Yuba River Development Project and the Narrows Hydroelectric Project FERC Relicensings
Active
State & LocalContract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
General Info
Agency
California → Yuba County Water Agency
NAICS
221111 - Hydroelectric Power GenerationView NAICS
Place of Performance
Marysville, CASet-Aside
NONE
Timeline
Organization & Contact Information
Show more
AgencyCalifornia → Yuba County Water Agency
Contacts2 people available
OfficeN/A
Organization / Agency
California → Yuba County Water Agency
Office AddressN/A
Contacts
Full Description
Show more
The Yuba River Development Project is located on the Yuba River, Middle Yuba River, North Yuba River, and Oregon Creek, and has an installed capacity of 361.9 megawatts. Main facilities include: New Bullards Bar Reservoir, Our House Diversion Dam Impoundment, Log Cabin Diversion Dam Impoundment, New Bullards Bar Dam, Our House Diversion Dam, Log Cabin Diversion Dam, Camptonville Diversion Tunnel, Lohman Ridge Diversion Tunnel, New Colgate Powerhouse, New Bullards Bar Minimum Flow Powerhouse, and Narrows 2 Powerhouse. Though YCWA does not own Englebright Dam, Englebright Reservoir, or Daguerre Point Dam, these facilities are critical infrastructure in operation of the Yuba River Development Project. As part of the Project, YCWA proposes: (1) a new tailwater depression system at New Colgate Powerhouse; (2) modification of the Our House and Log Cabin diversion dams fish release outlets; (3) modification to the Lohman Ridge Diversion Tunnel intake; (4) modifications to recreation facilities at New Bullards Bar Reservoir; (5) modifications to Project roads; and (6) modifications to Project operations and flow releases.
The Narrows Hydroelectric Project is located on the Yuba River and has an installed capacity of 12 megawatts. The Narrows Hydroelectric Project includes the Narrows 1 Powerhouse, Narrows Penstock, Narrows Tunnel, and the Powerhouse Access Tram. The Narrows Hydroelectric Project does not include any dams, intakes, switchyards or transmission lines, or roads. Water for the Narrows Hydroelectric Project is received from USACEs Englebright Reservoir through Englebright Dams intake and tunnel. YCWA has not proposed any changes to existing Narrows Hydroelectric Project facilities.
Similar Contracts
Same NAICS industry code
