Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Nebraska was posted on January 3, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

OPW 54717: 2024 ADA Concrete Curb Ramp Construction, Various Locations within the City of Omaha

Closed
CI-2023-0200State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 236220
New
SLED
Building 262 Renovations FLETC Glynco
Solicitation # 70LGLY27RSSB00001
Solicitation 70LGLY27RSSB00001 is a total small business set-aside for a single firm fixed price contract to perform comprehensive interior renovations of Building 262 at the Federal Law Enforcement Training Center in Glynco, Georgia. The scope of work includes replacing corridor and classroom flooring with LVP and carpet tiles, fully remodeling restrooms, updating doors and life-safety components, and repainting interior surfaces. Technical upgrades involve installing raised flooring with integrated electrical distribution for classrooms, replacing variable air volume systems, and updating lighting controls and plumbing. The project is scheduled for a period of performance from January 11, 2027, to March 11, 2028, with a total duration of 425 calendar days after the notice to proceed. The procurement is managed by the Department of Homeland Security, with proposals due by November 18, 2026. Award evaluation is based on three factors of equal importance: past performance, corporate relevant experience, and price. Successful offerors must provide payment and performance bonds, as well as a bid guarantee of 20 percent of the bid price or 3 million dollars. Strict security protocols are in place, requiring background checks, FBI fingerprinting, and adherence to DHS non-disclosure agreements for personnel. All work must comply with ADA accessibility guidelines and prevailing wage determinations for the Georgia region.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 8 days
NAICS: 236220
New
SLED
Repair Auto Maintenance Bldg 575
Solicitation # N40085-27-R-9000
Solicitation N40085-27-R-9000 is a project to repair and modernize the Auto Maintenance Facility, Building 575, at Marine Corps Base Camp Lejeune, North Carolina. The comprehensive scope of work includes selective demolition, building envelope and roofing repairs, exterior wall systems, interior reconfiguration, and new finishes. Technical upgrades encompass new HVAC systems, exhaust extraction, compressed air systems, a full NFPA-compliant fire suppression system, updated electrical distribution, lighting, low-voltage systems, and building automation controls. Additionally, the project requires hazardous materials abatement and site improvements, including paving, drainage upgrades, and repairs to water, sanitary, and storm systems. The contract has an estimated value between 10 million and 25 million dollars with a performance period of 730 days after award. Award will be based on the lowest price for two primary exhibit line items: building renovation and paving removal and replacement. Proposals are due by November 23, 2026. Bonding requirements are tiered, with proposals of 150,000 dollars or more requiring bid, payment, and performance bonds. The project is subject to the Davis-Bacon Act, the Buy American Act, and ADA accessibility guidelines. Quality control will be managed through a three-phase system, and final acceptance requires a series of inspections, including functional operating tests for exhaust systems and potential destructive testing for firestopping.
Bristol Alliance of Companies

POSTED

about 2 hours ago

DEADLINE

in 13 days
NAICS: 236220
New
P084 NEXT GENERATION TORPEDO INTEGRATION LAB & P1016 Consolidated RDT&E Systems Facility – Newport, RI
Solicitation # p084-next-generation-torpedo-integration-lab-p1016-consolidated-rdte-systems-facility-newport-ri
J&J Contractors, Inc. is soliciting bids for the construction of the Next Generation Torpedo Integration Lab and the P1016 Consolidated RDT&E Systems Facility in Newport, Rhode Island. The project involves the creation of a 12,920 square foot multi-story steel frame laboratory and office facility featuring a shallow foundation, metal standing seam roof, and masonry and metal panel exterior walls. Comprehensive site improvements are required, including landscaping, parking, exterior lighting, telecommunications, and an underground stormwater retention system. An additional option includes the construction of a 17,978 square foot laboratory facility and the demolition of Building 1272T, a 548 square meter engineering facility. Pricing is requested across a wide range of scopes, including demolition, abatement, concrete, masonry, structural steel, mechanical, electrical, plumbing, and crane services. This is an SBA set-aside solicitation for small businesses and other designated disadvantaged business entities. All work must adhere to Davis Bacon Wage Rates and is exempt from sales tax. Interested parties must contact Rahul Maheshwari to receive the formal bid invitation and documents via Building Connected before the response deadline of November 30, 2026.
J&J CONTRACTORS, INC.

POSTED

about 2 hours ago

DEADLINE

in 19 days
NAICS: 236220
New
Water Damage Restoration
Solicitation # G26-005
Solicitation G26-005 is for a single lump sum contract to perform multi-floor water damage restoration in Building 17 at the Grafton Job Corps Center in North Grafton, Massachusetts. Operated by Adams and Associates, Inc. for the U.S. Department of Labor, the project follows a fire sprinkler discharge that affected the first, second, and third floors. The scope of work includes architectural repairs such as drywall replacement and painting, ceiling tile and drywall ceiling repair, flooring replacement with rubber wall base installation, electrical repairs, and the replacement of vanities and cabinets. All work must comply with NFPA-101 Life Safety Code, ADA, OSHA, and EPA regulations, as well as local Massachusetts building codes. The total period of performance is 105 days, consisting of 90 days for substantial completion and 15 days for final completion. Award will be based on best value, with evaluation weighted toward price (60 points), quality (20 points), past performance (10 points), and schedule (10 points). Bidders must attend a mandatory site visit and provide a detailed cost breakdown, a 90-day bid guarantee, and proof of a valid Massachusetts Contractor's License. The contract is subject to the Davis-Bacon Act and specific federal wage and sick leave requirements, including a minimum wage of 13.65 per hour for covered workers. Payment terms are Net 30.
Grafton Job Corps

POSTED

about 2 hours ago

DEADLINE

in 6 days
NAICS: 236220
New
Springdale JCC –Dormitory Interior Renovation & Repairs
Solicitation # springdale-jcc-dormitory-interior-renovation-repairs
Career Systems Development Corporation, operating for the U.S. Department of Labor, is soliciting proposals for the interior renovation and repair of the North Wing dormitory at the Springdale Job Corps Center in Troutdale, Oregon. The project focuses on restoring water-damaged areas to safe residential use, specifically targeting sixteen residential rooms and bathrooms, as well as common areas and mechanical rooms. The scope of work includes drywall installation, joint finishing, and painting for approximately 300 square feet of floor area in mechanical rooms, along with the temporary disconnection and re-installation of HVAC equipment, furnaces, and water heaters. The contractor is responsible for all labor, materials, equipment, and supervision, ensuring the protection of the occupied building and the testing of all restored mechanical, plumbing, electrical, and life-safety systems. This solicitation is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certified firms. Proposals must include detailed relevant experience, a comprehensive work plan addressing phasing and safety, and itemized pricing by room and trade. The project is subject to the Davis Bacon Act under wage determination OR20260100, requiring the submission of weekly certified payrolls. Awarded contractors must provide payment and performance bonding for the full project value, as well as proof of general liability and worker's compensation insurance, within ten days of award. A minimum one-year workmanship warranty is required upon final acceptance by CSD.
Career Systems Development Corporation

POSTED

about 2 hours ago

DEADLINE

in 9 days

AI Contract Overview

Show more

The City of Omaha is seeking qualified contractors to perform ADA curb ramp construction, curb repairs, and curb inlet top replacements at various locations within the city, with an anticipated start date of April 1, 2024. The project emphasizes accessibility improvements and requires bidders to submit an Economic Equity and Inclusion Plan, along with an Apprenticeship Incentive Form if they intend to utilize apprenticeship provisions. Bidders must provide a bid bond or acceptable substitutes such as certified checks or U.S. Government Bonds, with the original bond due within seven days of bid closing. The contract mandates a minimum of one dedicated crew for the duration of the project, and bidders are required to submit detailed experience, staffing, and equipment information through a designated form. The project is managed by Douglas County, Nebraska, and is classified under NAICS code 236220, indicating a construction-related scope. The solicitation details include a response deadline of January 24, 2024, and specify that the successful contractor will need to adhere to procurement policies, including submitting all required documentation via the designated online platform. The project does not include a Small or Disadvantaged Business reserve, but it emphasizes compliance with local and state procurement standards. The contract aims to enhance pedestrian accessibility and safety through targeted curb improvements across various city locations, with all work governed by the specifications outlined in the project manual. Additional related procurement documents include requests for recycling processing services, road construction bids, specialized equipment procurement, and cooperative grocery purchasing, illustrating a broad scope of municipal contracting activities.

General Info

Documents

11
XLSX, High priority: read this firstbid-submittal
High
PDF, High priority: read this firstrfb
High
PDF, High priority: read this firsteeip-plan-template
High
XLSX, High priority: read this firstparticipation-disclosure
High
XLSX, High priority: read this firstcompliance-form
High
PDF, High priority: read this firstaffidavit
High
DOCX, High priority: read this firstexperience-staffing-equipment-form
High
PDF, High priority: read this firstifb
High
XLSX, High priority: read this firstbid-bond
High
XLSX, Low priorityother
Low
XLSX, Low prioritycertificate-of-compliance
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyNebraska → Douglas County
ContactsNo contacts available
OfficeN/A
Organization / AgencyNebraska → Douglas County
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
OPW 54717: 2024 ADA Concrete Curb Ramp Construction, Various Locations within the City of Omaha:  City of Omaha is requesting bids from qualified companies, herein called Bidder, Contractor, Vendor, Supplier, or other pronouns used in their place, for all work and/or goods set forth in the specifications.  
SCOPE:  This project consists of ADA curb ramp construction, miscellaneous curb repair, and curb inlet top replacement.  
Anticipated Notice to Proceed date:  Monday, April 1, 2024   This project requires submission of an Economic Equity and Inclusion Plan (EEIP).
This project qualifies for Apprentice utilization.  Contractor should attach Apprenticeship Incentive Form (AIF) with their bid submission to utilize this provision.
This bid does not have an SEB reserve. More information can be found in the Attachments tab in the specifications/project manual.
Successful bidders selected to perform work for this contract shall commit a minimum of one (1) crew for the duration of this contract. A subcontractor working for the successful bidder cannot be designated as the one (1) crew commitment for the duration of this contract. Bidders must fill out and submit Exhibit "G" - Experience, Staffing, and Equipment Form.
Requirement for Bid Bond:  The surety company issuing the bid bond should be licensed by the State of Nebraska and listed on the current edition of Circular 570 of the United States Department of the Treasury.  Acceptable substitutes for a bid bond: a certified check, an official bank check, a cashier's checks drawn on a national bank or a bank chartered under the laws of the state, payable to City of Omaha, or lawful money of the United States, or a United States Government Bond (negotiable).  LETTERS OF CREDIT ARE NOT AN ACCEPTABLE SUBSTITUTE FOR A BID BOND AND WOULD BE CAUSE FOR REJECTION OF BID.   The bid bond amount is listed in the Attributes section.
A copy of the bid bond/acceptable substitute shall be uploaded in the Response Attachments section.  The original document must be received by the City Clerk, 1819 Farnam Street LC-1, Omaha-Douglas Civic Center, Omaha, NE 68183 within seven (7) calendar days of the closing date and time indicated.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS