

POSTED

in about 2 months

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
Asphalt Paving & Striping Portwide Unit Price 2026The contract encompasses a broad scope of asphalt paving and striping services to be performed across multiple locations within the Seattle-Tacoma International Airport, Maritime Properties, and surrounding areas. Work includes new asphalt paving and patching, overlays with fabric, crack sealing, seal coating, profile grinding, haulage and disposal of grinding debris, removal of existing pavement markings, surface preparation for new striping, stripe painting, saw cutting and coring of non-hazardous concrete and asphalt, installation of concrete wheel stops, curb repair and replacement, lifting and leveling of concrete sidewalks, and upgrades to road drainage systems, which may require permitting. All tasks are to be completed in accordance with port standards and safety protocols. This is a forecasted unit price contract titled Asphalt Paving & Striping Portwide Unit Price 2026, issued by the Port of Seattle under NAICS code 237310. The contract is administered by Port Construction Services, with primary point of contact Heather Bowden and project manager Lesley Miles available for inquiries. Performance will occur across various port-wide sites, and all work is expected to align with the port’s infrastructure maintenance and development goals. There is no solicitation number provided at this time, and the contract is not yet open for bidding, serving as a planning indicator for future procurement.
Port Construction Services

POSTED

about 1 hour ago

DEADLINE

N/A
View Details