Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 2 at 2:00 PM EDT

Register Free →

Old Wards Ferry Replacement Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

Tuolumne County, in cooperation with Caltrans, intends to replace the Old Wards Ferry Bridge crossing Curtis Creek in Sonora, California. The project involves constructing a new 61-foot long and 26-foot wide single-span bridge featuring a cast-in-place, prestressed concrete slab superstructure. To minimize approach roadway work, the new structure will follow the existing horizontal alignment with a slightly lowered profile grade. The bridge will be supported by seat type abutments founded on cast-in-drilled-hole concrete piles. Because the structure spans Curtis Creek, the design ensures that no new footings will be placed directly in the creek. This forecast project is managed by Tuolumne County with Denise Zitnik serving as the primary point of contact.

General Info

Tuolumne County and Caltrans will replace the Old Wards Ferry Bridge in Sonora.

Agency

California → Tuolumne County

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

Tinnin Road and Old Wards Ferry Road, Sonora, CA, 95370

Set-Aside

NONE

Documents

(1)

55-08212026-028 (TC Old Wards Ferry Replacement Project)

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Tuolumne County
Contacts1 person available
OfficeN/A
Organization / Agency
California → Tuolumne County
Office AddressN/A
Contacts
Denise ZitnikEngineer III

Full Description

Show more
Tuolumne County in cooperation with Caltrans, proposes to replace the existing Old Wards Ferry Bridge crossing Curtis Creek (Bridge No. 32C0017). The replacement bridge will be constructed on the existing horizontal alignment with a slightly lowered profile grade to minimize the approach roadway work. The new bridge will consist of a 61-foot long, 26-foot wide, single-span, cast-in-place, prestressed concrete slab superstructure supported on seat type abutments founded on cast-in-drilled-hole concrete piles. The new bridge will span Curtis Creek, so no new footings will be placed in the creek.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified subcontractors, material contractors, and suppliers for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering site preparation, utilities, asbestos abatement, tunneling, boring, asphalt and concrete paving, electrical work, and the installation of underground piping and telecommunications. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code, requiring firms performing onsite work to be signatory to collective bargaining agreements with various trades to ensure labor harmony. Eligible bidders must possess a valid California Contractor's license and provide acceptable insurance. SBE and VSBE firms must provide certification from the Department of General Services and the Port of Long Beach via the PlanetBids portal. Subcontractors may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The project is partially funded by several grants, including FHWA, LACMTA, the State of California Transportation Agency, and U.S. DOT MARAD, necessitating compliance with DBE Program requirements. Interested firms must contact the Lead Estimator to receive an Invitation to Bid through the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 6 hours ago

DEADLINE

in 13 days
View Details