Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, August 19 at 2:00 PM EDT

Register Free →

Bucks Creek Hydroelectric Project (FERC Project No. 619)

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The petition seeks to amend Water Right License 1926 associated with the Bucks Creek Hydroelectric Project by removing six points of diversion—A, C, D, E, F, and G—to align with the State Water Board’s final Water Quality Certification issued on October 20, 2020. These modifications are necessary to ensure compliance with environmental regulations and water quality standards while maintaining operational integrity for the project. The remaining eight points of diversion—B, H, I, J, K, L, M, and N—will continue to be authorized under the license, preserving the project’s ability to divert water for hydroelectric generation under approved conditions. The action is being pursued by the City of Santa Clara as the project sponsor, with oversight and coordination involving the California State Water Resources Control Board. The petition is part of a broader effort to balance hydropower operations with regulatory requirements for aquatic ecosystem protection. The point of contact for this matter includes Michael Meza from the Water Resources Control Board and John Davidson, Project Manager at the City of Santa Clara, with the project tied to FERC License No. 619 and located in Quincy, California.

General Info

Amend Water Right License 1926 to remove six diversion points, retain eight for compliant hydropower operations.

Agency

California → City of Santa Clara

NAICS

221111 - Hydroelectric Power GenerationView NAICS

Place of Performance

Quincy, CA

Set-Aside

NONE

Documents

(1)

Notice of Determination for Bucks Creek Hydroelectric Project

PDFnotice-of-determination

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Clara
Contacts2 people available
OfficeN/A
Organization / Agency
California → City of Santa Clara
Office AddressN/A
Contacts

Full Description

Show more
Petition to Change Water Right License 1926. License 1926 contained 14 Points of Diversion. The petition requested to remove diversion locations A, C, D, E, F, and G. The removal of the PODs is to comply with the State Water Board issued final Water Quality Certification issued on October 20, 2020. Diversions B, H, I, J, K, L, M, and N are to remain on License 1926.

Similar Contracts

Same NAICS industry code

NAICS: 221111
SLED
Relicensing of Helms Pumped Storage Project
Solicitation # SCH2025110960
The project involves the relicensing of Pacific Gas and Electric Company’s Helms Pumped Storage Project under FERC No. 2735, with the goal of continuing operations while enhancing environmental protections and public access. PG&E seeks to maintain water transfers between Courtright Lake and Lake Wishon for power generation and storage, while replacing and rehabilitating recreation facilities, redesignating approximately 36 miles of roads and one mile of trails as official Project infrastructure, and adjusting the FERC Project boundary to better reflect operational needs. The Project includes underground tunnels, penstocks, a powerhouse, switchyard, transmission lines, and ancillary facilities, all situated within Fresno and Madera Counties along the North Fork Kings River. Environmental compliance is central to the license renewal, requiring adherence to a suite of state and federal regulations including the Clean Water Act, Endangered Species Act, and California Environmental Quality Act. Numerous condition-specific obligations are embedded in the licensing framework, enforced through detailed exhibits that serve as operational mandates rather than standard federal contract clauses. These include maintaining minimum water flows and quality, implementing adaptive management strategies, monitoring fish populations and hatchery performance, protecting endangered and threatened species, conducting archaeological surveys, controlling erosion, restoring disturbed areas, and limiting noise and seasonal operations. PG&E is responsible for annual reporting, public notifications, emergency response, cultural resource protection, wildlife habitat management, and providing public recreation access under approved plans. Oversight is coordinated by the State Water Resources Control Board, with key contacts for environmental compliance and project management provided. Submissions for environmental certification are due by December 19, 2025, and compliance is measured through annual reports and agency inspections rather than traditional procurement metrics. While no formal contract value, pricing structure, or acquisition type is specified, the project’s scope implies long-term operational and environmental management responsibilities spanning the lifetime of the new FERC license, with no indication of small business set-asides or socioeconomic classifications applying to the contractor.
State Water Resources Control Board

POSTED

13 days ago

DEADLINE

N/A
View Details
NAICS: 221111
SLED
Camp Far West Hydroelectric Relicensing Project
Solicitation # CFW-amend_2021100570_NOD_signed
The Camp Far West Hydroelectric Project, a 6.8-megawatt facility on the Bear River in Yuba County, California, operates under a revised water quality certification issued by the State Water Resources Control Board on October 22, 2025, amending the original certification dated May 16, 2022. The project includes Camp Far West Reservoir, dam, spillway, intake tower, powerhouse, switchyard, and two recreation areas, and the amendment primarily updates two conditions: Condition 2(D) concerning the evaluation of flows under State Clearinghouse Number 2021100570 and Condition 16 regarding the auxiliary spillway project under SCH No. 2018092009. The South Sutter Water District serves as the Lead Agency, with oversight and approval responsibilities resting with the State Water Resources Control Board, which determined that the amended certification complies with the California Environmental Quality Act, supported by a Negative Declaration finding no significant environmental impacts. There is no formal contract value, pricing structure, or procurement mechanism identified, as this is an environmental regulatory action rather than a federal procurement contract; consequently, no Federal Acquisition Regulation clauses, payment terms, invoicing systems, or contractor assessment criteria apply. Performance obligations center on continued compliance with revised flow conditions and spillway design standards to ensure water quality and ecological integrity, with no specified timeline for implementation or delivery milestones outlined. While physical access to supporting environmental documentation such as the Environmental Impact Report and Negative Declaration is available at the Water Rights Library in Sacramento, there are no formal packaging, inspection, acceptance, or reporting procedures defined within the regulatory amendment itself. Key point of contact for environmental compliance is James Kyle Noss, Environmental Scientist at the State Water Resources Control Board, and Hayden Cornwell of the South Sutter Water District, though neither is formally designated as a contracting officer or representative. The project operates under state environmental law and Federal Energy Regulatory Commission licensing, but no federal acquisition systems, contractual forms, clauses, or socioeconomic certifications are involved, distinguishing it from traditional contracting frameworks.
South Sutter Water District

POSTED

10 months ago

DEADLINE

N/A
View Details