OIivehurst Public Utility District South County Service Area Improvements Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Olivehurst Public Utility District South County Service Area Improvements Project, identified as project number 8753-110, is a comprehensive wastewater infrastructure initiative funded by the State Water Resources Control Board. The project aims to expand and upgrade the wastewater collection system to utilize unused capacity at the Olivehurst Public Utility District Wastewater Treatment Plant, enabling the processing of untreated wastewater from the City of Wheatland. The scope is divided into three primary components: the implementation of sanitary sewer overflow reduction measures in Olivehurst, including retrofits to pump station PS-1, a new pump station PS-2, and an eight-inch force main on McGowan Parkway; the modification of the wastewater treatment plant to handle increased wet weather flows and the replacement of obsolete equipment; and the construction of a new treatment system to connect the City of Wheatland to the existing collection network. The project is located in Yuba County, California, with specific work occurring at the 38-acre treatment plant site and across various pipelines, including installations below Reeds, Hutchinson, and Kimball Creeks. Environmental compliance is a critical requirement, as the project is subject to the California Environmental Quality Act and requires adherence to a Mitigated Negative Declaration. Additionally, work involving creek crossings must comply with Section 1602 of the Fish and Game Code under Streambed Alteration Agreement EPIMS Notification No. YUB-63747-R2. The Olivehurst Public Utility District serves as the lead agency, with the City of Wheatland carrying out the project. Key administrative contacts include General Manager John Tillotson for the utility district and City Manager Bill Zenoni for the City of Wheatland.

General Info

Wastewater infrastructure project expanding collection systems and treatment capacity for Olivehurst and Wheatland.

Agency

California → Olivehurst Public Utilities District

NAICS

237110 - Water and Sewer Line and Related Structures ConstructionView NAICS

Place of Performance

CA

Set-Aside

NONE

Documents

(3)

Notice of Determination for OPUD South County Service Area Improvements Project

PDFnotice-of-determination

YUB-63747-R2 Notice of Determination for OPUD Pump Stations and Pipelines

PDFnotice-of-determination

Notice of Determination for South Yuba County Water and Wastewater Infrastructure Improvement Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Notice updated

The notice description changed. The point of contact changed.

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Olivehurst Public Utilities District
Contacts3 people available
OfficeN/A
Organization / Agency
California → Olivehurst Public Utilities District
Office AddressN/A
Contacts
Cedric IrvingEnvironmental Scientist
John TillotsonGeneral Manager
Dane SchillingCity Engineer

Full Description

Show more
The State Water Resources Control Board (State Water Board) is funding the Project, and City of Wheatland project (SCH #2021110022), under one agreement referred to internally as “Regional Wastewater Transmission and Treatment Facilities Project.” The Project involves expanding and upgrading the wastewater collection system to handle wastewater from the City of Wheatland, utilizing unused capacity at OPUD Wastewater Treatment Plant (WWTP). It includes measures to reduce sanitary sewer overflows (SSO) in historic Olivehurst, along with upgrades to the WWTP. The OPUD Project initially included five components to its objectives; however, Components 3 and 4 have since been removed from the Project. The remaining Project components consist of the following: · Component 1: Completion of SSO reduction measures to the existing wastewater collection system serving the existing community of Olivehurst, including retrofits to an existing pump station (PS-1) on the Olivehurst Avenue/11th Avenue intersection; an existing wastewater collection pipeline on Olivehurst Avenue; a new pump station (PS-2) near the intersection of McGowan Parkway and Dan Avenue, and an eight-inch force main on McGowan Parkway to an existing pipeline serving the OPUD WWTP. · Component 2: Modification of the existing OPUD WWTP to accommodate increased wet weather flows and replacing of equipment that has reached the end of its operational life, located within the existing 38-acre WWTP site which houses the WWTP, a corporation yard for the OPUD water utility, and a five-acre solar array. · Component 5: Construction and operation of new wastewater treatment system to connect the City of Wheatland with the existing OPUD Olivehurst collection system, allowing the OPUD WWTP to process Wheatland's untreated wastewater. PROJECT NUMBER: 8753-110

Similar Contracts

Same NAICS industry code

NAICS: 237110
New
Federal
Z2NZ-- 658-23-108 Correct Stormwater Drainage
Solicitation # 36C24626B0031
Solicitation 36C24626B0031 is an Invitation for Bids (IFB) issued by the Department of Veterans Affairs Network Contracting Office 6 for Project 658-23-108, which involves correcting stormwater drainage at the Salem VA Medical Center in Salem, Virginia. The project is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses (SDVOSB), with an estimated construction magnitude between $10,000,000 and $20,000,000. The scope of work includes providing all labor, materials, and equipment for general construction and utility work, specifically the installation of a dewatering system to control ground surface water during excavation. The performance period is 450 calendar days from the issuance of the Notice to Proceed. The contract will be awarded based on FAR Part 14 Sealed Bidding procedures, typically to the lowest responsive and responsible bidder. Eligible SDVOSB bidders must be registered in the System for Award Management (SAM) and are required to perform at least 25% of the construction work. Key requirements include a bid guarantee of at least 20% of the bid price (capped at $3,000,000), adherence to Davis-Bacon wage determinations, and the ability to demonstrate the completion of three similar projects within the last three years. The final bid submission deadline was extended to October 20, 2026, with a public bid opening on October 21, 2026.
246-NETWORK Contracting Office 6 (36C246)

POSTED

about 4 hours ago

DEADLINE

in 28 days
View Details
NAICS: 237110
New
Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1
Solicitation # inland-feedersbvmwd-foothill-ps-intertie-stage-1
The Inland Feeder/SBVMWD Foothill PS Intertie, Stage 1 project in Highland, California, involves extensive infrastructure installation for the Metropolitan Water District of Southern California. The scope of work includes furnishing and installing approximately 2,150 linear feet of 54-inch to 66-inch diameter steel pipe and 200 linear feet of 144-inch diameter steel pipe. The project also requires the installation of various large-diameter valves, including contractor-furnished valves and Metropolitan-furnished 54-inch and 132-inch valves, along with 54-inch and 145.5-inch diameter tie-ins and associated fittings. Additional construction requirements include the installation of four surge tanks, two valve vaults, an air compressor yard structure, and various drainage improvements. The project encompasses electrical upgrades, instrumentation and controls, piping systems, the excavation of cobbles and large boulders, welding, disinfection, and surface restoration. This solicitation, issued by James W. Fowler Co., is open to small businesses, including SDVOSB, MBE, and WBE certified firms, with a response deadline of September 29, 2026. The prime contractor encourages M/W/DBE participation and the use of apprentices, offering assistance with bonding, insurance, and materials to qualified subcontractors.
James W. Fowler Co.

POSTED

about 12 hours ago

DEADLINE

in 6 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS