Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Bishop Creek Hydroelectric Project Relicensing

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bishop Creek Hydroelectric Project Relicensing involves the continued operation of a hydroelectric system owned and operated by the Southern California Edison Company in Inyo County, California. Licensed by the Federal Energy Regulatory Commission, the project infrastructure comprises five power plants, four diversions, eight dams, seventeen stream gages, and three primary storage reservoirs including South Lake, Lake Sabrina, and Longley Lake. The proposed relicensing is intended for a presumed 50-year term and includes a Clean Water Act 401 water quality certification. The project scope incorporates several operational and environmental updates, including the re-operation of the Green Creek Diversion, boundary updates, and the implementation of comprehensive management plans for water, sediment, fish stocking, wildlife, botanical resources, invasive species, recreation, and historic properties. The State Water Resources Control Board is overseeing the process, which includes the preparation of an Environmental Impact Report to evaluate the project's impact. This presolicitation effort was formally announced on September 23, 2026, with performance centered in Bishop, California.

General Info

Southern California Edison seeks 50-year relicensing for Bishop Creek Hydroelectric Project in California.

Agency

California → State Water Resources Control Board

Place of Performance

Hwy 168 and South Lake Road, Bishop, CA, 93514

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → State Water Resources Control Board
Contacts2 people available
OfficeN/A

Full Description

Show more
Southern California Edison Company (SCE) owns and operates the Bishop Creek Hydroelectric Project (Hydroelectric Project), which is licensed by the Federal Energy Regulatory Commission (FERC). The Hydroelectric Project consists of: (1) five hydroelectric power plants (Power Plants 2-6) on Middle Fork Bishop Creek and Bishop Creek; (2) four diversions (Green Creek, South Fork, McGee Creek, and Birch Creek); (3) eight dams, some with associated flowlines, that divert water from South Fork Bishop Creek, Middle Fork Bishop Creek, Bishop Creek, Green Creek, Birch Creek, and McGee Creek to Hydroelectric Project facilities on Middle Fork Bishop Creek and Bishop Creek; (4) 17 stream gages; and (5) three primary storage reservoirs (South Lake, Lake Sabrina, and Longley Lake). The Proposed Project involves the relicensing (continued operation) of the existing Hydroelectric Project for a presumed 50-year term with proposed changes including re-operation of the Green Creek Diversion, boundary updates, a water management measure, sediment management plan, fish stocking plan, wildlife resources management plan, botanical resources management plan, invasive species management plan, recreation resources management plan, and a historic properties management plan.

Similar Contracts

Same NAICS industry code

NAICS: 221111
SLED
Bucks Creek Hydroelectric Project (FERC Project No. 619)
Solicitation # 2019069104
Pacific Gas and Electric Company is seeking water quality certification for the Bucks and Grizzly Creek Gravel Augmentation Project in Plumas County, California. This initiative implements the Gravel Augmentation Plan required by Condition 14 of the Bucks Creek Hydroelectric Project certification to enhance trout spawning habitats and populations. The project involves placing gravel at two specific sites: one on Bucks Creek approximately 0.3 miles downstream of the Lower Bucks Dam Spillway, and another on Grizzly Creek about 400 feet downstream of the gaging weir. To facilitate these activities, the company is pursuing Clean Water Act Section 404 permitting under the United States Army Corps of Engineers Regional General Permit 16 for aquatic habitat restoration and enhancement. The project is governed by the California Environmental Quality Act, with a CEQA Supplement prepared to ensure environmental compliance. Notices of Determination filed by the State Water Resources Control Board confirm that the project will not have a significant environmental effect, and no mitigation measures or monitoring plans were adopted. Administrative oversight involves the State Water Resources Control Board Division of Water Rights, with the project identified under solicitation number 2019069104. Performance is centered in Plumas County, specifically near Quincy, California.
City of Santa Clara

POSTED

2 months ago

DEADLINE

N/A
View Details
NAICS: 221111
SBIR / STTR
Energy Technologies
Solicitation # NSF 26-510
The National Science Foundation issued solicitation NSF 26-510 on May 22, 2026, for the Small Business Innovation Research and Small Business Technology Transfer Phase I, Phase II, and Fast-Track programs. This SBA set-aside opportunity focuses on developing deep technologies to advance U.S. competitiveness and security, specifically within the Energy Technologies topic. The program seeks proposals covering new energy sources, power generation, energy storage, electronic systems for mobile and off-grid applications, carbon conversion, and disruptive technologies in conventional resources. It also encourages research into the intersection of energy technologies and data, as well as nature-inspired processes for sustainable energy and carbon storage. The total anticipated funding for the program is 210 million dollars, with individual award limits varying by phase: up to 305,000 dollars for Phase I, up to 1.25 million dollars for Phase II, and up to 1.55 million dollars for Fast-Track. Strategic Breakthrough proposals may request up to 30 million dollars. Proposals are evaluated based on intellectual merit, broader impacts, and commercial potential. The Principal Investigator must be primarily employed by the small business, defined as at least 51 percent employment, and must meet specific minimum effort levels depending on the phase of the award. Submission deadlines began on July 27, 2026, and continue through July 2027.
National Science Foundation

POSTED

6 months ago

DEADLINE

in 8 months
View Details
NAICS: 221111
SLED
Temporary Phase Breaker, Poles, Related Materials and Installation
Solicitation # 13145
The City of Los Angeles Harbor Department is soliciting a contractor to provide temporary power for the Cabrillo Beach Youth Aquatic Center located in San Pedro, California. The scope of work involves installing a 200a 480V 3 Phase breaker in an existing panel, replacing a 125a breaker, and installing 200a rated flex to carry the circuit overhead. Key deliverables include the installation of approximately twenty-nine 35ft poles, a 150KVA step-down transformer to provide 3 phase 120/208 power, and three 400A 120/208V 3 Phase CAM Type outlets. The contractor is responsible for obtaining all necessary LADBS permits and ensuring all work complies with OSHA, CAL-OSHA, and Los Angeles Department of Building and Safety requirements. Work must commence within 30 days of a fully executed Purchase Order, with installation completed within 60 days. The anticipated rental period is two years, with a total project duration of 730 days from commencement. Payment terms are NET 30 days, though billing discount terms of 20 days or more will be considered during evaluation. Bidders must attend a mandatory Pre-Bid Conference and Job Walk to be eligible. Required submission documents include an Acknowledgement of Insurance Requirement and a Job Specification Worksheet. Labor costs must include certified Department of Industrial Relations payroll reporting and prevailing wages. There is no specified set-aside status for this solicitation.
Harbor Department, Port of Los Angeles

POSTED

6 months ago

DEADLINE

N/A
View Details

Research this forecast and prepare for the solicitation

Every solicitation package arrives shredded into a compliance breakdown and matched to your past performance, with incumbent history and alerts on amendments and award.

Miguel
Hillary
Keith Deutsch
Christine

Join 900+ contractors already using CLEATUS