Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Ogdensburg Custom House Water Infiltration Project

Active
GS-02P-14-PW-C-0016Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract involves construction work at the Robert C. McEwen U.S. Customs House in Ogdensburg, NY, aimed at mitigating groundwater infiltration into the basement. The project scope includes repairing the storm sewer system, installing foundation drains and a French drain system, adding a catch basin to intercept rainwater, repairing and waterproofing the stone foundation wall, renovating pavements and sidewalks, repairing the storm drain seawall outlet by the river, and performing necessary excavation, backfill, and site restoration. The contractor is responsible for providing all labor, materials, equipment, tools, and supervision, and must comply with the specified design specifications and drawings. The contract requires a single prime contractor and encompasses a variety of systems such as plumbing, mechanical, electrical/lighting, and security. This construction project is estimated to cost between $250,000 and $500,000 and will be awarded as a firm fixed price sealed bid contract under FAR 14.408-1 to a responsible HUBZone-certified bidder meeting the solicitation requirements. Performance and payment bonds, as well as a bid guarantee, will be required in accordance with the Miller Act. The anticipated start date is April 1, 2015, with an approximate completion time of 150 days, noting that work is weather-dependent and will not be conducted during winter months. Interested bidders must be registered in the System for Award Management (SAM) with completed representations and certifications. The solicitation was expected to be issued around early July 2014, with bids due by early August 2014, and detailed drawings and specifications will be provided upon request after the solicitation release. The contracting officer and project engineer are available for inquiries.

General Info

Construction at McEwen Customs House to prevent groundwater infiltration; fixed-price, HUBZone bidders only.

Contract Value

$414,975

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

Robert Mcewen, Ogdensburg Custom House, OGDENSBURG, NY, 13669, USA

Set-Aside

HZC

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyGeneral Services Administration → Pbs R2 Upstate Ny Srvce Ctr
Contacts2 people available
OfficeALBANY, NY, 12207, USA
Office AddressALBANY, NY, 12207, USA
Contacts
David G. BullardContracting Officer
James M. McKenzieEngineer

Full Description

Show more
"Correct Water Infiltrations Problems at Robert C. McEwen U.S. Customs House" 127 North Water Street, Ogdensburg, NY 13669 Project Number RNY 00569 The Government announces its requirement to procure construction service to perform site alteration work at the Robert C. McEwen U.S. Customs House, Ogdensburg, NY so ground water infiltration into the basement level of the Robert C. McEwen U.S. Customs House is mitigated. Under this project, the on-site storm sewer system will be repaired, foundation drains and a French drain system will be installed, a catch basin will be installed in the front of the customs house to intercept rainwater, the stone foundation wall at the customs house will be repaired and waterproofed, pavements and sidewalks will be renovated, the storm drain seawall outlet at the river will be repaired; and excavation, backfill, and site restoration work shall be provided so site alteration work can be performed. The Contractor shall provide all labor, material, equipment, tools, management, and supervision. Base work shall include, but is not limited to general construction of finishes, plumbing, mechanical, electrical/lighting, security and related systems; exact work description is identified and indicated in the Contract Documents. Products to be used are specified within the drawings and individual Specification Sections. The contractor shall comply with the project's design specifications and drawings. The work will be constructed under a single prime contract. In accordance with FAR 14.408-1, award will be made as a firm fixed price sealed bid construction contract to a responsible bidder whose bid, conforms to the invitation, will be most advantageous to the Government, considering only price and the price-related factors included in the invitation. The magnitude of this construction project is estimated between $250,000 and $500,000. The appropriate NAICS Code is 236220, with a size standard of $33.5 million dollars. Performance and payment bonds will be required following award pursuant to the Miller Act. A bid guarantee is also required. The procurement is 100% set aside for HUBZone businesses. The required construction completion date is approximately 150 days commencing one day after Notice to Proceed. The tentative solicitation release date is no earlier than 15 days after posting of this notice in FedBizOpps. To insure that you receive all information regarding this solicitation, be sure to register to receive updates at www.fbo.gov. It is anticipated that the solicitation (IFB) will be issued on or about July 03, 2014 with bids due or about August 03, 2014. This is a weather dependent project, and work will not be performed during winter months. The anticipated notice to proceed is 1 April 2015. There is no information available until the issue of the solicitation via the Internet. All potential Offerors must have an active registration in the System for Award Management (SAM). All prospective Offerors are required to have completed the Representations and Certifications in SAM. Drawings and specifications will be mailed to interested vendors who send a document security form to the Contracting Officer, David bullard at david.bullard@gsa.gov once the solicitation is released. The point of contact for this synopsis is David Bullard, Contracting Officer, 315-448-0930, david.bullard@gsa.gov

Similar Contracts

Same NAICS industry code

NAICS: 236220
New
Federal
Y--Cove Day School Construction
Solicitation # 140A1627B0003
The Bureau of Indian Affairs, under the Department of the Interior, is seeking a contractor for a turn-key replacement campus project for the Cove Day School located in Red Valley, Arizona. This comprehensive construction effort includes the development of a new K-6 school building, a maintenance building, six employee quarters, site infrastructure, playgrounds, a water well and storage system, and improvements to the wastewater lagoon. The contractor is responsible for providing all labor, supervision, materials, and equipment, as well as the provision of Information Technology infrastructure and Furniture, Fixtures, and Equipment. The project requires adherence to the 2007 BIA School Facilities Design Handbook, NFPA 5000, and Division of Safety and Risk Management requirements, with a mandate to achieve LEED certification. This procurement is designated as a set-aside for Indian Small Business Economic Enterprises under NAICS code 236220, with an estimated construction magnitude exceeding 10 million dollars. The acquisition will follow FAR Part 14 Sealed Bidding procedures, with the anticipated solicitation issue date of October 30, 2026. Final project acceptance is contingent upon the delivery of a Certificate of Occupancy, operational turnover documentation, and asset capitalization records. Primary coordination for the project will be managed through the Contracting Officer, Laurie Sherrod, and the Division of Facilities Management and Construction.
Bureau Of Indian Affairs

POSTED

about 3 hours ago

DEADLINE

N/A
View Details
NAICS: 236220
New
SLED
JBLM Construct CHP Building
Solicitation # W912K3-26-R-A0001
Solicitation W912K3-26-R-A0001 is a Small Business Set-Aside for the design-bid-build construction of a 20,000 square foot Pre-Engineered Steel Controlled Humidity Preservation (CHP) Building at Joint Base Lewis McChord, Washington. The project, estimated between 1 million and 5 million dollars, involves the purchase and erection of the steel building and concrete slab, installation of underground utilities, and the implementation of specialized systems including desiccant dehumidifying equipment and a dry pipe fire suppression system. The facility will also be solar-ready, featuring conduit installed below the roof structure for future photovoltaic panels. All work must comply with JBLM Department of Public Works requirements and various technical standards, including NFPA 13 for fire protection and IBC 2021 for structural design. The contract is a Firm Fixed Price task order to be awarded based on a balanced evaluation of technical capability and price. Technical evaluations will focus on the proposed project schedule, which must show completion within 360 to 365 calendar days of the Notice to Proceed, and the qualifications of key personnel. Performance requires adherence to Davis-Bacon prevailing wage rates for Pierce County and strict quality control standards, including USACE validation of testing laboratories. Awarded contractors must provide payment and performance bonds for projects exceeding 150,000 dollars and submit all invoicing via Wide Area Workflow. Offers are due by October 18, 2026.
Bristol Alliance of Companies

POSTED

about 9 hours ago

DEADLINE

in 2 days
View Details
NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for a project under the Inland Empire Utilities Agency in California. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) under the Department of Transportation, falling under NAICS code 236220. The solicitation was posted on October 16, 2026, with a response deadline of November 4, 2026. The primary point of contact for this effort is Richie Tran. To ensure project financing and bid responsiveness, contractors must strictly adhere to comprehensive Good Faith Effort (GFE) requirements. Mandatory requirements include posting solicitations in an online publication for 30 consecutive calendar days and in a print newspaper for at least one day prior to the bid opening, as well as providing proof of utilizing the Small Business Administration (SBA) and Minority Business Development Agency (MBDA). While outreach documentation such as call logs and emails may be submitted up to three business days after the bid closing, failure to include proof of publicity and agency assistance within the initial bid package will result in the proposal being deemed non-responsive. The project area for subcontracting opportunities is designated as Riverside or Los Angeles.
RT CONTRACTOR CORP

POSTED

about 9 hours ago

DEADLINE

in 18 days
View Details
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day wastewater treatment plant located at 41901 Walnut Avenue in Greenfield, California. Managed by C. Overaa & Co., the project has a total duration of 915 calendar days and is divided into four distinct phases: site preparation including soil stabilization and utility relocation; construction of the plant featuring a packaged Membrane Bioreactor (MBR) system, SCADA, and support buildings; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension for water and sewer services. A critical requirement of the project is maintaining the existing plant's operation and regulatory compliance throughout the first two phases of construction. This solicitation is open to qualified subcontractors and suppliers, with a strong emphasis on participation from small and disadvantaged businesses, including DBE, DVBE, WOSB, and SDVOSB entities. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Bidders must attend a mandatory pre-bid meeting on October 5, 2026, and submit bids by the deadline, noted as November 10, 2026. Subcontractors are required to accept the Overaa standard agreement without modification, provide a 100 percent performance and labor bond if requested, and utilize the Textura electronic system for invoicing and payments.
C. Overaa & Co.

POSTED

about 9 hours ago

DEADLINE

in 24 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS