Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from National Aeronautics And Space Administration was posted on June 24, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Onsite Installation & Commissioning of MTS FlexTest 40 Controller

Closed
Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The contract requires the physical installation, commissioning, and integration of an MTS FlexTest 40 controller with an existing SATEC 600-kip load frame located at NASA Langley Research Center in Hampton, Virginia. The scope of work involves onsite activities to ensure full operational compatibility between the new controller and the legacy load frame, including technical configuration, calibration, testing, and validation to meet NASA’s precision testing standards. All work must be performed by qualified personnel with demonstrated expertise in electromechanical test systems and industrial automation interfaces. The contract is classified as a subcontract with a NAICS code of 272110, indicating it falls under engineering services related to physical systems integration. The solicitation was posted on June 24, 2026, with a response deadline of June 26, 2026, at 12:00 PM, indicating a rapid turnaround required for proposers. The place of performance is definitively set at the NASA Langley Research Center facility with a zip code of 23681, and the contracting activity is managed by the NASA Shared Services Center under the National Aeronautics and Space Administration. While no set-aside provisions or point of contact details are provided, the urgency and technical specificity suggest that only vendors with prior experience in high-precision testing equipment at government aerospace facilities are likely to qualify.

General Info

Install and integrate MTS FlexTest 40 with SATEC 600-kip load frame at NASA Langley by June 26, 2026.

Agency

National Aeronautics And Space Administration → NASA Shared Services CenterView Agency

NAICS

272110

Place of Performance

Hampton, VA, 23681, USA

Set-Aside

NONE

Documents

This scope was carved out of 80NSSC26936775Q.

The full solicitation package (3 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

FY26 MTS Purchase

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNational Aeronautics And Space Administration → NASA Shared Services Center
ContactsNo contacts available
OfficeN/A
Organization / Agency
National Aeronautics And Space Administration → NASA Shared Services Center
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Physical installation, commissioning, and integration of the MTS FlexTest 40 controller with the existing SATEC 600-kip load frame at NASA Langley Research Center.

More opportunities from National Aeronautics And Space Administration → NASA Shared Services Center

Same awarding agency

NAICS: 333998
New
Federal
Lower Wing / Elevon Heater Carriages
Solicitation # 80NSSC26937774Q-1
NASA Shared Services Center is soliciting quotes under solicitation 80NSSC26937774Q for the fabrication and delivery of Lower Wing and Elevon Heater Carriage test hardware for the NASA Armstrong Flight Research Center. This firm-fixed-price contract is set aside for small businesses under NAICS code 333998. The scope involves the production of various components, including heater frames, adapter plates, bearing brackets, and axis rods, all of which must be fabricated according to government-furnished design drawings. The target delivery schedule is within 12 weeks of contract award, with a preference for earlier completion. Deliveries are FOB Destination to Edwards, California, and the contractor is required to provide status updates every three weeks. Award will be based on the best value, evaluating price, fabrication duration, technical acceptability, and past performance, with a requirement for three references from the last three years. The contractor must provide a manufacturing process plan and perform dimensional tolerance inspections. Due to the nature of the hardware, strict compliance with U.S. export control laws, including ITAR and EAR, is mandatory. Additionally, the contractor must be registered in the System for Award Management and provide a Cage Code or Unique Entity ID. All contractual inquiries are directed to Tracy Bremer.
All Other Miscellaneous General Purpose Machinery Manufacturing

POSTED

2 days ago

DEADLINE

in 5 days
View Details
NAICS: 811210
New
Federal
2026 Service contract for D8 Discover DaVinci
Solicitation # 80NSSC26942313Q
The NASA Shared Services Center is seeking a service contract for the maintenance of the D8 Discover DaVinci XRD instrument located at the NASA Glenn Research Center. The requirement covers the period of performance from September 10, 2026, to September 9, 2027. Under the authority of FAR 12.102(a), NASA intends to issue a sole source contract to Bruker AXS LLC, as they have been determined to be the sole provider capable of performing these services. The procurement falls under NAICS code 811210 and follows the procedures prescribed in FAR Part 12 for commercial items and services. The scope of work includes both emergency and scheduled maintenance to preserve the original equipment performance of the instrument. All services must be performed by factory-trained service engineers and conducted according to manufacturer instructions, including the verification of radiation safety. The contract provides for unlimited emergency service visits and technical phone support during regular business hours, with a required emergency response time of 48 hours for breakdowns that render the instrument inoperable. While this notice allows interested organizations to submit capabilities and qualifications by September 15, 2026, to determine if the procurement should be competitive, the government explicitly states that price quotes submitted in response to this notice will not be reviewed or accepted.
Electronic and Precision Equipment Repair and Maintenance

POSTED

2 days ago

DEADLINE

in 4 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS