Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Relicensing of Helms Pumped Storage Project

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The project involves the relicensing of Pacific Gas and Electric Company’s Helms Pumped Storage Project under FERC No. 2735, with the goal of continuing operations while enhancing environmental protections and public access. PG&E seeks to maintain water transfers between Courtright Lake and Lake Wishon for power generation and storage, while replacing and rehabilitating recreation facilities, redesignating approximately 36 miles of roads and one mile of trails as official Project infrastructure, and adjusting the FERC Project boundary to better reflect operational needs. The Project includes underground tunnels, penstocks, a powerhouse, switchyard, transmission lines, and ancillary facilities, all situated within Fresno and Madera Counties along the North Fork Kings River. Environmental compliance is central to the license renewal, requiring adherence to a suite of state and federal regulations including the Clean Water Act, Endangered Species Act, and California Environmental Quality Act. Numerous condition-specific obligations are embedded in the licensing framework, enforced through detailed exhibits that serve as operational mandates rather than standard federal contract clauses. These include maintaining minimum water flows and quality, implementing adaptive management strategies, monitoring fish populations and hatchery performance, protecting endangered and threatened species, conducting archaeological surveys, controlling erosion, restoring disturbed areas, and limiting noise and seasonal operations. PG&E is responsible for annual reporting, public notifications, emergency response, cultural resource protection, wildlife habitat management, and providing public recreation access under approved plans. Oversight is coordinated by the State Water Resources Control Board, with key contacts for environmental compliance and project management provided. Submissions for environmental certification are due by December 19, 2025, and compliance is measured through annual reports and agency inspections rather than traditional procurement metrics. While no formal contract value, pricing structure, or acquisition type is specified, the project’s scope implies long-term operational and environmental management responsibilities spanning the lifetime of the new FERC license, with no indication of small business set-asides or socioeconomic classifications applying to the contractor.

General Info

PG&E renews Helms Project license with enhanced environmental protections, water management, and public access under strict regulatory compliance.

Agency

California → State Water Resources Control Board

NAICS

221111 - Hydroelectric Power GenerationView NAICS

Place of Performance

CA, 93664

Set-Aside

NONE

Documents

(10)

Helms Pumped Storage Project Notice of Determination

PDFnotice-of-determination

Final Mitigated Negative Declaration for Helms Pumped Storage Project FERC 2735

PDFmitigated-negative-declaration

Relicensing of Helms Pumped Storage Project Summary Form

PDFsummary-form

2026 Environmental Document Filing Fee Cash Receipt - Helms Pumped Storage Project

PDFreceipt

SCH2025110960 - Relicensing of Helms Pumped Storage Project - CalGEM Well Abandonment Advisory

PDFspecial-notice

Helms Pumped Storage Project NOI and Draft MND Public Comment Notice

PDFnotice-of-intent

Draft Mitigated Negative Declaration for Helms Pumped Storage Project FERC No. 2735

PDFmitigated-negative-declaration

CDFW Comment on Helms Pumped Storage Project MND 2025110960

PDFcomment

Helms Pumped Storage Project Initial Study May 19, 2025

PDFinitial-study

Helms Pumped Storage Project Notice of Completion

PDFnotice-of-completion

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

1 update
Posted

forecast

Amendment 1

Contract was updated

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → State Water Resources Control Board
Contacts2 people available
OfficeN/A
Organization / Agency
California → State Water Resources Control Board
Office AddressN/A
Contacts
Jessica DykeEnvironmental Scientist
Alexander TessierRelicensing Project Manager

Interested Companies (1)

Show more
Stantec Consulting Services
San Francisco, CA

Full Description

Show more
The Proposed Project covered by this Notice of Determination involves the FERC relicensing of Pacific Gas and Electric Company’s (PG&E) Helms Pumped Storage Project (Project). PG&E has applied for a new FERC license for the Proposed Project, under which it proposes to: (1) continue to operate the Helms Pumped Storage Project; (2) replace and rehabilitate existing recreation facilities; (3) designate approximately 36 miles of existing roads and approximately one mile of existing trails as Project roads and trails; (4) modify the FERC Project boundary to more accurately define lands necessary for Project operation and maintenance activities under a new FERC Project license; and (5) implement new protection, mitigation, and enhancement plans and measures. The Project transfers water to and from Courtright Lake (upper reservoir) and Lake Wishon (lower reservoir) for power generation and water storage. The Project's two intake-discharge structures are normally underwater, and all Project facilities and structures used to exchange water between the two reservoirs are underground. Courtright Lake and Lake Wishon are impounded by Courtright Dam and Wishon Dam, respectively, all of which are licensed facilities of PG&E’s Haas-Kings River Hydroelectric Project. The Project includes Courtright Intake-Discharge Structure; Wishon Intake-Discharge Structure; Tunnels 1, 2, and 3; Helms Penstocks; Lost Canyon Pipe; Helms Powerhouse; Helms Switchyard; approximately 65 miles of transmission and distribution lines; approximately 38 miles of non-recreational Project roads and trails; three helicopter landing zones; an 80-acre wildlife habitat management area; 12 recreational facilities near Courtright Lake and Lake Wishon; and ancillary support facilities.

Similar Contracts

Same NAICS industry code

NAICS: 221111
SLED
Camp Far West Hydroelectric Relicensing Project
Solicitation # CFW-amend_2021100570_NOD_signed
The Camp Far West Hydroelectric Project, a 6.8-megawatt facility on the Bear River in Yuba County, California, operates under a revised water quality certification issued by the State Water Resources Control Board on October 22, 2025, amending the original certification dated May 16, 2022. The project includes Camp Far West Reservoir, dam, spillway, intake tower, powerhouse, switchyard, and two recreation areas, and the amendment primarily updates two conditions: Condition 2(D) concerning the evaluation of flows under State Clearinghouse Number 2021100570 and Condition 16 regarding the auxiliary spillway project under SCH No. 2018092009. The South Sutter Water District serves as the Lead Agency, with oversight and approval responsibilities resting with the State Water Resources Control Board, which determined that the amended certification complies with the California Environmental Quality Act, supported by a Negative Declaration finding no significant environmental impacts. There is no formal contract value, pricing structure, or procurement mechanism identified, as this is an environmental regulatory action rather than a federal procurement contract; consequently, no Federal Acquisition Regulation clauses, payment terms, invoicing systems, or contractor assessment criteria apply. Performance obligations center on continued compliance with revised flow conditions and spillway design standards to ensure water quality and ecological integrity, with no specified timeline for implementation or delivery milestones outlined. While physical access to supporting environmental documentation such as the Environmental Impact Report and Negative Declaration is available at the Water Rights Library in Sacramento, there are no formal packaging, inspection, acceptance, or reporting procedures defined within the regulatory amendment itself. Key point of contact for environmental compliance is James Kyle Noss, Environmental Scientist at the State Water Resources Control Board, and Hayden Cornwell of the South Sutter Water District, though neither is formally designated as a contracting officer or representative. The project operates under state environmental law and Federal Energy Regulatory Commission licensing, but no federal acquisition systems, contractual forms, clauses, or socioeconomic certifications are involved, distinguishing it from traditional contracting frameworks.
South Sutter Water District

POSTED

10 months ago

DEADLINE

N/A
View Details