OPEN Effingham County Regional Water Supply Facilities 1.5 MG Elevated Water Tank
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Effingham County Board of Commissioners is soliciting proposals for the construction of a new 1.5-million-gallon concrete composite elevated water tank as part of the Regional Water Supply Facilities project in Georgia. The scope of work includes all labor, materials, and equipment necessary for a fully operational facility, encompassing the tank foundation, erection, site clearing, grading, and restoration. Key infrastructure components include 12-inch PVC water mains, flanged piping, control valves, connection to an existing 16-inch water main, fire hydrant assemblies, gate valves, steel casing, and chain-link fencing. The project requires a comprehensive electrical, instrumentation, and SCADA system, including all wiring, panels, grounding, and pressure instrumentation. Compliance and quality requirements include disinfection and bacteriological testing of the water system, stormwater and NPDES monitoring and reporting, and the installation of obstruction lighting if required for FAA compliance. The solicitation, numbered PE-65100-NONST-2027-000000057, was posted on November 4, 2026, with a response deadline of December 10, 2026. The contractor is responsible for all regulatory and closeout requirements necessary to place the facility into service.
General Info
Place of Performance
GA, USASet-Aside
Timeline
Response Deadline
Organization & Contact Information
Full Description
Major construction components include the elevated tank and foundation, site clearing and grading, gravel access areas, approximately 12-inch PVC water main, flanged piping and control valves, connection to the existing 16-inch water main, fire hydrant assemblies, gate valves, steel casing/jack-and-bore work, chain-link fencing and gates, rip-rap, miscellaneous concrete, erosion and sediment controls, and site restoration.
The project also includes a complete electrical, instrumentation, and SCADA system, including electrical service, panels, conduit, wiring, gauges, controls, grounding, lighting, pressure instrumentation, and associated testing and inspections. The electrical plans further identify SCADA equipment, tank lighting, grounding around the tank, service equipment, and provisions for obstruction lighting if required for FAA compliance. Additional work includes tank coating and painting, lettering and logo installation, disinfection and bacteriological testing of the water system, stormwater/NPDES monitoring and reporting, and completion of all regulatory and closeout requirements necessary to place the facility into service.
Similar Contracts
Same NAICS industry code
More opportunities from Georgia → Effingham County Board of Commissioners
Same awarding agency
Ready to Pursue This Opportunity?
Get AI-powered intelligence on this solicitation and the ones like it
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
