This Solicitation opportunity from Ohio was posted on May 28, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
ODNR, Division of Oil & Gas Resources Managment - Natural Resources Park Mill Building Enhancements
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the comprehensive renovation of the ODNR Oil & Gas Mill Building within the Natural Resources Park at the Ohio EXPO Center & Fairgrounds. The scope includes installing new flooring, base molding, and wall coverings, specifically vinyl plank flooring in two designated areas, along with the replacement of existing wall coverings with tongue and groove pine paneling. The flooring installation requires surface preparation, leveling, and adherence to manufacturer’s guidelines, with specific details on materials such as COREtec vinyl planks with waterproof cores and cork underlayment. Transition moldings and pine wood base and crown moldings are also specified to ensure a cohesive aesthetic. Additionally, the contractor must frame around existing protrusions, replace existing trim, and install new pine trim and corner moldings, ensuring proper acclimation and installation techniques. The project schedule mandates completion between August 4, 2025, and October 17, 2025, with site visits available by appointment prior to the work. Bidders are required to submit proposals through Ohio Buys, with the contract awarded to the lowest responsive and responsible bidder based on the total bid amount. The contract documentation emphasizes compliance with Ohio’s standard terms and conditions, including provisions related to legal and ethical standards, data security, and foreign service restrictions, notably prohibitions on offshore services and investments from certain foreign entities. The contractor must also complete affirmation and disclosure forms affirming understanding of executive orders related to offshore data and Russian entities, and disclose all relevant business and data storage locations. Overall, the contract ensures detailed specifications, strict adherence to legal requirements, and a clear schedule for successful project completion.
General Info
Place of Performance
OH, USASet-Aside
Documents
5AI Contract Breakdown
Uniform Contract FormatContract not broken down yet
CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.
Timeline
Submission Closed
Organization & Contact Information
Full Description
Door Transition Molding: Vinyl transition molding shall be installed at all doorway thresholds. Two doorways are approximately 36” wide. The third main doorway is approximately 98” wide. Vinyl transition molding shall be manufactured by COREtec in style and color to match vinyl flooring specified above.
Wall Base and Crown Molding: Wall base and crown moldings shall be pine wood 1”T x 3”W and finished to match the pine paneling. Wall base molding shall be installed in all areas to receive new flooring, approximately 66’ in main area and 24’ in storage area. Wall crown molding shall be installed in main area only.
Wall Covering Replacement: Contractor shall remove and properly dispose of existing wall covering material, which is a wood slat material. Contractor shall frame around existing pipe stack protruding through wall. Framing material shall be wood. Measurements of frame out are approximately 36” x 8” x 8”. Contractor shall provide any additional blocking as needed to support wall covering per manufacturer’s recommendations. Wall covering shall be tongue and groove pine paneling. Square edge with no reveal. Thickness: 3/4” Width/Face Coverage: 4-7/8” (referred to as 5”) Select Wood Grade: No. 1, C&Btr Texturing: Sanded Smooth Finish: Water Based Polyurethane in satin
Acclimate wood for a period of 2 weeks in proper storage at the job site. Install boards horizontally with joints minimized. Joints shall be minimized, and any joints shall be staggered. Boards shall be fastened in accordance with the manufacturer’s requirements. Walls dimensions are 184” x 135” and 204” x 135”. Existing wood trim around doors and windows is to be replaced with new pine trim 1”T x 3”W. Finished to match the pine paneling. Total length is approximately 576” for windows and 671” for doors. Interior corners to be trimmed in pine quarter round and finished to match the pine paneling. Total length is approximately 540”.
Schedule:All work shall be completed between August 4, 2025, and October 17, 2025.Site Visit & Point of Contact:Site visits are available by appointment only. Please request a site visit 48 hrs in advance of desired date and time. Site visits are available from Monday through Friday, 5/30/2025 through 6/10/2025 between the hours of 12-5pm.To schedule an appointment, contact:Doug Cunningham @ +1 (555) 000-0000 or email contact@example.gov contract is awarded, failure of the bidder to have requested a site visit to become familiar with the facility and requirements of the bid will be insufficient reason to support any request to be released from the contract.Please note the following directions on map to gain access to fairgrounds. There is heavy construction on the grounds. Please take care travelling through the fairgrounds. If employees are working the gates please inform them that you are going to the Natural Resources Park for a site visit. No payment is required for entry.You will need to access fairgrounds via 17th avenue, Turn right towards Ohio History Center, Turn left on Velma Avenue and proceed south past Celeste Center to Natural Resources Park. Park in the area below on the second map. Map of route below.Evaluation: The contract will be awarded to the lowest responsive and responsible bidder as determined by the State. All Proposals must be submitted through Ohio Buys. Proposals received outside of Ohio Buys will not be considered.Contract Award: The contract will be awarded to the lowest responsive and responsible bidder by low lot total. Low lot total will be determined by multiplying the unit cost by the estimated usage listed in the bid and then adding each of the totals together to arrive at a total for all items. Failure to bid all items may result in the bidder being deemed not responsive
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
