Yuba River Development Project and the Narrows Hydroelectric Project FERC Relicensings

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Yuba County Water Agency is seeking relicensing from the Federal Energy Regulatory Commission for a 50-year term to continue the operation and maintenance of the Yuba River Development Project and the Narrows Hydroelectric Project. Located across Yuba, Sierra, and Nevada Counties, the Yuba River Development Project has an installed capacity of 361.9 megawatts and includes facilities such as the New Bullards Bar Reservoir and the New Colgate Powerhouse. Proposed improvements for this project include the construction of a new Tailwater Depression System, the installation of outlet pipes at the Our House and Log Cabin Diversion Dams, the replacement of a gate at the Lohman Ridge Diversion Tunnel, and the expansion of recreation facilities at New Bullards Bar Reservoir through new campgrounds, a picnic site, and a trail. The Narrows Hydroelectric Project, located near Englebright Dam, requires no new facilities or changes to existing works. The projects are subject to strict environmental compliance under the California Environmental Quality Act and the California Endangered Species Act, as well as the Clean Water Act. A Mitigation Monitoring and Reporting Program has been established to manage impacts on biological and cultural resources, including specific protocols for human remains, bat exclusion windows, and aquatic habitat protection. Contractors must adhere to CARB truck regulations, utilize renewable diesel, and implement dust control plans per NSAQMD Rule 226. The project has undergone a comprehensive environmental review process, including a Joint Environmental Impact Report and coordination with the State Water Resources Control Board and the California Department of Fish and Wildlife, culminating in a Notice of Determination certifying that the projects will be implemented with adopted mitigation measures.

General Info

Yuba County Water Agency seeks 50-year relicensing for two hydroelectric power projects.

Agency

California → Yuba County Water Agency

NAICS

221111 - Hydroelectric Power GenerationView NAICS

Place of Performance

Marysville Road, Marysville, CA, 95901

Set-Aside

NONE

Documents

(14)

Yuba Water Agency YRDP & Narrows Hydroelectric Project Notice of Completion

PDFnotice-of-completion

Yuba River Development Project and Narrows Hydroelectric Project Mitigation Monitoring and Reporting Program

PDFmitigation-monitoring-reporting-program

YRDP Narrows Notice of Determination

PDFnotice-of-determination

2024101277 SWRCB Comments on YCWA Draft EIR for Yuba River Development Project Relicensing

PDFcomments

Yuba Water Agency Draft Environmental Impact Report Notice of Availability

PDFspecial-notice

YWA_YDRP & Narrows_FEIR_Chapters 1-4

PDF

Yuba River Development Project and Narrows Hydroelectric Project FEIR Summary

PDFenvironmental-summary

Yuba Water Agency YRDP & Narrows EIR Letter of Amendment

PDFamendment

CDFW Comments on Yuba River Development Project DEIR

PDFcomment

Yuba Water Agency YRDP & Narrows Joint Environmental Impact Report July 2025

PDFenvironmental-impact-report

Yuba Water Agency Response to CDFW Comments on Draft EIR for Yuba River Development Project

PDFresponse-to-comments

Yuba River Development Project and Narrows Hydroelectric Project Notice of Determination

PDFnotice-of-determination

Yuba Water Agency YRDP & Narrows Hydroelectric Project Summary Form

PDFenvironmental-summary

Memorandum on Yuba River Development Project Review Period Extension

PDFmemorandum

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Yuba County Water Agency
Contacts1 person available
OfficeN/A
Organization / Agency
California → Yuba County Water Agency
Office AddressN/A
Contacts
John JamesDirector of Resource Planning

Full Description

Show more
The YRDP is located in Yuba, Sierra and Nevada Counties, on the main stems of the Yuba River, the North Yuba River and the Middle Yuba River, and on Oregon Creek, a tributary to the Middle Yuba River. The Narrows Project is located near Englebright Dam in unincorporated Nevada County. Yuba Water has applied for relicensing of both the YRDP and the Narrows Project to the Federal Energy Regulatory Commission (FERC), each for a 50-year term, that would allow for the continued operations and maintenance of the existing YRDP and Narrows Project hydropower facilities. As part of the new license, the YRDP proposes to construct a new Tailwater Depression System at the New Colgate Powerhouse, install outlet pipes at the Our House and Log Cabin Diversion Dams, and replace an existing gate at the Lohman Ridge Diversion Tunnel connecting the two diversion dams. The YRDP also proposes to improve existing recreation facilities at New Bullards Bar Reservoir, plus add two new campground areas, a picnic site, and a trail. Yuba Water does not propose any changes to the existing Narrows Project works or facilities, and no new facilities are proposed. Both projects would have changes to license conditions affecting issues such as biological resources and cultural resources.

Similar Contracts

Same NAICS industry code

NAICS: 221111
SLED
Bucks Creek Hydroelectric Project (FERC Project No. 619)
Solicitation # 2019069104
Pacific Gas and Electric Company is seeking water quality certification for the Bucks and Grizzly Creek Gravel Augmentation Project in Plumas County, California. This initiative implements the Gravel Augmentation Plan required by Condition 14 of the Bucks Creek Hydroelectric Project certification to enhance trout spawning habitats and populations. The project involves placing gravel at two specific sites: one on Bucks Creek approximately 0.3 miles downstream of the Lower Bucks Dam Spillway, and another on Grizzly Creek about 400 feet downstream of the gaging weir. To facilitate these activities, the company is pursuing Clean Water Act Section 404 permitting under the United States Army Corps of Engineers Regional General Permit 16 for aquatic habitat restoration and enhancement. The project is governed by the California Environmental Quality Act, with a CEQA Supplement prepared to ensure environmental compliance. Notices of Determination filed by the State Water Resources Control Board confirm that the project will not have a significant environmental effect, and no mitigation measures or monitoring plans were adopted. Administrative oversight involves the State Water Resources Control Board Division of Water Rights, with the project identified under solicitation number 2019069104. Performance is centered in Plumas County, specifically near Quincy, California.
City of Santa Clara

POSTED

11 days ago

DEADLINE

N/A
View Details
NAICS: 221111
SBIR / STTR
Energy Technologies
Solicitation # NSF 26-510
National Science Foundation solicitation NSF 26-510, posted May 22, 2026, seeks Small Business Innovation Research and Small Business Technology Transfer proposals to develop deep technologies that enhance U.S. competitiveness and security. The Energy Technologies topic specifically targets new energy sources, power generation, energy storage, and electronic systems for mobile and off-grid applications. Priority is given to proposals focusing on carbon conversion, disruptive technologies in conventional resources, the integration of energy technologies with data and computational tools, and nature-inspired sustainable energy solutions. The program supports a wide range of energy storage scales, from wearable devices to power plants. The total anticipated funding for this solicitation is 210 million dollars, with individual award ceilings varying by phase: up to 305,000 dollars for Phase I, 1.25 million dollars for Phase II, and 1.55 million dollars for Fast-Track proposals. Strategic Breakthrough proposals may request up to 30 million dollars. Proposals are evaluated based on intellectual merit, broader impacts, and commercial potential. The Principal Investigator must be at least 51 percent employed by the small business and maintain specific minimum effort levels depending on the award phase. Organizations and PIs are limited to one proposal each. Submission deadlines for full proposals begin July 27, 2026, with subsequent deadlines extending through July 2027.
National Science Foundation

POSTED

4 months ago

DEADLINE

in 10 months
View Details
NAICS: 221111
SLED
Relicensing of Helms Pumped Storage Project
Solicitation # 2025110960
The State Water Resources Control Board is overseeing the FERC relicensing of the 1,212-megawatt Helms Pumped Storage Project, operated by Pacific Gas and Electric Company (PG&E) in Fresno and Madera Counties, California. The project scope includes the continued operation of the facility, the rehabilitation and replacement of existing recreation facilities, and the formal designation of approximately 36 miles of roads and one mile of trails as project infrastructure. Additionally, the project involves modifying the FERC Project boundary to accurately define lands necessary for operation and maintenance and implementing new protection, mitigation, and enhancement plans. Environmental compliance has been managed through the California Environmental Quality Act (CEQA) process, resulting in a Final Mitigated Negative Declaration in July 2026. This determination concluded that the project would not significantly affect the environment, and no further mitigation conditions or monitoring plans were required. Key regulatory requirements include obtaining a water quality certification under section 401 of the federal Clean Water Act and adhering to CalGEM guidelines regarding the safety and abandonment of oil, gas, or geothermal wells within the project area. The project is supported by Stantec Consulting Services, Inc., and involves coordination with trustee agencies such as the California Department of Fish and Wildlife.
State Water Resources Control Board

POSTED

10 months ago

DEADLINE

N/A
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS