Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from New Hampshire was posted on April 5, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Old Pine Tree Cemetery Road Paving Project

Closed
2024-RFx-012State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The City of Lebanon's Public Works Department is inviting bids for a project to reclaim and pave approximately 9,040 feet of Old Pine Tree Cemetery Road. The scope includes reclaiming existing base materials to a depth of 12 inches across specified sections, with additional fine crushed stone added and mixed into certain segments to enhance stability. The main paving work involves applying 2.5 inches of base bituminous concrete asphalt followed by 1.5 inches of wearing course asphalt, covering the designated areas shown on the project plans. An additive alternate offers an extended reclamation and paving scope for additional sections at the start and end of the road, with similar asphalt thickness specifications. The project also encompasses various ancillary tasks such as adjusting water gate valve boxes, catch basin grates, and manhole covers, as well as installing pavement markings, traffic control measures, and restoring disturbed areas with loam, seed, and mulch. Erosion and sediment control measures, along with general cleanup and miscellaneous work, are included to ensure proper project completion. The solicitation, titled "Old Pine Tree Cemetery Road Paving Project," was posted on April 5, 2024, with a response deadline of April 24, 2024. The project is classified under NAICS code 212312 and is managed by the New Hampshire Public Works - Admin. Interested bidders can contact Melanie McDonough via email or phone for further information. The project aims to improve the roadway's durability and safety through comprehensive reclamation and paving efforts, with provisions for necessary adjustments and environmental protections throughout the construction process.

General Info

Agency

New Hampshire → Public Works - Admin

Place of Performance

NH, USA

Set-Aside

NONE

Documents

1

2024-RFx-012 Old Pine Tree Cemetery Road Paving Project IFB

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNew Hampshire → Public Works - Admin
Contacts1 person available
OfficeN/A
Organization / Agency
New Hampshire → Public Works - Admin
Office AddressN/A
Contacts

Full Description

Show more
The City of Lebanon Public Works Department is seeking bids for reclamation and paving work on 9,040' of Old Pine Tree Cemetery Road.The base bid for the project consists of reclaiming the base materials to a depth of 12” from Sta 31+50 to Sta 72+40, adding and mixing into the reclaimed base 9” of fine crushed stone from Sta 31+50 to Sta 39+00 and Sta 56+50 to Sta 72+40, and paving from Sta 31+50 to Sta 72+40 with 2.5” of base bituminous concrete asphalt pavement and 1.5” of wearing bituminous concrete asphalt pavement to the limits of work shown on the plans.The Additive Alternate for the project consists of reclaiming the base materials to a depth of 12” from Sta 0+00 to Sta 31+50 and Sta 72+40 to Sta 90+40 and paving these two sections with 2.5” of base bituminous concrete asphalt pavement and 1.5” of wearing bituminous concrete asphalt pavement to the limits of work shown on the plans.The project also includes adjusting water gate valve boxes, adjusting catch basin grates and manhole covers, pavement markings, traffic control, loam, seed, and mulch of disturbed slopes, erosion and sediment control, and miscellaneous work and cleanup. 

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS