400 Saratoga Pruneridge Apartments

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The 400 Saratoga Pruneridge Apartments project involves the redevelopment of a 31-acre site at 400 Saratoga Avenue in Santa Clara, California. The project will divide the land into three parcels to facilitate the construction of a five-story apartment building featuring up to 316 units, including 47 affordable units, and an integrated seven-story parking garage. Additional construction includes a new 2,460 square foot one-story maintenance facility and a 1.77-acre public park dedicated to the City. The remaining 25.54 acres will maintain the Pruneridge Golf Club, though approximately 19.1 acres of the course will be reconfigured to accommodate the new developments. This project requires a General Plan Amendment and Rezoning of the 3.66-acre residential portion from Planned Development to Very High-Density Residential (R-5). The development is subject to comprehensive environmental review under the California Environmental Quality Act, with a Draft Environmental Impact Report addressing air quality, noise, biological resources, and geotechnical stability. Key infrastructure includes a new 26-foot-wide driveway on Pruneridge Avenue providing access to 414 vehicle parking stalls and 332 bicycle stalls. To comply with the City's 2022 Climate Action Plan, the project implements a Transportation Demand Management Plan aiming for a 20 percent reduction in vehicle miles traveled. Construction is estimated to take approximately 26 months, with a phased schedule spanning from January 2027 through February 2029. The project also incorporates green building measures such as EV charging stations, recycled water for landscaping, and adherence to CALGreen standards.

General Info

Redeveloping 31 acres in Santa Clara for 316 apartments, parking, and a park.

Agency

California → City of Santa Clara

NAICS

236116 - New Multifamily Housing Construction (except For-Sale Builders)View NAICS

Place of Performance

Pruneridge Avenue/ Saratoga Avenue, Santa Clara, CA, 95050

Set-Aside

NONE

Documents

(15)

Environmental Impact Report Summary for Golf Course Redevelopment Project

PDFeir-summary

Appendix H TDM Plan for 400 Saratoga Avenue Residential Development

PDFtdm-plan

Appendix H Transportation Assessment for 400 Saratoga Avenue Residential Development

PDFtransportation-assessment

DTSC Comments on Draft EIR for 400 Saratoga Pruneridge Apartments Project

PDFcomment-letter

SCH# 2025050498 400 Saratoga Pruneridge Apartments Project Summary

PDFenvironmental-summary

Notice of Availability of Environmental Impact Report for 400 Saratoga Avenue Project

PDFspecial-notice

Phase I Environmental Site Assessment Report 400 Saratoga Avenue

PDFenvironmental-assessment

Appendix B Air Quality and Greenhouse Gas Assessment for 400 Saratoga Avenue Project

PDFenvironmental-assessment

Preliminary Geotechnical Exploration Report for Pruneridge Golf Club Multi-Family Project

PDFgeotechnical-report

Appendix G Noise and Vibration Assessment for 400 Saratoga Avenue Project

PDFnoise-and-vibration-assessment

Notice of Preparation for 400 Saratoga Pruneridge Apartments Project

PDFnotice-of-preparation

Draft Environmental Impact Report 400 Saratoga Avenue Residential Project

PDFenvironmental-impact-report

NOC - Pruneridge EIR OCR

PDFnotice-of-completion

City of Santa Clara 2022 Climate Action Plan Compliance Checklist

PDFcompliance-checklist

Appendix C Arborist Report for Pruneridge Golf Course

PDFarborist-report

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santa Clara
Contacts3 people available
OfficeN/A
Organization / Agency
California → City of Santa Clara
Office AddressN/A
Contacts
Daniel SobczackCity Planner
Patrick KallasProject Manager
Scott WalshDirector of Acquisitions

Interested Companies (1)

Show more
David J Powers and Associates
San José, CA

Full Description

Show more
Project Location and Existing Setting The approximately 31-acre project site is comprised of one parcel (Assessor’s Parcel Number [APN] 294-45-055) located at 400 Saratoga Avenue in the City of Santa Clara. The project site consists of the nine-hole Pruneridge Golf Club, including a clubhouse, driving range, maintenance facility, and landscaping. The site is surrounded by residences to the north, Saratoga Avenue, residential, retail, and a preschool to the east, Pruneridge Avenue, retail, and a gas station to the south, and San Tomas Expressway and residential uses to the west. The project site has a General Plan designation of Parks/Open Space and is within a PD – Planned Development zoning district. Project Description The project site would be divided into three parcels and proposes residential development on the southwestern parcel (3.66 acres), a 1.77-acre public park, and the golf course on the remaining 25.54 acres. While the golf course would be reconfigured, no changes are proposed to the existing 6.4-acre portion of the golf course parcel that consists of the driving range, clubhouse, and surface parking lot. Proposed Residential Development and Maintenance Facility The project would include the demolition of approximately 1,800 square feet of maintenance buildings (at the southern end of the site) and construction of a five-story apartment building with up to 316 units wrapped around a seven-story parking garage structure (Building 1), and a new onestory, 2,460 square foot maintenance building (Building 2) with an approximately 4,286 square foot outdoor storage and equipment yard. Building 2 would be located east of Building 1. The residential portion of the project would be located on the parcel at the southwest corner of the site, and most units would include a private outdoor deck or balcony. Building 1 would have a maximum height of 69 feet for the residential building and 82 feet for the parking garage structure contained within the residential building. The residential building would designate 47 units as affordable dispersed around the building. Building 2 would replace the existing 1,800 square foot on-site maintenance building. The proposed building would have a maximum height of 20 feet at the top of the roof. The storage yard would be used to store equipment such as driving range ball pick-up machines, mowers, tractors and aerifiers. The proposed project would also include a new approximately 1.77 acre (77,140 square foot) public park which would be dedicated to the City. The park would be designed by the City of Santa Clara and constructed as a part of the proposed project. The project would require the City’s approval of a General Plan Amendment and Rezoning for the 3.66-acre residential portion of the site. The existing General Plan land use designation would change from Parks/Open Space to Very High Residential (which allows up to 100 residential units per acre). This portion of the site would be rezoned from a PD - Planned Development Zoning to an R-5 – Very High-Density Residential Zoning which allows high-density residential development ranging from 51 units per acre to 100 units per acre. The proposed maintenance facility and public park would retain the site’s existing Parks/Open Space General Plan land use designation and PD – Planned Development zoning district. Proposed Golf Course Reconfiguration As proposed, the project would reconfigure the layout of approximately 19.1 acres of the existing golf course, which would include the relocation of holes from the redeveloped portion of the site and replacement of some existing landscaping with new landscaping. No changes are proposed for the existing driving range, clubhouse, and parking lot which total approximately 6.4 acres. The existing General Plan Parks/Open Space land use designation and PD Zoning would be retained on this portion of the site. Vehicle and Pedestrian Access and Parking Vehicle access to the project site would be provided via a new 26-foot-wide driveway on Pruneridge Avenue. The driveway on Pruneridge Avenue would provide access to the parking structure for Building 1, the parking area for the public park, and the maintenance yard area for Building 2. The Building 1 parking structure would include up to 414 vehicle parking stalls, including 42 electric vehicle (EV) stalls, 274 EV ready stalls, and seven visitor stalls. In addition, a total of 332 bicycle parking stalls would be included. These bicycle parking spaces would be split between temporary and long term spaces in ratios consistent with City requirements. Thirteen parking spaces would be provided for the public park. Open Space Park, Landscaping, and Outdoor Areas The project would have approximately 1.26 acres of common open space for future residents. The residential building would include a swimming pool and spa in the approximately 9,950 square foot central courtyard area. Additional outdoor common space would also include an approximately 1,400 square foot 5th floor roof deck area. The project’s indoor fitness room and clubhouse area would total approximately 9,381 square feet. Landscaping, including trees, would be planted throughout the outdoor areas which would total approximately 34,245 square feet. The construction and dedication of the future City park located on the eastern end of the project site would serve the residents of the project site and the general public. Construction and Demolition The project would export up to 2,000 cubic yards of soil from the project site (this includes both the residential and golf sites). Development of the residential and maintenance buildings on the project site would require grading for utilities, drainage, roads, and buildings foundations. Demolition and construction of the residential component of the project would take up to approximately 26 months. Construction of the golf course redesign would require grading and excavation to move some of the existing holes and improve drainage and irrigation on-site. The golf course redesign would only occur if the proposed residential component was constructed and would be completed in a second phase of construction taking approximately 10 months. There are portions of the golf course renovation that may be able to run in advance of or concurrently with the housing project while Design and Construction Drawings are in progress. The entire project, including the golf course improvements, is estimated to take approximately 26 months. Utilities Stormwater runoff would flow to drainage management areas and would be treated in bioretention/biotreatment areas. Stormwater would be directed to three existing 15-inch storm drains in Pruneridge Avenue, and flow to the City’s stormwater system. New domestic water lines and fire service water lines would connect to existing eight- to 10-inch water mains in Pruneridge Avenue. The project would connect to a 16-inch recycled water line in Pruneridge Avenue. Recycled water would be used for outdoor landscaping at the residential building, park area, maintenance facility, and golf course areas of the site. The project’s new sanitary sewer lines would connect to existing 10-inch sanitary sewer lines in Pruneridge Avenue. Electricity at the project site would be provided by Silicon Valley Power (SVP). Green Building and Water Conservation Measures The proposed project would include the following green building measures in compliance with the California Green Building Standards Code—Part 11, Title 24, California Code of Regulations (CALGreen): • Bicycle facilities and EV charging stations. • Construction in conformance with Title 24 and CALGreen to promote energy and water efficiency. • Install a plumbing and wiring chase for a future solar hot water installation. • Recycled water for landscaping • Optimized energy performance using efficient HVAC equipment and building materials. • Ongoing metering of power usage. • Efficient landscape water usage and installation of low flow fixtures within the buildings. • Proper disposal of on-site waste including recyclables, yard trimmings, and garbage. • Planting trees and installing roofing materials to reduce the heat island effect. Transportation Demand Management Plan Measures The City’s Climate Action Plan (CAP) states that multi-family developments must achieve a minimum 20 percent reduction in vehicle miles traveled (VMT) with 10 percent reduction through the implementation of active transportation demand management (TDM) measures. The project TDM Plan includes the TDM measures and features listed below. • Program administration for the TDM program including designating a transportation coordinator, providing an online kiosk/TDM information board and transportation information brochures, participation in a transportation management association, and trip planning assistance. • Density of housing and affordable housing in proximity to transit • A bike share program • Bicycle parking • Sidewalk improvements along the project frontage • Contribution to a future bike lane

Similar Contracts

Same NAICS industry code

NAICS: 236116
New
SLED
The Bloc
Solicitation # CPC-2021-9959-TDR-SPR, ENV-2021-9959-EIR
The Bloc project, managed by the Los Angeles Department of City Planning under solicitation numbers CPC-2021-9959-TDR-SPR and ENV-2021-9959-EIR, involves the expansion of a mixed-use development located at 700 South Flower Street, 700 West 7th Street, and 711 South Hope Street. The scope of work includes the construction of a residential tower with up to 466 units, the addition of two above-ground parking levels atop the existing nine-story podium building, and the enclosure of the existing rooftop parking level. To accommodate the new tower, 24,342 square feet of existing theater and retail space within the podium will be demolished. The final development will span a 4.3-acre site with a total floor area of 1,894,988 square feet and reach a maximum height of 710 feet, or 53 stories. Additionally, the project establishes a Sign District featuring digital displays, supergraphics, and various on- and off-site signage. The project has been processed in accordance with the California Environmental Quality Act, with the Los Angeles City Council granting approval on September 16, 2025. The project is subject to a certified Environmental Impact Report and the adoption of a mitigation reporting and monitoring plan to address significant environmental effects. Key administrative contacts include City Planner Kathleen King and Project Applicant Dan Cote. The development integrates with existing site structures, which currently include a 26-story hotel and a 33-story office building.
City of Los Angeles

POSTED

1 day ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS