Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

OIivehurst Public Utility District South County Service Area Improvements Project

Forecast
8753-110State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Olivehurst Public Utility District South County Service Area Improvements Project, identified as project number 8753-110, is a comprehensive wastewater infrastructure initiative funded by the State Water Resources Control Board. The project aims to expand and upgrade the wastewater collection system to utilize unused capacity at the Olivehurst Public Utility District Wastewater Treatment Plant, enabling the processing of untreated wastewater from the City of Wheatland. The scope is divided into three primary components: the implementation of sanitary sewer overflow reduction measures in Olivehurst, including retrofits to pump station PS-1, a new pump station PS-2, and an eight-inch force main on McGowan Parkway; the modification of the wastewater treatment plant to handle increased wet weather flows and the replacement of obsolete equipment; and the construction of a new treatment system to connect the City of Wheatland to the existing collection network. The project is located in Yuba County, California, with specific work occurring at the 38-acre treatment plant site and across various pipelines, including installations below Reeds, Hutchinson, and Kimball Creeks. Environmental compliance is a critical requirement, as the project is subject to the California Environmental Quality Act and requires adherence to a Mitigated Negative Declaration. Additionally, work involving creek crossings must comply with Section 1602 of the Fish and Game Code under Streambed Alteration Agreement EPIMS Notification No. YUB-63747-R2. The Olivehurst Public Utility District serves as the lead agency, with the City of Wheatland carrying out the project. Key administrative contacts include General Manager John Tillotson for the utility district and City Manager Bill Zenoni for the City of Wheatland.

General Info

Wastewater infrastructure project expanding collection systems and treatment capacity for Olivehurst and Wheatland.

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
PhaseForecast
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → Olivehurst Public Utilities District
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Alexander FunkEnvironmental Scientist
John TillotsonProject Proponent

Full Description

Show more
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement EPIMS Notification Number YUB-63747-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Olivehurst Public Utility District (OPUD). The project is limited to improvements to the existing wastewater treatment plant facilities as part of a three component Project identified as the OPUD Pump Station and Pipelines Project (previously known as the Wheatland sanitary sewer overflows (SSO) Infrastructure Project). Pipelines will be installed below all 3 creeks.

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
26350 Lynchburg, VA - CSO 70 Sewer Improvements
Solicitation # 2027-027
Cleary Construction is soliciting quotations from certified Disadvantaged Business Enterprises (DBEs) for the City of Lynchburg CSO 70 Sewer Improvements project in Virginia. This solicitation, identified as IFB 2027-027, is open to various small business set-asides, including SBA certified Veteran Owned, Service-Disabled Veteran Owned, Women-Owned, and HUBZone small businesses. Interested firms must submit their responses by December 4, 2026. The scope of work involves comprehensive sewer improvements utilizing both open-cut and trenchless installation methods. Key deliverables include the installation of PVC and DIP piping in various diameters, the construction of standard and doghouse manholes, and the execution of trenchless crossings with associated launch and receiving shafts. Additional requirements include CSO regulator fit out, outfall construction, and the abandonment of existing pipes and manholes. Site preparation tasks encompass clearing and grubbing of wooded areas, seeding, fine grading, and select tree removal. Critical project requirements include the implementation and maintenance of a Stormwater Pollution Prevention Plan (SWPPP), geotechnical instrumentation and monitoring, and the procurement of railroad insurance. The project involves significant excavation work, including extra depth excavation for pipes and manholes. Primary contact for this opportunity is John Connelly at Cleary Construction.
Cleary Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 26 days
View Details
NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project for the City of Belmont, North Carolina, involves the construction of 16,435 linear feet of 20-inch ductile iron force main and significant upgrades to the Morgans Branch Pumping Station. The scope of work includes installing a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. Key deliverables include the installation of mechanical and electrical systems, such as pumps, a generator, and odor control equipment, along with new gravity sewers and manholes. The project has an estimated value of 16,690,000 dollars and a performance period of 560 calendar days following the Notice to Proceed. The contract is being solicited as a small business set-aside and will be awarded to the responsible bidder submitting the lowest responsive bid. Bidders must provide a signed bid form, bid bond, evidence of authority to sign, and MWBE compliance documentation, including a Good Faith Efforts Form and Table A. The project is governed by EJCDC standard general and supplementary conditions, with technical requirements adhering to AWWA, NEMA, AWS, and ASTM standards. Contract administration is managed by Willis Engineers, and the contractor is required to furnish performance and payment bonds equal to the contract price, as well as insurance from companies with an A.M. Best rating of A-VII or better.
Don Moorhead Construction, Inc.

POSTED

about 5 hours ago

DEADLINE

in 2 days
View Details
NAICS: 237110
New
Jefferson St. Pump Station Replacement
Solicitation # ITB-2026141
WG Construction is seeking MBE/WBE subcontractors for the Jefferson Street Pump Station Replacement project for the City of Winchester, Virginia. The scope of work includes the construction of a new pump station featuring a precast concrete building, controls, and a standby generator, as well as site electrical work, yard piping, security fencing, grading, and paving. Additional requirements involve the demolition of existing facilities and the relocation of a fuel tank. Subcontracting opportunities are specifically available for paving, material supply, site development, fencing, MEP, roofing, and carpentry. The project must be completed within 610 calendar days following the Notice to Proceed, with liquidated damages of 1,000 dollars per day for delays. Bids are due by 2:00 pm on November 12, 2026, via the City's e-Procurement Portal. The contract will be awarded to the lowest responsive and responsible bidder. Key compliance requirements include adherence to Davis-Bacon wage determinations, OSHA safety standards, ADA requirements for sidewalks and ramps, and the use of VDOT 2020 Road and Bridge Specifications. Successful bidders must provide performance and payment bonds equal to 100 percent of the contract amount. Interested parties should contact Trish Mousavizadegan at [email hidden] or [phone hidden] for plans and specifications.
WG Construction Co., Inc.

POSTED

about 5 hours ago

DEADLINE

in 2 days
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS