This Solicitation opportunity from Nebraska was posted on June 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.
OPW 54689: 144th Street and West Maple Creek Culvert Outfall
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
Active Opportunities Like This One
AI Contract Overview
This contract involves a comprehensive project for the City of Omaha that encompasses stream rehabilitation, storm sewer outfall repair, and pond dredging. The scope includes raising the stream bed through bank grading and vegetative measures, rebuilding storm sewer pipes and stabilizing outfall areas, and removing accumulated sediment from an existing pond for offsite disposal. The anticipated start date is August 19, 2025, with bids evaluated under a Small Emerging Business (SEB) reserve, requiring bidders to meet specific participation and compliance standards. The project mandates submission of an Economic Equity and Inclusion Plan, and offers incentives for apprentice utilization, with forms provided to attest to compliance and participation commitments. Bidders must submit a bid bond issued by a Nebraska-licensed surety or acceptable substitutes such as certified checks or U.S. government bonds, with original documentation due within seven days of bid closing. The procurement process emphasizes adherence to various compliance requirements, including Nebraska statutory representations, employee classification attestations, and responsible contractor responsibilities, including ADA considerations. Additional documentation includes participation disclosure forms, apprenticeship incentive forms, and detailed bid submittal forms for different entity types. The project is managed by the Nebraska agency of Douglas County, with a response deadline of June 25, 2025, and detailed instructions for questions and submission procedures. Overall, the contract emphasizes fair participation, compliance with labor and diversity standards, and thorough documentation to ensure responsible and equitable project execution.
General Info
Place of Performance
NE, USASet-Aside
Timeline
Submission Closed
Organization & Contact Information
Full Description
SCOPE: This project involves three primary elements: Stream rehabilitation, storm sewer outfall repair, and pond dredging. The stream rehabilitation includes raising the stream bed with bank grading and shaping as well as in-channel grade control and vegetative measures. The storm sewer outfall repair includes rebuilding of storm sewer pipe and stabilization of outfall areas. The pond dredging includes removal of accumulated sediment in an existing pond and hauling sediment offsite for disposal.
Anticipated Notice to Proceed date: Tuesday, 8/19/2025
This bid has an SEB reserve. More information can be found in the Attachments tab in the specifications/project manual. Non-registered SEB bidders are invited to submit bids, but non-SEB authorized bids will only be considered in the event that the City fails to receive bids from SEB authorized bidders. In the event that the City receives a bid from an SEB authorized bidder all non-SEB authorized bids shall be automatically rejected for failing to meet the SEB reserve requirements set forth in the bid specifications, and the SEB authorized bids received will be evaluated for possible contract award.
Q1: How can I find out more about certification with the City of Omaha Small & Emerging Small Business Program?
A1: More information is on Omaha Human Rights & Relations Department's website: https://humanrights.cityofomaha.org/economic-development/small-and-emerging-small-business-seb
This project requires submission of an Economic Equity and Inclusion Plan (EEIP).
This project qualifies for Apprentice utilization. Contractor should attach Apprenticeship Incentive Form (AIF) with their bid submission to utilize this provision.
There are Reference Materials (1) associated with this project. Please go to the Attachments tab to download the Geotechnical Exploration Letter.
Requirement for Bid Bond: The surety company issuing the bid bond should be licensed by the State of Nebraska and listed on the current edition of Circular 570 of the United States Department of the Treasury. Acceptable substitutes for a bid bond: a certified check, an official bank check, a cashier's checks drawn on a national bank or a bank chartered under the laws of the state, payable to City of Omaha, or lawful money of the United States, or a United States Government Bond (negotiable). LETTERS OF CREDIT ARE NOT AN ACCEPTABLE SUBSTITUTE FOR A BID BOND AND WOULD BE CAUSE FOR REJECTION OF BID.
The bid bond amount is listed in the Attributes section.
A copy of the bid bond/acceptable substitute shall be uploaded in the Response Attachments section. The original document must be received by the City Clerk, 1819 Farnam Street LC-1, Omaha-Douglas Civic Center, Omaha, NE 68183 within seven (7) calendar days of the closing date and time indicated.
QUESTIONS: Bidders must submit bid questions in the Questions tab of the bid event. Questions will be answered within one (1) day of the questions cutoff date/time.
Earlier notices in this NAICS code
Posted before this notice, open and closed
Find Active Opportunities Like This
Get AI-powered intelligence on the opportunities still open
Every page of the solicitation package shredded into a compliance breakdown
AI-powered matching based on your capabilities and past performance
Competitor and incumbent history on the requirement
Automated alerts on amendments, Q&A deadlines, and award
Join 750+ contractors already using CLEATUS
