Operation of Two Replacement Tanks and Chlorination- U.S. Navy SERE Warner Springs Water Supply Permit Amendment

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

NAICS

N/A

Place of Performance

Highway 79 near Alder Road, CA, 92086

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → State Water Resources Control Board
Contacts2 people available
OfficeN/A
Office AddressN/A
Contacts
Wendy PierceSenior Environmental Scientist
Victoria NguyenWater Compliance Manager

Full Description

Show more
The Applicant proposes the operation of two replacement potable water tanks, Tank 1602 (5,000-gallon) and Tank 1679 (40,000-gallon) and chlorination equipment which were installed on Navy property.

More opportunities from California → State Water Resources Control Board

Same awarding agency

NAICS: 541620
SLED
Relicensing of Balch Hydroelectric Project
Solicitation # Project No. 175
The relicensing of the 131.52-megawatt Balch Hydroelectric Project, identified as FERC Project No. 175, is being managed by the State Water Resources Control Board in Fresno County, California. Proposed by Pacific Gas and Electric Company, the project involves the continued operation of the Black Rock Reservoir, Balch Diversion Dam, Balch Afterbay and Afterbay Dam, two powerhouses, and approximately 28 miles of transmission and distribution lines. Key objectives include the rehabilitation of recreation facilities, the designation of 14 miles of roads and 2.5 miles of trails as project assets, the decommissioning of the Black Rock Creek and Weir Creek feeder facilities, and the modification of the FERC project boundary to better define operational lands and waters. The project is primarily operated as a peaking facility for power demand and irrigation, with operations coordinated with the Haas-Kings River Hydroelectric Project. Environmental compliance has been addressed through a Mitigated Negative Declaration under the California Environmental Quality Act, which determined that the project will not have a significant environmental impact. This process included a comprehensive Initial Study and a public comment period ending in December 2025. Administrative requirements included a filing fee of 3,043.75 dollars paid to the California Department of Fish and Wildlife. The project is overseen by Project Manager Jessica Dyke and must adhere to the Federal Power Act and specific FERC license articles.
Environmental Consulting Services

POSTED

4 months ago

DEADLINE

N/A
View Details
NAICS: 221111
SLED
Relicensing of Helms Pumped Storage Project
Solicitation # 2025110960
The State Water Resources Control Board is overseeing the FERC relicensing of the 1,212-megawatt Helms Pumped Storage Project, operated by Pacific Gas and Electric Company (PG&E) in Fresno and Madera Counties, California. The project scope includes the continued operation of the facility, the rehabilitation and replacement of existing recreation facilities, and the formal designation of approximately 36 miles of roads and one mile of trails as project infrastructure. Additionally, the project involves modifying the FERC Project boundary to accurately define lands necessary for operation and maintenance and implementing new protection, mitigation, and enhancement plans. Environmental compliance has been managed through the California Environmental Quality Act (CEQA) process, resulting in a Final Mitigated Negative Declaration in July 2026. This determination concluded that the project would not significantly affect the environment, and no further mitigation conditions or monitoring plans were required. Key regulatory requirements include obtaining a water quality certification under section 401 of the federal Clean Water Act and adhering to CalGEM guidelines regarding the safety and abandonment of oil, gas, or geothermal wells within the project area. The project is supported by Stantec Consulting Services, Inc., and involves coordination with trustee agencies such as the California Department of Fish and Wildlife.
Hydroelectric Power Generation

POSTED

12 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS