This Solicitation opportunity from Department Of Transportation was posted on November 6, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
Ogden-Hinckley Airport (OGD) Air Traffic Control Tower (ATCT) Design-Build
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
The contract involves the design and construction of a new Air Traffic Control Tower at Ogden-Hinckley Airport, Utah, with a performance period of 913 calendar days post-Notice to Proceed, which is contingent upon a favorable NEPA review. The project scope requires comprehensive services including all labor, materials, equipment, permits, and compliance with federal, state, and local regulations, with the work governed by detailed specifications, drawings, and FAA standards. The procurement is an unrestricted, firm fixed-price, lump-sum contract estimated between $40 million and $65 million, with the final NTP issued only after environmental clearances are obtained. The technical scope emphasizes energy efficiency, adherence to FAA standards, and a design life of at least 50 years. The solicitation is structured in two phases, with Phase I focusing on evaluating Offerors based on past performance, corporate experience, key personnel, and technical understanding, rated through adjectival categories such as "More Confidence" and "Satisfactory Confidence." The top four Offerors will be selected to proceed to Phase II, where proposals will be further assessed on design approach, schedule, management, and price, with a best value trade-off determining the award. Evaluation criteria prioritize non-cost factors over price, and proposals are evaluated for strengths, weaknesses, and risks. The process involves detailed proposal formatting requirements, including two separate volumes per phase, strict page limits (notably 5 pages for technical approach in Phase I and 20 pages for preliminary design in Phase II), and electronic submission via the FAA’s KSN site, with contacts provided for access requests. The contract incorporates numerous clauses and referenced documents, including wage determinations, bonds, and security requirements, with a focus on compliance, quality control, and security clearances for contractor personnel.
General Info
Place of Performance
Ogden, UT, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
*Amendment 3 to solicitation 697DCK-25-R-00437 was issued on November 6, 2025. The purpose of amendment 3 is to incorporate questions and answers 3. All other terms and conditions remain unchanged. See Amendment 3 for all changes
-------------------------------------------------------------------------------------------------------------------------------
*Amendment 2 to solicitation 697DCK-25-R-00437 was issued on November 3, 2025. The purpose of amendment 2 is to extend the proposal due date to November 14, 2025 no later than 1700 ET. This amendment will also incorporate questions and answers 2. All other terms and conditions remain unchanged. See Amendment 2 for all changes
---------------------------------------------------------------------------------------------------------------------------------
*Amendment 1 to solicitation 697DCK-25-R-00437 was issued on October 17, 2025. The purpose of amendment 1 is to update past performance criteria, incorporate questions and answers, and add attachment 1 and attachment 13 to section J. All other terms and conditions remain unchanged. See Amendment 1 for all changes.
--------------------------------------------------------------------------------------------------------------------------------
***A FINAL NEPA REVIEW HAS NOT BEEN CONDUCTED. NTP (Notice to proceed) will not be issued until we have a favorable NEPA finding for this site.***
Contractor shall furnish all labor, materials, services, equipment, insurance, security notifications, licenses, permits, and fees in accordance with applicable Federal, State, and local regulatory requirements to DESIGN AND BUILD A NEW AIRPORT TRAFFIC CONTROL TOWER (ATCT) FACILITIES OGDEN-HINCKLEY AIRPORT (OGD) IN OGDEN, UTAH. All work shall be in accordance with the specifications, drawings, contract clauses, and wage rates, as described in this Solicitation
Due to their file sizes (as they are too large to transmit via email) interested offeror's must email both (contact@example.gov) and (contact@example.gov) to request access to the FAA's KSN Site to download all Section J Attachments. Please provide name, phone #, and email address for this KSN P.O.C. (limit one KSN P.O.C. per perspective offeror).
More opportunities from Department Of Transportation → 697DCK Regional Acquisitions Svcs
Same awarding agency
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
