Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 5 at 2:00 PM EDT

Register Free →

Operation of Continuous Chlorination at Well 2 Water Supply Permit Amendment (Project)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Applicant seeks approval to implement a continuous chlorination system at the Well 2 water supply facility, replacing the existing chlorine dosing infrastructure to improve water disinfection efficiency and regulatory compliance. This permit amendment is managed by the State Water Resources Control Board under the jurisdiction of California, with the project scoped to enhance the operational reliability and safety of the potable water supply through automated, ongoing chlorination. The initiative is aimed at ensuring consistent water quality standards by eliminating the limitations of the prior system and maintaining disinfection throughout the distribution network. The primary point of contact for technical inquiries is Sudarshan Poudyal, District Engineer, reachable via phone or email, while John Bath serves as the administrative liaison for procedural or documentation-related matters. The project is publicly listed under the California CEQA Net portal with a posted date of August 4, 2026, signaling an upcoming opportunity for regulatory review or public input, though no formal solicitation has been issued as of now. The facility’s location is within California, and no specific city or zip details are provided, suggesting the permit applies broadly to the water system’s operational area under state oversight.

General Info

Applicant seeks approval to replace chlorination system at Well 2 for improved disinfection and regulatory compliance in California.

Agency

California → State Water Resources Control Board

NAICS

221310 - Water Supply and Irrigation SystemsView NAICS

Place of Performance

10881 S. Englehart Avenue, between E. Floral and E. Huntsman Avenues, CA

Set-Aside

NONE

Documents

(1)

NOE_CabotChlorination

PDF

AI Contract Breakdown

Uniform Contract Format

What is UCF?

Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → State Water Resources Control Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → State Water Resources Control Board
Office AddressN/A
Contacts
Sudarshan PoudyalDistrict Engineer
JOHN BATHAdministrative contact

Full Description

Show more
The Applicant proposes to operate a continuous chlorination system that replaced the old chlorine dosing system at the existing water facility.

Similar Contracts

Same NAICS industry code

NAICS: 221310
New
Palisade, MN Water Supply System Improvements
Solicitation # palisade-mn-water-supply-system-improvements
The City of Palisade is undertaking significant improvements to its water supply system, centered on the construction of a new water treatment facility and the rehabilitation or removal of the existing well house. The project also includes the rehabilitation of existing wells and their integration into the municipal water system, along with comprehensive restoration of all areas disturbed during construction. The scope of work is extensive, encompassing demolition, cast-in-place concrete, masonry, metal fabrication, carpentry, architectural woodwork, plastic paneling, thermal and moisture protection, plumbing, HVAC, electrical systems, structured cabling, earthwork, exterior improvements, utilities, and pollution control equipment. Bidders must be prepared to execute a wide range of construction disciplines to meet the technical demands of the project. Bids are due by August 18, 2026, at 12:00 p.m., submitted to estimating@ricelake.org, with the solicitation issued by Rice Lake Construction Group under the NAICS code 221310 for water supply systems. The contract encourages participation from Minority Business Enterprises certified by NMSDC and Woman Business Enterprises certified by WBENC, reflecting a commitment to diversity in contracting. The project is located in Palisade, Minnesota, and all inquiries should be directed to Karen Calabro, the primary point of contact, at 719-401-5621. The full solicitation is accessible through the SBA’s opportunity portal.
Rice Lake Construction Group

POSTED

about 2 hours ago

DEADLINE

in 13 days
View Details
NAICS: 221310
New
Federal
Z--IRRIGATION SYSTEM FOR NATL WEATHER SVC IN TEXAS
Solicitation # 1305M326Q0268
This contract solicits non-personal services for the complete removal and replacement of existing irrigation systems and associated landscape drainage repairs at three National Weather Service facilities in Texas—Corpus Christi, Midland, and New Braunfels. It is issued as a Request for Quotation under the Revolutionary FAR Overhaul Part 12, designated exclusively as a small business set-aside with a NAICS code of 221310 and a size standard of $41.0 million. The work must be performed within 120 days of contract award, with an estimated award date of August 17, 2026, and quotes are due by 10:00 a.m. MDT on August 7, 2026, submitted electronically to kerri.coffey@noaa.gov. Each location has a distinct CLIN, requiring full turnkey execution including supervision, labor, tools, materials, and equipment to install modern weather-based irrigation systems, restore sod and rock, correct drainage slopes, replace edging, and remove debris, all in compliance with the attached Statement of Work and OSHA, NEC, EPA, and NFPA standards. The contract requires adherence to the U.S. Department of Labor wage determination 2015-4137 Revision 31 for each site, and contractors must submit pricing on SF 18 or company letterhead, including UEI and CAGE codes from SAM.gov. The Government emphasizes site visits as critical to understanding site conditions, with Jorge Negrete coordinating access to the locations, and explicitly states that failure to inspect the site will not constitute grounds for claim post-award. Evaluation will be based on a trade-off process where technical approach and relevant experience are of equal importance and significantly outweigh price, which is not scored but reviewed for completeness and reasonableness. Payment must be processed through the Invoice Processing Platform, and contract administration is handled by Kerri Coffey as the primary point of contact. Additional requirements include mandatory sexual harassment and assault prevention training for all personnel within 30 days of assignment, annual renewal by March 1, and strict adherence to non-personal services terms prohibiting any form of Government supervision or control over contractor personnel. The contract incorporates multiple FAR clauses by reference, including those related to System for Award Management maintenance, prohibition of internal confidentiality agreements, and subcontract reporting, while explicitly noting that deviations in SAM.gov representations do not affect award eligibility. There are no options, no packaging or marking requirements specified, and
Department Of Commerce Noaa

POSTED

2 days ago

DEADLINE

in 6 days
View Details
NAICS: 221310
New
International
City of Lethbridge - Request for Proposal - WTP Filter Media Replacement
Solicitation # AB-2026-05467
The City of Lethbridge is seeking qualified vendors to replace the filter media at its Water Treatment Plant as part of a broader expansion initiative aimed at improving operational efficiency. The primary objective is to optimize filter performance by evaluating alternative media types that can enhance flow rates and overall treatment capacity, based on preliminary desktop assessments. This effort is critical to ensuring the plant meets future demand while maintaining water quality standards. Full-scale pilot testing will be required to validate performance under real-world conditions before any final selection or implementation, providing confidence in the long-term reliability and effectiveness of the chosen media. Interested parties must submit proposals in response to solicitation number AB-2026-05467, with a deadline of September 3, 2026, at 8:00 PM MT. The procurement is open to all eligible suppliers without set-aside provisions, and all work must be performed in Lethbridge, Alberta. Point of contact for questions and submissions is Nicki Van Eck, the Buyer, reachable via email at nicki.vaneck@lethbridge.ca. Proposals must demonstrate technical expertise in water treatment filtration systems, experience with pilot-scale testing, and a clear plan for evaluating and comparing media options to meet the city’s performance goals.
City of Lethbridge

POSTED

4 days ago

DEADLINE

in 30 days
View Details
NAICS: 221310
New
Federal
William Beaumont Army Medical Center, Fort Bliss, Texas Water Purification and Treatment Services
Solicitation # W81K0026QA253
The U.S. Department of Defense, through W40M MRC0 West, is soliciting proposals under contract number W81K0026QA253 for water purification and treatment services at William Beaumont Army Medical Center, Fort Bliss, Texas. The acquisition is structured as a Small Business Set Aside, open only to small businesses including Women-Owned, Economically Disadvantaged Woman-Owned, and Service-Disabled Veteran-Owned Small Businesses, with a NAICS code of 221310. The contract requires the lessee to provide, install, operate, and maintain a mobile water purification system under a Firm Fixed Price arrangement, with a base performance period of one year starting October 1, 2026, and two optional one-year extensions through September 30, 2029. The technical scope includes site preparation, utility connections, system commissioning, 95% uptime compliance, adherence to Joint Commission and OSHA standards, infection control protocols, and providing technical training to medical center staff. All proposals must meet strict technical acceptability criteria, including delivery and installation capability, before price is evaluated. The award will be made on a Lowest Price, Technically Acceptable basis, with failure to meet any technical requirement resulting in disqualification. Offers must be submitted electronically to designated points of contact by August 27, 2026, and contractors must be registered in SAM.gov with valid UEI and CAGE codes. Required compliance includes NIST SP 800-171, DFARS safeguarding clauses, antiterrorism training, PIV identification, and exclusion screenings via HHS OIG and TRICARE lists. Contractors are prohibited from engaging with entities linked to the Maduro regime or Xinjiang Uyghur Autonomous Region and must adhere to subcontracting limitations, with no more than 50% of payments going to non-similarly situated subcontractors. All invoicing must be submitted through WAWF, and the government retains full authority for inspection and acceptance at the Fort Bliss site. The Contracting Officer’s Representative will conduct continuous surveillance, and unprofessional conduct or noncompliance may lead to immediate termination. No contract value is available as pricing data is not included in the solicitation, but full pricing by CLIN is mandatory for proposal eligibility.
W40M MRC0 West

POSTED

5 days ago

DEADLINE

in 22 days
View Details
NAICS: 221310
New
SLED
California American Water Company Monterey Operation of Begonia Well 3 Water Supply Permit AmendmentThe California American Water Company seeks approval to operate Begonia Well 3, a newly constructed water supply well in Monterey County that replaces an existing well within its system. The proposal is submitted as an amendment to the water supply permit under the jurisdiction of the State Water Resources Control Board, with the well site located in California and subject to local regulatory oversight. The well was constructed under a permit issued by Monterey County, and the amendment seeks formal recognition and authorization for its integration into the company’s water supply network to maintain service reliability and compliance with state standards. Key contacts for this permit amendment include Jonathan Weininger, District Engineer at the State Water Resources Control Board, who serves as the primary point of contact for regulatory review, and Spencer Vartanian, Director of Operations for California American Water Company, representing the applicant’s operational perspective. Roger Van Horn from Monterey County’s Drinking Water Protection Program also plays a critical role in local permitting and well compliance. The request was posted on July 31, 2026, and additional details can be accessed through the California Environmental Quality Act network portal, reflecting the procedural and environmental review process required for such water infrastructure changes.
State Water Resources Control Board

POSTED

5 days ago

DEADLINE

N/A
View Details
NAICS: 221310
New
Federal
H946--Separate RO/DI Requirement Dayton - Services
Solicitation # 36C25026Q0820
The Dayton Veterans Affairs Medical Center is seeking information from qualified firms to support the preventative maintenance of reverse osmosis systems, water softeners, and related hemodialysis and laboratory water purification equipment. The requirement mandates comprehensive, scheduled service including monthly, quarterly, semiannual, and annual tasks such as filter and membrane replacements, chemical and ozone disinfections, water hardness testing, and system inspections, all performed in strict compliance with ANSI/AAMI ST108 and VHA Directive 1061. Contractors must provide all labor, materials, parts, and supervision, and must coordinate directly with the Contracting Officer’s Representative, Robert Rhoad, submitting service reports via email and adhering to strict on-site protocols including VA-issued identification badges and key handling procedures. The scope encompasses maintenance for multiple systems including the SPS Evoqua RO system, six water softeners, the B330-2B100 RO system, and specialized dialysis and lab purification units requiring ultra-pure deionized and carbon filtration systems. Replacement components such as DI exchange tanks, carbon tanks, UV lamps, endotoxin filters, and other consumables are specified with defined frequencies, and contractors must supply all required materials unless otherwise noted. Work must occur during standard business hours Monday through Friday excluding federal holidays at the Dayton VA Medical Center, with performance monitored and accepted solely by the COR. No government-furnished equipment or security accreditation is required, and all shipping must include purchase order numbers. The solicitation is a sources sought notice open through August 7, 2026, using NAICS code 221310, and responses must be submitted to Ronald Heidemann via email with company details, socioeconomic status, available contract vehicles, and any suggested NAICS code changes.
250-NETWORK Contract Office 10 (36C250)

POSTED

6 days ago

DEADLINE

in 2 days
View Details