Open Road Tolling (ORT) Conversion Northern Bridges Project
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
The Bay Area Toll Authority, in coordination with Caltrans, is undertaking a major infrastructure upgrade to replace aging toll collection systems at the Antioch Bridge, Benicia-Martinez Bridge, and Carquinez Bridge toll plazas with modern Open Road Tolling (ORT) systems. This project aims to enhance operational efficiency and safety by eliminating physical toll booths and associated lane fanning, which currently create hazardous fixed objects within the travel way. Construction will involve removing existing booths and canopies, erecting new ORT gantries and toll equipment buildings, restriping mainline lanes to four general-purpose lanes plus one HOV lane on northbound I-680 and eastbound I-80, and reducing northbound SR-160 to a single lane through the plaza. Entrance and exit ramps to maintenance areas and parking lots will be modified, and all signage will be updated or relocated as needed. The ORT system will integrate FasTrak® Flex technology to provide toll discounts for high-occupancy vehicles. Work is confined mostly to state right-of-way, with a minor exception for widening on the Bridgehead Road maintenance ramp, which lies within the City of Oakley. Construction is scheduled to begin in 2026 and is expected to last approximately 20 months. The project qualifies for CEQA categorical exemptions under Class 1 and Class 2 due to its nature as a facility replacement with no significant environmental impact and complies with Caltrans Standard Specifications for noise, air quality, and erosion control. All inspection and acceptance will occur at the project sites in Contra Costa and Solano counties, with oversight conducted by BATA and Caltrans. No contract value, pricing details, or formal procurement evaluation criteria are disclosed in the available documentation, and while the project is listed as a forecast with a posted date of September 25, 2025, it has no solicitation number, contract type, or specified payment or invoicing mechanisms. The only point of contact provided is Angela Louie, Principal Program Coordinator at BATA.
General Info
Agency
NAICS
Place of Performance
CASet-Aside
Timeline
Organization & Contact Information
Full Description
Similar Contracts
Same NAICS industry code
