Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 29, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

On-Call Pavement Striping Services

Closed
On-Call Pavement Striping ServicesState & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
SLED
El Rancho Drive, La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135)
Solicitation # 40579
The El Rancho Drive and La Madrona Drive Guardrail Project, Federal Project No. HSIPL-5936(135), is a public infrastructure safety initiative managed by the County of Santa Cruz Department of Public Works. The project involves the installation of the Midwest Guardrail System and associated infrastructure repairs across 16 total locations, specifically 6 locations along El Rancho Drive and 10 locations along La Madrona Drive. The scope of work includes the removal of existing guardrails and AC dikes, cold planing AC pavement to a depth of 2 inches, constructing new AC dikes, and building earth retaining structures. The estimated cost of the project is 812,997 USD, with a required completion timeframe of 70 working days. The project is subject to strict federal and state regulations, including Buy America requirements for iron, steel, and manufactured products, and adherence to the Davis-Bacon and Related Act. It is a prevailing wage project governed by the Department of Industrial Relations. Contractors must provide a bid bond or security, as well as faithful performance and payment bonds upon award. Compliance requires rigorous documentation, including mill tags for steel products, certificates of compliance, and a clear chain of custody record verified by the Engineer. Proposals must be submitted electronically via the OpenGov portal and include mandatory certifications regarding debarment, non-collusion, and equal employment opportunity.
Public Works

POSTED

about 10 hours ago

DEADLINE

in 23 days

AI Contract Overview

Show more

The contract involves providing pavement striping services throughout the City of Vallejo, adhering to the standards set by the California Department of Transportation and the California Manual on Uniform Traffic Control Devices. The scope includes installing safety and traffic control measures, such as signs, cones, barriers, and flaggers, with all plans requiring prior approval. Site inspections are necessary to identify and mark surface defects before work begins. Preparation of roadway surfaces involves cleaning to remove dirt and debris, ensuring proper conditions for striping, with weather conditions monitored to meet material specifications. Measurements for striping are taken during pre-job walks and documented by both City inspectors and the contractor, ensuring accuracy and compliance. The contractor is responsible for maintaining a neat and passable work site, repairing any damages caused by their operations, and parking vehicles in accordance with local laws. Daily cleanup of materials and debris is required to keep the work area tidy. The contract is set to be posted on March 29, 2024, with responses due by May 2, 2024, and is managed by the City of Vallejo, California, with a designated point of contact for inquiries.

General Info

Documents

0

No documents available

No documents were posted with this contract.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

This one is closed. Find the next one like it.

Open contracts like this one, right now:

  • Opportunity to quote asphalt repairs_Laura Street Sewer Improvements ProjectOpen now, due in 10 days
  • Terrace Drive Sewer System Improvements, Chimney RockOpen now, due in 14 days
See open contracts like this

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of Vallejo
Contacts1 person available
OfficeN/A

Full Description

Show more
Services to be Provided. The work to be done consists of pavement striping services throughout the City of Vallejo. All Striping shall conform to the current standards of the California Department of Transportation Standard Plans and the California Manual on Uniform Traffic Control Devices. Work shall include the following:• Install Work Site Safety and Traffic Control Measures: Before starting any work, traffic control plans shall be submitted and approved for each requested job. The contractor is responsible for providing all safety measures, including signs, cones, barriers and flaggers in the area of operation to ensure the safety of work personnel and the public.• Site Inspection: Inspect areas where repairs are to be performed to ensure all surface bumps or defects are marked with washable paint to delimit the areas to be repaired.• Preparation: The roadway surfaces to be striped or marked are to be broomed, swept, or blown to remove dirt, loose stones, or other foreign material prior to any painting operations. Additionally, temperatures and weather shall be taken into account and confirmed within specification for the materials being applied. • Striping Measurement: Measurements shall be taken and agreed upon, in writing, by the field inspectors of City and Contractor during pre-job walks. Contractor will maintain records documenting such measurements.• Application of Striping: The application of striping shall be agreed upon by the field inspectors of City and Contractor during pre-job walks and comply with City of Vallejo Pavement Painting, Striping, and Marking Standard Specifications. Contractor will maintain records documenting such measurements.• Work Site: Contractor shall keep neat, tidy, and passable conditions of the work area during construction and abide by all regulations of the City of Vallejo. It shall be the responsibility of the contractor to repair any damage that is caused by its operation or negligence. Contractor and employees shall park vehicles and equipment in accordance with laws and ordinances of the City of Vallejo so as not to impede the free flow of traffic.• Clean Up: All material or garbage shall be picked up by the operation crew and removed from the area at the end of each workday and the conclusion of the project.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS