Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on June 26, 2024. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Otay Reed Wetland Mitigation Project

Closed
K-24-2219-DBB-3State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541620
New
SLED
Purchase of Stream Mitigation Credits for Lightridge Park, RFQ 719029
Solicitation # RFQ 719029
Loudoun County, Virginia, is soliciting bids under RFQ 719029 for the purchase of an estimated 450 stream mitigation credits to provide compensatory mitigation for stream impacts associated with the construction of Lightridge Park. To be eligible, bidders must be owners or authorized representatives of mitigation banks approved by the U.S. Army Corps of Engineers (USACE) and the Virginia Department of Environmental Quality (DEQ). Credits must be calculated using the Unified Stream Methodology (USM) or Stream Condition Units (SCUs) and must be released and available for sale at the time of bid opening. Furthermore, the bank's approved service area must include the Upper Bull Run watershed, specifically Hydrologic Unit Code (HUC) 020700100701. The final quantity of credits will be determined by the requirements of USACE State Program General Permit No. NAO-2026-01685 and DEQ Virginia Water Protection Permit No. WP4-26-1792. The contract will be awarded to the lowest responsive and responsible bidders based on unit cost, with the County reserving the right to award multiple contracts if a single bidder cannot provide the full quantity of credits. Bids must be submitted by December 15, 2026, and must include a W-9 form and Proof of Authority to Transact Business in Virginia. Required submissions include one physical hard copy and one electronic PDF copy on a USB flash drive. Upon award, the contractor must provide a written letter of credit availability and an executed purchase agreement within seven calendar days of the purchase order, followed by a Bill of Sale and verification of conveyance to USACE and DEQ within ten calendar days of payment.
Loudoun County

POSTED

1 day ago

DEADLINE

in about 1 month

AI Contract Overview

Show more

The Otay Reed Mitigation Project aims to compensate for past and future stormwater channel maintenance impacts within the Otay Valley Regional Park in California. Covering 6.48 acres on City-owned parcels, the project involves restoring wetland habitats, upland scrub areas, and establishing a weed-free buffer around the site. Implementation includes soil excavation, grading to match adjacent wetlands, invasive species removal, and planting native species characteristic of southern willow scrub, mule fat scrub, alkali marsh, and maritime succulent scrub. The work will be confined to designated areas, with a schedule that includes an installation phase followed by a 120-day plant establishment maintenance period. The project also requires soil testing for contamination, erosion control measures, temporary irrigation, hydroseeding, and ongoing weed management to ensure successful habitat restoration. Contractor responsibilities encompass demarcating work limits, identifying buried utilities, executing earthwork activities, developing a Water Pollution Control Plan, installing erosion BMPs, and maintaining plantings through watering and weed control during the establishment period. Large non-native trees that are difficult to remove may be killed in place and left on site. Soil testing will determine if contaminated soils need removal, and all work must adhere to environmental guidelines and best practices. The project is set within a framework of a five-year monitoring period, which is managed under a separate contract. The contract size ranges from $500,000 to $1.5 million, with responses due by July 31, 2024, and primary contact being Abel Martinez.

General Info

Place of Performance

CA, USA

Set-Aside

NONE

Documents

4
PDF, High priority: read this firstifb
High
PDF, High priority: read this firstspecifications
High
PDF, Low priorityother
Low
PDF, Low prioritycertified-vendor-list
Low

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia → City of San Diego
Contacts1 person available
OfficeN/A

Full Description

Show more
The Otay Reed Mitigation Project (Project) was designed to provide compensatory mitigation for past City of San Diego (City) Stormwater Department (SWD) channel maintenance impacts and to also provide Advanced Permittee Responsible Mitigation (APRM) for future stormwater channel maintenance projects identified in the City's Municipal Waterways Maintenance Plan and associated Final Environmental Impact Report (MWMP; Dudek 2020). The Project encompasses 6.48 acres and is located on two City-owned parcels (Assessor Parcel Numbers 62407026 and 62407022) within the Otay Valley Regional Park (OVRP) and is within the City's Multiple Species Conservation Program's (MSCP; City 1997) Multi-Habitat Planning Area (MHPA). The 6.48-acre Project area is composed of 5.04 acres of wetland habitat mitigation areas, 0.17 acre of an upland mitigation area, 1.21 acres of a weed free buffer area, a 0.01-acre SDG&E utility pole guy wire access area, and a 0.07-acre staging area (including 0.02-acre overlap with the proposed weed free buffer area).Implementation will involve soil excavation (and removal) and grading to lower the elevation to that of the adjacent wetland habitat along the northern and southern banks of the Otay River, treatment and removal of invasive species, and installation of native container plants and seed. Plant species characteristic of southern willow scrub, mule fat scrub, and cismontane alkali marsh will be installed within the riverbed and adjacent wetland establishment/re-establishment and rehabilitation areas. Upland scrub plant species characteristic of maritime succulent scrub will be installed on the upland slope that will be created by grading activities for the wetland establishment/re-establishment portion of the site. In addition, a weed-free buffer of 50 feet will be maintained around the Otay Reed mitigation site (only on City-owned property). All work shall be conducted within the designated mitigation site and staging area at locations identified on the Construction Documents. The work schedule is defined by an installation phase and a post-construction 120-day plant establishment maintenance period (Project contract period). The 5-year maintenance and monitoring period described in the Project's Habitat Mitigation and Monitoring Plan (HMMP; August 2023) will be completed under a separate contract and is nota part of this Project contract period.Contractor services required of this scope of work include demarcation of work limits; determining the location of any buried utilities prior to any earth disturbance; non-native plant (weed) removal (prior to or during grading) following current shot-hole borer guidelines provided by the University of California Agriculture and Natural Resources (UCANR; 2017 and2020); excavation and grading; development of a Water Pollution Control Plan (WPCP); installation and maintenance of erosion control best management practices (BMPs) per the requirements of the WPCP; installation of a temporary irrigation system, container plants and cuttings; and hydroseed application. Large non-native trees that are too difficult to removefrom the designated enhancement area (or may cause too much impact from felling and removal to native plants) may be killed in-place and left on site. Soils will be tested for potential contamination during grading. Any contaminated soils will be removed from the area and disposed of at an approved disposal facility to preserve public health. Upon completion of installation, the Contractor shall conduct the 120-day plant establishment maintenance period; provide watering (via temporary irrigation system supplied by a water truck) for plant material; conduct regular weed control within the mitigation site and buffer; and implementmaintenance measures (and remedial actions as needed) for the duration of the contract period to ensure specified plant survivorship and successful control of non-native plant species.

More opportunities from California → City of San Diego

Same awarding agency

NAICS: 237110
SLED
Pump Station 2 Improvements And Modernization
Solicitation # K-27-2502-DBB-3-C
The City of San Diego is soliciting bids for the Pump Station 2 Improvements and Modernization project, identified as solicitation K-27-2502-DBB-3-C. This phase-funded construction contract focuses on enhancing the station's reliability and operability through the replacement of eight pumps, six motor controllers, and associated instrumentation and monitoring systems. The scope of work includes the installation of Variable Frequency Drives and reduced voltage soft starters, rehabilitation of suction and discharge piping, and structural repairs to Wet Wells 1 and 2, influent channels, and discharge header systems. Additional requirements involve HVAC and ventilation upgrades, architectural modifications to the VFD room, and the repair of exterior building elements. The project must be completed within 1,452 working days, with construction activities for each phase commencing only upon receipt of a separate Notice to Proceed. The contract will be awarded to the lowest responsible and reliable bidder based on the base bid and any proposed alternates. Bidders must adhere to the 2024 editions of the Greenbook and the City of San Diego Whitebook, as well as Build America Buy America requirements and prevailing wage rates. The project is subject to a Project Labor Agreement and requires a drug-free workplace certification. Payment for major equipment is structured across six milestones, ranging from purchase order and fabrication to final performance verification. Awardees must provide payment and performance bonds, as well as insurance certificates, within ten working days of the Notice of Intent. Evaluation of the apparent low bidder includes a review of electronic bid documents, corporate existence evidence, and compliance with subcontractor listing requirements for any entity performing more than 0.5 percent of the total bid.
Water and Sewer Line and Related Structures Construction

POSTED

15 days ago

DEADLINE

in 26 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS