Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 30 at 2:00 PM EDT

Register Free →

Order- SBD 1T840 -Cima Road Overcrossing Bridge Repair

Active
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Director's Order project SBD 1T840 involves the repair and maintenance of the Cima Road overcrossing bridge, identified as Bridge No. 54-0363, located on Interstate 15 at postmile R162.73 in San Bernardino County, California. Managed by Caltrans District 8, the scope of work includes heat-strengthening a damaged girder, asphalt concrete paving, patching damaged concrete, removing existing paint, and repainting bridge components. The project also requires the implementation of traffic control to ensure safety during construction. All activities will be performed within Caltrans Right-of-Way and are restricted to existing pavements or previously disturbed areas, with no proposed staging or storage areas outside existing limits and no identified utility relocations. The project is categorized as a forecast under NAICS code 237310 and is categorically exempt under CEQA Guidelines Section 15301, Class 1(d) for existing facilities, as it involves maintenance without the expansion of use. Gita Tokhmafshan serves as the primary point of contact for the agency.

General Info

Repair Cima Road overcrossing on I-15 per Caltrans standards, no new staging or utility relocations.

Agency

California → Caltrans, District 8 - San Bernardino/Riverside

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

State Route 15 (SR-15) In County of San Bernardino, at Cima Rd Overcrossing, CA

Set-Aside

NONE

Documents

(1)

Notice of Exemption - Cima Road Overcrossing Bridge Repair

PDFnotice-of-exemption

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

Posted

forecast

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → Caltrans, District 8 - San Bernardino/Riverside
Contacts1 person available
OfficeN/A
Organization / Agency
California → Caltrans, District 8 - San Bernardino/Riverside
Office AddressN/A
Contacts
Gita TokhmafshanSenior Environmental Planner

Full Description

Show more
The proposed Director’s Order (DO) project involves repairs to the Cima Road overcrossing bridge (Bridge No. 54-0363) on Interstate 15 (I-15) at postmile R162.73 in San Bernardino County, California. The work includes heat-strengthening the damaged girder, asphalt concrete (AC) paving, patching damaged concrete, implementing traffic control, removing existing paint, and repainting bridge components. No staging or storage areas are proposed outside the existing disturbed project limits, and no utility relocations have been identified. All construction activities will occur on existing pavements or previously disturbed areas. All work will take place in Caltrans Right-of-Way.

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
SLED
Citywide Slurry Seal Project (Cycle 1)
Solicitation # 26-03
The Citywide Slurry Seal Project (Cycle 1), identified as Capital Improvement Project No. 26-03, is a solicitation by the City of Downey, California, for the maintenance and improvement of various residential streets. The scope of work includes pavement surface preparation, crack sealing, the application of emulsified Type II slurry seal coat, and the construction of a 2-inch thick Asphalt-Rubber Hot Mix (ARHM-GG) pavement overlay. Additionally, the contractor is responsible for replacing traffic striping, pavement markings, and raised pavement markers, as well as implementing necessary traffic control. The project requires the contractor to furnish all labor, materials, and equipment, with a specific requirement to sweep all slurry sealed streets five to seven calendar days after application to remove loose aggregate. The contract will be awarded to the lowest responsible bidder who meets all technical specifications and provides a responsive proposal. Bidders must submit a bid bond of at least 10 percent of the bid amount and provide performance and payment bonds totaling 100 percent of the contract price upon award. Compliance with the California Labor Code regarding prevailing wages is mandatory, and the contractor must maintain workers' compensation and public liability insurance. The project includes a one-year warranty on all materials and workmanship. Final acceptance of the work is conducted by the City Council following an inspection and recommendation by the City Engineer.
City of Downey

POSTED

about 8 hours ago

DEADLINE

in 3 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS