OCSD Permit 21214 for Diversion of Use of Water, Petition for Extension of Time Addendum to the 2001 OCSD Water Project Connection to Camp Meeker System

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Occidental Community Services District is seeking an Extension of Time for Permit 21214 to ensure the diversion and beneficial use of water from a well constructed in 2005. This action is detailed in a 2023 CEQA Addendum to the 2001 Initial Study/Mitigated Negative Declaration, extending the deadline for the permit's conversion to a license to December 31, 2031. The permit allows for a flow rate of up to 0.16 cubic feet per second, or 72 gallons per minute, with a maximum annual diversion of 65 acre-feet. Under Term 13, water diversion must cease between November 1 and June 30 if the Russian River flow at the Guerneville gauging station falls below 140 cubic feet per second. The extension is necessary because current water usage data may not reflect future demands, particularly regarding the Union Hotel, which may transition from its own public water system to OCSD service. While current maximum day demand is estimated at approximately 35 gallons per minute, the calculated buildout demand is 40 gallons per minute. Physical infrastructure associated with the project includes a 90-foot well near the Camp Meeker well site, a new main located within the existing right-of-way from Hampton Road, and a proposed booster pump station. The project is managed by the Occidental Community Services District in California.

General Info

OCSD seeks until 2031 to meet water diversion requirements under Permit 21214, aligning with projected demand and environmental rules.

Agency

California → Occidental Community Services District

NAICS

541620 - Environmental Consulting ServicesView NAICS

Place of Performance

Graton Road, Bohemian Highway, CA, 95465

Set-Aside

NONE

Documents

(1)

OCSD 2023 CEQA Addendum for Water Permit Extension

PDFceqa-addendum

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Occidental Community Services District
Contacts2 people available
OfficeN/A
Organization / Agency
California → Occidental Community Services District
Office AddressN/A
Contacts
Justin WittSenior Planner
Ray LunardiBoard President

Interested Companies (1)

Show more
Brelje & Race
Santa Rosa, CA

Full Description

Show more
Since the 2001 IS/MND, OCSD has completed the physical improvements associated with the project, applied for a water right (Application 31257), been granted Permit 21214 and entered into an agreement with Sonoma Water to appropriate water under Sonoma Water’s water rights to meet limitations associated with Term 13. An Extension of Time was filed to comply with Term 6 of Permit 21214. The Extension of Time was not described in the 2001 IS/MND and is being added to the original project description through this Addendum. The original project description indicated Occidental’s peak water use was 60 gpm. The data provided with the application for Extension of Time indicated average flow during the peak month of approximately 27,200 gallons per day. Using a peaking factor of 1.45, the maximum day demand is approximately 39,500 gallons per day or 27 gpm (0.06 cfs). The extension of time is requested because past data is not likely representative of future demands. A large commercial customer, the Union Hotel, is currently served both by its own public water system and OCSD. The Union Hotel has used little to no water from OCSD in recent years but could start using their OCSD connection at any time. An update to OCSD’s 2008 Source Capacity Planning Study was prepared in 2016 by Brelje & Race . The 2016 study estimated the maximum day demand of OCSD’s existing customer base was slightly over 50,300 gallons per day or 35 gpm (0.08 cfs). This estimate included Union Hotel demands to account for the possibility that they may abandon their public water system and be served solely by OCSD. The calculated buildout maximum day demand was 57,800 gallons per day or 40 gpm (0.09 cfs). Due to OCSD’s unchanged service area and General Plan land uses, this maximum day demand at buildout is still considered appropriate. It is unlikely that the 72 gpm allowance contained in Term 5 will be realized. However, it would not be appropriate to convert Permit 21214 to a license until past data reflects the total potential demands of the service area, including Union Hotel.

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
DEP-BWR-NOI-FY27-M36 Grant ANNOUNCEMENT ONLY
Solicitation # BD-27-1045-BWR00-BWR01-133675
The Massachusetts Department of Environmental Protection (MassDEP) is soliciting interest from Public Water Supplies and municipalities with Water Management Act (WMA) permits or registrations to receive a free American Water Works Association (AWWA) M36 water audit. The program is designed to help entities identify water loss objectives, particularly those failing to meet the Unaccounted-for Water (UAW) performance standard of 10 percent or less. Depending on previous audit history and data validity scores, eligible participants can receive either a Top-Down Audit or a Bottom-up Component Analysis. MassDEP will hire a private consulting firm through a separate public procurement process to conduct these audits. Selection is based on criteria including high UAW rates, WMA allocation status, recent improvement efforts, and permit status, with priority given to WMA permit holders and projects benefiting disadvantaged communities. Participation is limited to entities in compliance with the MBTA Communities Act Law. Selected applicants must provide a written commitment to have detailed system information for 2025 or 2026 available by January 15, 2027, and submit that data by February 2, 2027. Additionally, participants must commit significant personnel time as an in-kind match and be prepared to enter into a contract within 15 to 30 days of the grant award. Responses to this Request for Interest are due by October 21, 2026.
BWR00 - Bureau of Water Resources

POSTED

about 16 hours ago

DEADLINE

in 29 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS