Old Santa Cruz Highway Culvert Repair

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Project, located approximately 0.2 miles east of Highway 17 and south of Lexington Reservoir in Los Gatos, California, addresses critical infrastructure failure caused by a landslide during the 2022/2023 winter storms, which compromised an exposed culvert outlet downstream of the highway and triggered severe bank erosion along Arroyo Mocho Creek. This ephemeral creek, a headwater tributary feeding into Lexington Reservoir and ultimately the Guadalupe River watershed, requires immediate stabilization to restore proper drainage and protect public safety. The remedy involves extending the culvert outfall down the steep hillside to a less gradient slope and reinforcing it with rock riprap to dissipate energy and prevent scour. The extended culvert will reroute and dewater the section of the creek between the original outfall and the new downstream point, mitigating further erosion and ensuring flow continuity toward the reservoir. To restore the highway’s structural integrity, the project includes the construction of a soil nail and micro pile-supported shotcrete wall to reclaim the roadway width and provide a four-foot shoulder necessary for guardrail installation. Controlled Low Strength Material will be used as backfill between the stabilized slide face and the wall to ensure structural support, while the toe of the wall will be reinforced against undermining by stabilizing shallow landslide materials. Additional measures such as a pinned mesh apron and horizontal drains will manage subsurface seepage below the wall. The culvert outfall and its downstream flow path will require enhanced scour protection through targeted armoring to safeguard against future erosion from storm events. The project is being coordinated under the jurisdiction of the Regional Water Quality Control Board, Region 2 – San Francisco Bay, with oversight focused on protecting water quality and watershed health throughout the Guadalupe River system.

General Info

Extend culvert, stabilize slope with riprap and shotcrete wall, restore drainage, protect reservoir watershed.

Agency

California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Los Gatos, CA

Set-Aside

NONE

Documents

(0)

No documents available

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Contacts1 person available
OfficeN/A
Organization / Agency
California → Regional Water Quality Control Board, Region 2 - San Francisco Bay, Oakland
Office AddressN/A
Contacts
Nathaniel GoetzWater Resource Control Engineer

Full Description

Show more
The Project is located about 0.2 miles east of Highway 17 and south of Lexington Reservoir in Los Gatos, Santa Clara County (Lat. 37.170359; Long. -121.986208). The Project is along a steep hillside and crosses Arroyo Mocho Creek (Creek), which is an ephemeral creek and a headwater tributary of Lexington Reservoir (Reservoir) along Los Gatos Creek that originates upstream from the Project area in the Santa Cruz Mountains. The Creek is in the Guadalupe River watershed and eventually flows into San Francisco Bay. The Project purpose is to repair an exposed culvert outlet downstream of the Highway that failed in a landslide and triggered bank erosion due to heavy and long-duration storm events during the 2022/2023 Winter season. The Project will stabilize the active roadway crossing at the Creek to protect public safety and restore drainage flows between the Project reach and the Reservoir. The culvert outfall will be extended down the hillside to a less steep gradient and armored with rock riprap for energy dissipation. The extended culvert will dewater the portion of the Creek between the original culvert outlet and the new downstream outlet. The Project will involve landslide and roadway repair that consists of installation of a soil nail and micro pile-supported shotcrete wall to restore the road width and a four-foot shoulder, which will be necessary for a guardrail above the wall. Controlled Low Strength Material (CLSM) backfill will be poured between the slide face, temporary plug and the back of the shotcrete wall. The shallow landslide material below the toe of wall will be stabilized to protect the bottom of the wall from undermining. A pinned mesh apron and horizontal drains will likely be needed to capture the seepage below the wall. The culvert outfall and downstream flow will require additional armoring for scour protection.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
27-008 FY26 LMIG Resurfacing Project
Solicitation # 27-008
The City of Sandy Springs is seeking sealed bids for the milling and resurfacing of approximately 22.35 miles of city roadways, requiring a minimum milling depth of one and one-half inches, targeted patching using either 12.5 mm or 19 mm materials as needed, and final paving with 12.5 mm asphalt at a rate of 165 pounds per square yard, or as otherwise directed by the City’s Engineer or authorized representative. The specific roadway segments to be worked are detailed in the Contract Documents, and the City retains the authority to modify the scope by adding or removing segments during the contract term, with corresponding adjustments to traffic control and mobilization costs to reflect those changes. All work must meet the technical specifications outlined, and bid evaluations will prioritize responsiveness and responsibility, with award going solely to the lowest compliant bidder who satisfies all minimum requirements. The solicitation, titled 27-008 FY26 LMIG Resurfacing Project and identified by number PE-66098-NONST-2027-000000144, was posted on August 7, 2026, with responses due by September 9, 2026. The project falls under the jurisdiction of the City of Sandy Springs in Georgia, and all work must be performed within the city limits. Interested bidders must submit sealed proposals by the deadline, and inquiries should be directed to Daniel Ramos, the primary point of contact, via email at DRamos@SandySpringsGA.gov or by phone at 770-206-1477. The contract is open to all qualified respondents without set-aside designations, and detailed specifications are available through the official procurement portal linked in the solicitation.
City of Sandy Springs

POSTED

about 17 hours ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
New
International
Town of Hinton - Request for Proposal - Town of Hinton - Tamarack Drive Rehabilitation (2026)
Solicitation # AB-2026-05583
The Town of Hinton is soliciting proposals for the comprehensive rehabilitation of Tamarack Drive scheduled for 2026, under solicitation number AB-2026-05583. The project encompasses a full range of infrastructure improvements including grading, installation of granular base course, curb and gutter construction, and application of asphalt concrete pavement to restore the roadway to modern standards. Additional scope elements include the installation of traffic cameras for enhanced monitoring and safety, as well as new pedestrian crossings to improve accessibility and compliance with current transportation guidelines. All work is to be performed within the municipal boundaries of Hinton, Alberta, with the expectation that contractors will adhere to local regulations and engineering specifications. Proposals must be submitted by September 1, 2026, at 8:00 PM Mountain Time, following the release of the request for proposal on August 7, 2026. The primary point of contact for inquiries is Michael Steffler, Project Manager, who can be reached via email at michael.steffler@wsp.com or by phone at 780-728-7398. The procurement is managed directly by the Town of Hinton with no set-aside provisions specified, and all interested parties are directed to the official Alberta purchasing portal for detailed documentation and submission requirements. The project reflects a strategic investment in community infrastructure aimed at improving transportation efficiency, public safety, and long-term durability of the road network.
Town of Hinton

POSTED

about 18 hours ago

DEADLINE

in 24 days
View Details