Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on July 28, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

ONLY USPFO FOR KANSAS MATOC Contract Holders can submit a proposal on this RFP W912JC-16-R-0002 Project# 200112, CP Range Salina Kansas

Closed
SMATOCW912JC-16-R-0002Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements
Solicitation # construction-recharge-master-plan-update-basin-improvements-project-montclair-basin-improvements-2
The Construction of the Recharge Master Plan Update Basin Improvements Project Montclair Basin Improvements is a solicitation issued by RT Contractor Corp for the Inland Empire Utilities Agency. This project, located in California with a specific performance area in Riverside or Los Angeles, focuses on basin improvements under NAICS code 236220. The solicitation was posted on October 19, 2026, with a response deadline of November 4, 2026. This opportunity is specifically set aside for Disadvantaged Business Enterprises (DBE) as defined by the Department of Transportation. To secure project financing, the Inland Empire Utilities Agency requires strict adherence to expanded DBE Good Faith Effort (GFE) guidelines. Bidders must provide proof of utilizing SBA and MBDA services and demonstrate that solicitations were posted in an online publication for 30 consecutive days and in a newspaper for at least one day prior to the bid opening. Failure to include this documentation within the bid package will result in the proposal being deemed non-responsive. While outreach documentation may be submitted up to three business days after the closing date, all other mandatory GFE requirements must be met by the opening date to ensure compliance.
RT CONTRACTOR CORP

POSTED

about 2 hours ago

DEADLINE

in 15 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the development of a 12,920 square foot multi-story steel frame laboratory and office facility, as well as an optional 17,978 square foot laboratory facility. Construction features include shallow foundations, metal standing seam roofs, and exterior walls composed of masonry and metal panels. The scope of work encompasses comprehensive site preparations, including landscaping, parking, exterior lighting, and the installation of underground stormwater retention and utility systems. Additionally, the project requires the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide array of trades, including demolition, abatement, concrete, masonry, structural and miscellaneous metals, millwork, roofing, drywall, flooring, painting, elevator installation, fire protection, plumbing, mechanical, electrical, sitework, and crane services. This is a small business set-aside solicitation subject to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact the primary point of contact to receive bid invitations and documents via Building Connected. The response deadline for this solicitation is November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in about 1 month
NAICS: 236220
New
CITY OF GREENFIELD WASTEWATER TREATMENT PLANT UPGRADE PROJECT
Solicitation # city-greenfield-wastewater-treatment-plant-upgrade-project
The City of Greenfield Wastewater Treatment Plant Upgrade Project involves the construction of a new 2.0 million gallons per day facility located on the northeast end of Walnut Avenue in Greenfield, California. The project scope is divided into four distinct phases: site preparation involving soil stabilization and utility relocation; construction of the plant including a packaged Membrane Bioreactor treatment plant, headworks, UV disinfection, and SCADA systems; decommissioning and demolition of existing facilities; and the completion of finish facilities including the Walnut Avenue extension. The total duration for the project is 915 calendar days, with a critical requirement to maintain existing plant services and regulatory compliance throughout the first two phases. Managed by C. Overaa & Co., the solicitation is open to various small and disadvantaged business enterprises, including DBE, SDVOSB, and WOSB. A significant local hiring goal requires that 50 percent of the total construction workforce be residents of Monterey, San Benito, or Santa Cruz counties. Subcontractors must utilize the Textura electronic system for invoicing and payments and are required to accept the standard Overaa agreement without modification. Key milestones include a mandatory pre-bid meeting on October 5, 2026, with bid submission deadlines listed as either October 28 or November 10, 2026.
C. Overaa & Co.

POSTED

about 2 hours ago

DEADLINE

in 21 days
NAICS: 236220
New
P1102 Weapons Magazine and Ordnance Operations Facility, Naval Submarine Base New London, Groton, Connecticut
Solicitation # p1102-weapons-magazine-ordnance-operations-facility-naval-submarine-base-new-london-groton
This solicitation issued by J & J Contractors, Inc. seeks pricing for the P1102 Weapons Magazine and Ordnance Operations Facility project at the Naval Submarine Base New London in Groton, Connecticut. The project has a duration of 1828 calendar days and involves the construction of six Containerized Long Weapons Storage units, two Box G magazines, and one Box H earth-covered high-explosive magazine. The scope includes comprehensive site work such as clearing, rock excavation, grading, and wetland mitigation, as well as the construction of an Ordnance Operations building, a Truck Inspection area, and a Sentry building. Demolition of 18 existing magazines and buildings 524 and 393 is also required. Technical requirements encompass a wide range of trades including demolition, abatement, concrete, structural steel, roofing, electrical, plumbing, and mechanical systems. Specialized construction features include rigid inclusions, load transfer mats, grounding and lightning protection, and intrusion detection systems. The project also involves installing primary and secondary electrical distribution, telecommunications infrastructure, access roads, and landscaping. This opportunity is set aside for various small business categories, and interested parties must contact the primary point of contact by the October 31, 2026, deadline to receive bid documents.
J & J Contractors, Inc

POSTED

about 2 hours ago

DEADLINE

in 11 days

General Info

NAICS

236220 - Commercial and Institutional Building Construction

Place of Performance

HQ Range Control, SALINA, KS, 67456, USA

Set-Aside

SBA

Documents

4

cp_range_best_locks_justification.pdf

PDF

MATOC_TO_OFFERING_FORM_Jun_2016_cp_range.docx

DOCX

prebid_attendees.xlsx

XLSX

range_wd.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

3 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

Response deadline changed from Jul 26, 2016 to Aug 2, 2016. The notice description changed.

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → W7M9 Uspfo Activity Ks Arng
Contacts2 people available
OfficeTOPEKA, KS, 66611-1169, USA
Office AddressTOPEKA, KS, 66611-1169, USA
Contacts
Karen L. RobbenContracting Officer
Linda M. EhrhartContracting Officer

Full Description

Show more
Amendment 2 is issued to clarify the due date for proposals and to provide answers to additional questions that have been received: Proposals are due on Tuesday, August 2, 2016 at 2:00 pm CDT. Question 1. Please confirm if the following bid schedule structure is correct. Item # 1 CP/MPQC Range is the base bid. Items # 2 -7 are all option bid items. Answer: Item 1 will be awarded and depending on prices offered - 1 or more or possible all of the remaining bid items will be awarded. Question 2. Will additional days be added to the 120 calendar day performance period if any of the bid items # 2=7 are awarded. Answer: 120 days will be the completion date regardless of the number of items awarded. Additional days will not be added. Question 3. What is the finish for the light gauge girts? S301 Control Tower? Answer: Girts shall be prime painted. Question 4. What is the finish for the ' rod bracing? S501 Control Tower? Answer: Rod bracing shall be galvanized. Question 5. Is this project tax exempt? Answer: Yes this project will be tax exempt. Question 6. Sheet ES-101 shows a 2" PVC conduit with a 6 strand SM Fiber optic direct burial grade backbone telephone cable to existing telephone pedestal. Sheet ES-102 shows a 2" PVC conduit with a 4 pair cat 5E UTP Direct burial grade backbone telephone cable to existing pedestal as well. Are these both required? If so are these separate conduits? Answer: The telephone connection shall be 4 pair CAT5E UTP. Question 7. Sheet E-508 CP tower Electrical service rack detail shows Panel PP2 located on the outdoor rack, Sheet E-101 shows Panel PP2 mounted on the 2nd floor of the tower, what location is required for this panel. Answer: Mount panel PP2 on the electrical rack below the tower. Question 8. Sheet ES-102 ROCA Electrical Site Plan shows mast style lightning protection poles (8) in several locations around the different buildings, are these to be included in the Line Item #1 on the bid form? Or at the corresponding building breakouts? Answer: a corrected drawing was previously posted. Question 9. On Sheet ES-102 general note #2 shows conduits for red light control circuits, are these to be included in the Item #1 breakout as well? Answer: a corrected drawing was previously posted. Question 10. Sheet E-504 has Fence grounding details and references a sheet C-526 for fence details, as well as notes to civil plans. I do not find a sheet C-526 or any indication of fencing on the civil drawings, will there be any fencing and if so, where is the fencing shown on the drawings? Answer: The fencing around the control tower has been eliminated.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS