Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Ohio was posted on March 26, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ODOC - Live Fire Training Structure Repairs FY26

Closed
SRC0000029216State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The Ohio Fire Academy (OFA) requires vendors to submit bids for the maintenance and inspection of its live fire training structure. This contract outlines the expectations for labor and materials necessary to complete mandatory National Fire Protection Association (NFPA) inspections, specifically NFPA 1402 and 1403 standards. The project includes maintenance of System 203 thermal lining systems and fire paver floors and requires a general inspection of the building, which includes the removal and replacement of tiles for engineering assessments. The scope of work involves replacing missing or loose bolt holes, tightening of anchors, replacement of damaged joint packing, and addressing deficiencies in approximately 400-500 fire pavers and 25-50 thermal lining tiles. Any additional work identified during the process necessitates a proposal for completion. The contract emphasizes full compliance with NFPA standards and dictates that the structural integrity of the live fire training structures must be assessed by a licensed professional engineer or another qualified professional every five years or more frequently, as needed. Should a second round of bidding be necessary, vendors must submit new bids since previous submissions do not automatically carry over. The project enjoys a financial scope ranging from $50,000 to $150,000, with the work estimated to require temporary heating for three to four days. Interested parties are encouraged to contact David Belcher for inquiries and further clarification regarding the contract details and requirements. The deadline for submitting bids is set for May 1, 2025.

General Info

OFA seeks bids for live fire training structure maintenance, adhering to NFPA inspection standards.

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • MAIN WASTEWATER TREATMENT PLANT SECONDARY REACTORS REHABILITATION,PHASE 2, SPECIFICATION SD-462Open now, due in 15 days
  • PURIFIED WATER REPLENISHMENT SAN JACINTO VALLEY ADVANCED WATER PURIFICATION FACILITY SPECIFICATION NO. 1472WOpen now, due in 2 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

1 update
PhaseClosed
Posted

Solicitation

Notice updated

Response deadline changed from May 27, 2025 to Apr 11, 2025. The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyOhio → COM100000 Administration COMTUSG
Contacts1 person available
OfficeN/A

Full Description

Show more
OHIO FIRE ACADEMY (OFA) LIVE FIRE TRAINING STRUCTURELabor and material to complete required NFPA inspections (Including but not limited to NFPA 1402 & 1403) and maintenance of the OFA live burn facility with System 203 thermal lining system, and fire paver floors for the following broken down below.            *Including a general inspection of building / system, that involves removal (and replacement) of tiles for engineering inspection. (Per NFPA) Once required NFPA inspection completed, overall general inspection for; replacement of missing or loose bolt holes, tightening anchors as required, replacement of missing or badly damaged joint packing mix, replacement of 400-500 missing or badly cracked fire pavers and replacement of approx. 25 – 50 thermal lining tiles. If additional work is required, advise of that requirement and submit a proposal to complete same.                                                                                                                                                         Original quantity   Estimated quantity   Tile Maintenance      5000                1500-1600  Replacement Tiles                                 25-50  Packed Joints             200 Inft          100 -150 Inft  Temporary Heat                                    3-4 days   Fire Brick                18000                   500*All in compliance with NFPA Standards, and Ohio Department of Public Safety Division of EMS (excerpt only, below) NFPA 1403, Chapter 7.2 Non-Gas-Fired Live Fire Training Structures and Mobile Enclosed Live Fire Training Props (2018)7.2.7 The structural integrity of the live fire training structure shall be evaluated and documented by a licensed professional engineer with live fire training structure experience and expertise or by another competent professional as determined by the AHJ at least once every 5 years or more frequently if determined to be required by the evaluator.Please contact david Belcher with any Sign up to see this detail 

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS