Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 14 at 2:00 PM EDT

Register Free →

ODRC-SCI- 5 -year Structural Fire Escape Inspection- J. Spergin

Active
SRC0000041982State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Ohio Department of Rehabilitation and Correction is seeking a professional structural engineering firm to perform safety inspections and code certifications for six exterior emergency egress structures at the Southeastern Correctional Institution in Lancaster, Ohio. This project is specifically designed to remedy State Fire Marshal Violation 1104.16.5.1 and ensure compliance with Ohio Fire Code Section 1104.16.5.1. The scope of work includes the inspection and certification of two 2-story cantilever fire exits and four 2-story metal fire escapes. The selected consultant must conduct a three-phase process consisting of a field investigation and visual inspection, mandatory structural live load testing to verify a minimum capacity of 100 lbs/sq. ft., and the delivery of a final report signed and sealed by a Professional Engineer registered in the State of Ohio. This is a fixed-price contract managed through the Ohio Buys eProcurement platform. The contractor is responsible for providing all necessary equipment, including aerial lifts and certified test weights, and must adhere to strict correctional facility security protocols, including background screenings and tool logging. Key contractual requirements include maintaining comprehensive insurance coverage, including a 1 million dollar annual aggregate for commercial general liability and a 1 million dollar limit for employer liability. Additionally, the contractor must comply with Executive Orders prohibiting the use of offshore services and Russian institutions. Final payment is contingent upon the agency's acceptance of the final sealed certification report, with payments typically due within 30 calendar days of receiving a proper invoice.

General Info

Structural engineering firm to inspect and certify six fire escapes in Lancaster, Ohio.

Documents

(13)

Ohio DRC Service Contract Template - Southeastern Correctional Institution

DOCX•11 pages•contract-document

SOW: Five-Year Structural Fire Escape Inspection & Load Testing - Southeastern Correctional Institution

PDF•2 pages•sow

Affirmation and Disclosure Form (Rev. 3/22)

PDF•2 pages•other

Executive Order 2019-12D Governing Expenditure of Public Funds for Offshore Services

PDF•executive-order

Executive Order 2022-02D Ohio Response to Russia's War on Ukraine

PDF•executive-order

OhioBuys Fact Sheet for Bidders and Suppliers

PDF•2 pages•other

Ohio Buys Viewing and Responding to Solicitations Guide v2.5

PDF•24 pages•other

3F43A31E-8D90-428E-94EF-45BE6471F88E.png

PNG

4D3B573A-A435-4C9E-B028-48F93291D6B4.png

PNG

A40BEA53-9E6B-4A50-AE6C-0BF7103F3E96.png

PNG

C0F248C5-7143-4CA2-87A1-414BAAEAE6A8.png

PNG

Chapel_A.jpg

JPG

Chapel_B.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyOhio → Drc231500 Southeastern Correctional Inst Seci
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
ODRC is seeking proposals to identify a vendor to provide the items listed below in the quantities identified in Ohio Buys to Scope of Work (SOW) / Specifications PackageOhioBuys Solicitation Type: Quick Quote / RFQ Agency: Department of Rehabilitation and Correction(ODRC)Facility: Southeastern Correctional Institution (SCI) Location: 5900 BIS Rd SW, Lancaster, OH 43130Regulatory Mandate: Ohio Fire Code 1104.16.5.1 Inspection Interval: Required 5-Year CertifiedInspection1. PURPOSE & OBJECTIVEThe State of Ohio, Department of Rehabilitation and Correction (ODRC), on behalf of the SoutheasternCorrectional Institution (SCI), is soliciting competitive electronic quotes through OhioBuys for professionalStructural Engineering services. The contractor shall provide all engineering expertise, labor, materials,equipment, and testing tools required to execute a complete structural safety inspection and code certificationfor six (6) specific exterior emergency egress structures.This inspection is strictly required to satisfy and clear active State Fire Marshal structural violationdocumentation issued under Ohio Fire Code (OFC) Section 1104.16. At the following Location: Southeastern Correctional Institution Project Objective: Code Certification of Emergency Egress Systems to Remedy State Fire Marshal Violation 1104.16.5.1 1. OBJECTIVE & REGULATORY COMPLIANCE The Consultant shall perform a professional engineering inspection, structural evaluation, and physical live load testing to certify life-safety egress systems. All work must strictly comply with Ohio Fire Code (OHFC) Section 1104.16.5.1, verifying that all stairways, balconies, ladders, cantilevers, and structural anchorages safely support a minimum uniform live load of 100 lbs/sq. ft. 2. SCOPE OF SERVICES Phase 1: Field Investigation & Pre-Test Visual Inspection • Cantilever Systems (2 Units): Inspect the pivot points, counterweights, cables, pulleys, release mechanisms, and structural framing elements of the two (2) designated 2-story cantilever fire exits to ensure complete operational balance and safe deployment. • Metal Fire Escapes (4 Units): Inspect all treads, risers, stringers, handrails, guardrails, platforms, grating, and connection brackets across all four (4) 2-story metal fire escapes. • Corrosion & Section Loss Evaluation: Quantify and document areas of localized rust, pitting, scaling, and material section loss on all structural steel components to ensure safe load testing execution. • Anchorage Analysis: Examine all structural connections to the building's main frame, including through-bolts, expansion anchors, embedded plates, and structural welds. Phase 2: Mandatory Structural Load Testing • Test Plan Design: The engineer shall develop a controlled structural load-testing protocol detailing exact weight placement, structural loading steps, safety boundaries, and deflection criteria. • Testing Execution: The engineer shall supply, coordinate, and witness the placement of certified test weights (such as water bladders or calibrated blocks) to confirm the mandated code capacity of 100 lbs/sq. ft. • Cantilever Function Testing: Perform operational drop-tests on the two cantilever systems to confirm unhindered functional movement and reliable gravity deployment under emergency situations. Phase 3: Reporting & Certification • Condition & Deflection Assessment: Detailed logs, descriptive field notes, and complete photographic logs of each of the six (6) structures under static and loaded environments. • Deficiency Log: A prioritized list of material defects, physical failures, or code compliance gaps identified during inspection and testing. • Repair Specifications: Specific engineering guidance and repair criteria for any necessary structural remediation (e.g., weld procedures, anchor retrofits, paint/coating specifications). • Compliance Certification: A signed and sealed professional engineering statement confirming that the structures comply with the 5-year fire escape safety requirements. 3. DELIVERABLES • Draft Inspection & Testing Report: Submitted electronically for facility administrative review within 14 business days of completing field investigations. • Final Certified Report: Three (3) hard copies and one (1) high-resolution digital PDF file containing the final report, officially stamped and signed by a Professional Engineer (PE) registered in the State of Ohio. 4. SPECIAL CONSIDERATIONS & SECURITY • Correctional Facility Environment: The Consultant must comply with all institution security protocols, background screening checks, gate clearance protocols, tool logging rules, and secure escort requirements. • Access & Test Equipment: The Consultant is solely responsible for providing all necessary ladders, scaffolding, aerial lifts, rigging gear, certified weights, and testing hardware required to perform the scope safely. 5. OHIO BUYS PLATFORM & INVOICE ROUTING Contract procurement, initial award bidding, and formal Purchase Order (PO) generation are processed entirely through the Ohio Buys eProcurement platform. Invoicing can be completed outside of the Ohio Buys platform. All project invoices must be submitted directly to the institution's procurement officer or authorized employee for verification and processing. 6. FINANCIAL & INVOICING TERMS • Pricing Model: This contract is structured as a Fixed-Price Statement of Work. The agreed-upon total fee encompasses all field equipment, travel, background screening compliance, and engineering reporting fees. • Invoicing Schedule: Invoices may be submitted to the institution's procurement agent upon successful receipt, review, and final acceptance of Deliverable 3 (Final Sealed Certification). Site Visits are encouraged during the bidding cycle. Contact: Jamie Spergin at jamie.m.spergin@drc.ohio.gov or 740-994-0780.
Those wanting to bid will follow the instructionprovided in the document and submit all therequired documentation via Ohio Buys. All bids andinquiries must come through the Ohio Buys Portal.The solicitation adheres to the dates provided withinOhio Buys, shall any changes in dates be necessarysuch information will be posted in Ohio Buys. If thereis a need for technical support during proposalsubmission contact 1-877-644-6771 or 1-614-466-5090. This number is for technical support questionsonly. No questions regarding this specific solicitationcan be answered by those reached at these listednumbers. For solicitation- specific questions, utilizecommunications methods provided in Ohio Buys. Vendor recommended to sight visit prior to placing a proposal.
Structural engineering
Items I1_000001 | Required Item | Structural Inspection & PE Certification: 2 Cantilever Exits and 3 Metal Fire Escapes : 2 Cantilver

Similar Contracts

Same NAICS industry code

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS