This Combined Synopsis/Solicitation opportunity from Department Of Defense was posted on February 4, 2022. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

OUT-OF-SERVICE EEMUA 159 OR API 653 INSPECTIONS OF ABOVEGROUND STORAGE TANKS AT THULE AB, GREENLAND

Closed
FA890322Q0001Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 541990
New
Federal
Water Resources Analytical and Professional Support Services - Multiple Award Task Order Contract (MATOC)
Solicitation # W912HQ27S0006
The US Army Corps of Engineers Mission Support Battalion is soliciting a Multiple Award Task Order Contract (MATOC) for Water Resources Analytical and Professional Support Services. This Indefinite Delivery Indefinite Quantity (IDIQ) contract is designed to provide the Institute for Water Resources (IWR) with technical research, analytical support, data management, facilitation, and training services that are not readily available within the agency. The contract has an anticipated maximum shared capacity of 49,500,000.00 dollars, with a period of performance consisting of one base year and four one-year option periods, plus a possible six-month extension. A partial small-business set-aside is anticipated based on specific tasks within the Performance Work Statement. The scope of work covers all Civil Works mission areas, including navigation, flood risk management, aquatic ecosystem restoration, hydropower, regulatory, recreation, and water supply. Key requirements include the development and maintenance of automated information systems, economic and socio-economic assessments, hydrologic and hydraulic engineering tools, and expertise in water security and integrated water resources management. The contract also involves support for dam and levee safety, conflict resolution, and financial analysis for public works infrastructure. Technical requirements include the provision of key personnel such as a Senior Project Integrator, IT Systems Engineer, and Cloud Systems Engineer, each with specific advanced degree and experience mandates. All deliverables must be provided with unlimited rights to the government, and the contractor is required to maintain a Task Delivery Order Quality Control Plan. Security requirements include a favorable National Agency Check for personnel accessing unclassified systems and adherence to DFARS 239.7602-2 regarding data storage within the United States. Submission requirements for the sources-sought phase include a completed questionnaire, a capabilities statement not exceeding 20 pages, and resumes for key personnel.
W4LD USA Hecsa

POSTED

about 4 hours ago

DEADLINE

in 17 days
NAICS: 541990
New
Federal
U.S. Embassy Mexico—International Narcotics & Law Enforcement Affairs (INL Mexico) CONOCER Criminal Analyst Certification Services
Solicitation # 19AQMM26Q0469
Solicitation 19AQMM26Q0469 is an unrestricted Indefinite Delivery Indefinite Quantity (IDIQ) procurement issued by the U.S. Embassy Mexico's International Narcotics and Law Enforcement Affairs (INL Mexico) office. The primary objective is to strengthen the capacity of Mexican state and federal crime analysts by providing certification services under the CONOCER Competency Standard, specifically targeting up to 850 analysts in Competency Standard 1599 to improve investigative quality and reduce impunity for high-impact crimes. The contract is structured as a Firm Fixed Price (FFP) agreement with a five-year ordering period running from December 1, 2026, to November 30, 2031. The scope of work includes evaluation services, the issuance of certifications, and associated travel and VAT reimbursements, with performance occurring at various locations across Mexico. To be eligible, the contractor must be formally registered as a CONOCER Evaluation and Certification Institution and assign qualified personnel, including a CONOCER Evaluator for the 1599 Competency Standard. Award will be based on a trade-off approach where technical factors—specifically key personnel, technical approach, relevant corporate experience, and past performance—are deemed more important than the evaluated price. The evaluation process focuses on the greatest value to the government rather than a numerical formula. Administrative requirements include electronic invoicing via the Invoice Processing Platform (IPP) and adherence to strict submission guidelines, with the final response deadline set for November 1, 2026.
Acquisitions - Aqm Momentum

POSTED

1 day ago

DEADLINE

in 17 days
NAICS: 541990
New
Federal
Maintenance Service for Portable Fire Extinguishers - BPA
Solicitation # 2031ZA27Q00004
Solicitation 2031ZA27Q00004 is a request for quotations for a single-award, firm fixed-price Blanket Purchase Agreement (BPA) to provide portable fire extinguisher maintenance services for the Bureau of Engraving and Printing (BEP) DC Facility. The contract is a total small business set-aside under NAICS 541990. The period of performance is five years, spanning from December 1, 2026, through November 30, 2031. The scope involves the inspection, maintenance, testing, repair, and replacement of approximately 1,000 portable fire extinguishers across the BEP main and annex buildings in Washington, D.C. Services will be managed through annual BPA calls for inspections and as-needed calls for specific repairs or replacements. The contractor must be ICC/NAFED certified and adhere to NFPA-10 and OSHA 29 CFR Part 1910 standards. Key technical requirements include six-year teardowns, hydrostatic testing at five or twelve-year intervals, and the provision of metal valve replacement extinguishers. An annual equipment report is required within 48 hours of service completion. Award will be granted to the lowest-priced, technically acceptable offer with no adverse past performance. Evaluation is based on the completeness of the technical approach and the level of risk associated with the proposal. Offerors must submit their quotes in two volumes: a technical capability volume and a pricing volume using the provided pricing sheet. Submissions must be made by October 30, 2026. The contractor is required to maintain worker's compensation, general liability, and automobile liability insurance. All payment requests must be processed electronically through the Invoice Processing Platform (IPP).
Office Of The Chief Procurement Officer

POSTED

1 day ago

DEADLINE

in 10 days

General Info

Contract Value

$3,169,085

NAICS

541990 - All Other Professional, Scientific, and Technical Services

Place of Performance

Thule, Air Base, TX, GRL

Set-Aside

NONE

Award Issued Date

Documents

16

App+G+Attachment+10+Vectrus+Food+Support++Worksheet.xlsx

XLSX

App+G+Attachment+11+Quarantine+price+quote-Example+-+8+Jan+21.pdf

PDF

App+G+Attachment+12+Shipping+Air+Cargo+to+Thule+AB+through+McGuire+AFB.pdf

PDF

App+G+Attachment+1+Tank+18+API+653+Rprt_2008.pdf

PDF

App+G+Attachment+2+Tank+23+API+653+Rprt_2008.pdf

PDF

App+G+Attachment+3+Tank+27+API+653+Rprt_2008.pdf

PDF

App+G+Attachment+4+Tank+28+API+653+Rprt_2008.pdf

PDF

App+G+Attachment+5+Thule+AB+COVID-19+Travel+Policy+Update+4+%2816+Feb+21%29_FINAL.pdf

PDF

App+G+Attachment+6+Memo+for+821+ABG.docx

DOCX

App+G+Attachment+7+Thule+Traveler+Guide.xlsx

XLSX

App+G+Attachment+8+Vectrus+Service+Agreement+Example.pdf

PDF

App+G+Attachment+9+Vectrus+Services+Price+List.pdf

PDF

Atch+3+-+FA890321R0027+Table+of+Deliverables+9+Jan+22+revised.pdf

PDF

FA890321Q0001+Atch+1+-+Revised+PWS+19+Jan+22.pdf

PDF

FA890322Q0001+Atch+2+-+Revised+PPS+1+FEB+22.xlsx

XLSX

FA890322Q0001+Combined+Synopsis++Solicitation.pdf

PDF

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

4 updates
PhaseClosed
Posted

Combined Synopsis

Notice updated

The notice description changed.

Deadline changed

Response deadline changed from Jan 28, 2022 to Feb 11, 2022.

Notice updated

Response deadline changed from Feb 11, 2022 to Feb 17, 2022. The notice title changed. The notice description changed.

Notice updated

The notice description changed.

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → FA8903 772 Ess Pk
Contacts2 people available
OfficeJBSA LACKLAND, TX, 78236-9861, USA
Office AddressJBSA LACKLAND, TX, 78236-9861, USA
Contacts

Full Description

Show more
Amendment Two (2) This notice constitutes AMENDMENT TWO. The following information is incorporated into this solicitation: PROPOSAL DUE DATE AND TIME: The due date for proposal submission is 16 February 2022 at 6:00 PM, Central Time, USA. This due date and time supersedes any other documents that indicate a due date/time. CONTRACT COMPLETION DATE AND OPTION ITEMS: The contract completion date for the base items, CLINS 0001 through 0004 is 31 Dec 2022. While this is the formal completion date, on-site inspection services must be coordinated with AFCEC and the Thule AB Base Maintenance Contractor and be completed by 30 June 2022, prior to the arrival of the annual supply barge in July of 2022. All deliverables must be completed in accordance with the timelines specified in the PWS and Table of Deliverables. Option CLINS 0005 through 0008, if exercised, will be exercised concurrently and PRIOR TO 31 DEC 2022, and will extend the contract completion date through 31 DEC 2023. Onsite inspection services for these CLINS must be completed by 30 June 2023, prior to the arrival of the annual supply barge in July of 2023. All deliverables must be completed in accordance with the timelines specified in the PWS and Table of Deliverables. Option CLINS 0009 through 0012, if exercised, will be exercised concurrently and PRIOR TO 31 DEC 2023, and will extend the contract completion date through 30 SEP 2024 Onsite inspection services for these CLINS must be completed by 30 June 2024, prior to the arrival of the annual supply barge in July of 2024. All deliverables must be completed in accordance with the timelines specified in the PWS and Table of Deliverables. FAR 52.217-7 is changed as follows, and supersedes any other references to FAR 52.217-7: FROM: Option for Increased Quantity-Separately Priced Line Item (Mar 1989) The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise the option by written notice to the Contractor within 15 days of delivery date. Delivery of added items shall continue at the same rate that like items are called for under the contract, unless the parties otherwise agree. TO: Option for Increased Quantity-Separately Priced Line Item (Mar 1989) The Government may require the delivery of the numbered line item, identified in the Schedule as an option item, in the quantity and at the price stated in the Schedule. The Contracting Officer may exercise Option Items 0005 through 0008 CONCURRENTLY, by written notice to the Contractor no later than 31 DEC 2022. The Contracting Officer may exercise Option Items 0009 through 0012 CONCURRENTLY, by written notice to the Contractor no later than 31 DEC 2023. Delivery of added items shall be in accordance with the completion dates stated in the solicitation and resultant award, unless the parties otherwise agree. FAR 52.232-18 Availability of Funds is not applicable to this solicitation and is therefore removed. It will not be included in the resultant award. The current, applicable Performance Work Statement (PWS) for this acquisition is dated 19 January 2022, was posted with Amendment 01, and supersedes any reference to other PWS dates. The current, applicable Table of Deliverables (ToD) for this acquisition is dated 9 January 2022, was posted with Amendment 01, and supersedes any reference to other ToD dates. Any reference to API 653 reports in the ToD shall be construed as API 653 or EEMUA 159. The current, applicable Price Proposal Summary (PPS) for this acquisition has a file name dated 01 February 2022, was posted with Amendment 01, and supersedes any reference to other PPS dates, to include the date shown within that document. Any reference to API 653 in the PPS shall be construed as API 653 or EEMUA 159. The contractor must acknowledge all amendments on the cover page of its proposal. All other terms and conditions of this solicitation remain the same. Amendment One (1) -adds the Combined Synopsis and Solicitation narrative -corrects an administrative error in the Table of Deliverables identified by a potential offeror [there were unintended empty cells, specifically at A09b and A020] -adds a revised Performance Work Statement that provides further information to Key Personnel in para 4.0. AND -extends the response time to 16 February 2022 COMBINED SYNOPSIS/SOLICITATION Out-of-Service EEMUA 159 OR API 653 Inspections of Aboveground Storage Tanks at Thule AB, Greenland FA890322Q0001 This is a combined synopsis/solicitation for commercial items prepared in accordance with (IAW) the format in Federal Acquisition Regulation (FAR) Subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued. The Request for Quotation (RFQ) number FA890322Q0001 shall be used to reference any written quote provided under this RFQ. This requirement is for a total of four EEMUA 159 OR API 653 inspections in 2022, and options for four more EEMUA 159 inspections in 2023, and options for four more EEMUA 159 OR API 653 inspections in 2024. This is set-aside IAW Diplomatic Note 127, that sets aside all requirements for Greenland to Greenlandic and/or Danish firms. See attachments for the RFQ and all additional documents.

More opportunities from Department Of Defense → FA8903 772 Ess Pk

Same awarding agency

NAICS: 541
Federal
NEW - Air Force Installation and Mission Support Center (AFIMSC) Streamlining Procurement for Effective Execution & Delivery (SPEED) Commercial Solutions Opening (CSO)
Solicitation # FA890326SC001
The Air Force Installation and Mission Support Center (AFIMSC) has established the Streamlining Procurement for Effective Execution and Delivery (SPEED) Commercial Solutions Opening (CSO) under solicitation FA8903-26-S-C001. This full and open acquisition vehicle, active from September 1, 2025, through August 31, 2030, is designed to competitively procure innovative commercial items, technologies, and services to close capability gaps and advance technological capabilities across various Areas of Interest (AoI). The program utilizes a streamlined acquisition process authorized by DFARS Subpart 212.70, allowing for awards via FAR Part 12 Commercial Item Procedures or Other Transaction (OT) agreements under 10 USC 4022. Both traditional and non-traditional defense contractors are eligible to participate. The SPEED CSO employs a multi-stage Spiral submission process to evaluate solutions. Spiral 1 typically requires a concise written solution brief of no more than five pages or a five-minute mp4 video. Successful candidates may progress through subsequent spirals involving presentations, pitches, and formal commercial solution proposals. Evaluation is based on technical approach, performance schedule, and fair and reasonable pricing, with a focus on merit and risk. Recent and ongoing Areas of Interest include the modernization of Civil Engineer IT portfolios, AI-driven facility space planning, Radio Frequency spectrum monitoring, and the development of resilient expeditionary facility prototypes. Technical requirements across these efforts frequently emphasize secure cloud architecture, AI/ML integration, and strict adherence to cybersecurity and Risk Management Framework (RMF) standards. Administrative requirements for award include registration in the System for Award Management (SAM) with a Unique Entity ID (UEI) and registration in the Wide Area Work Flow (WAWF) system for invoicing.

POSTED

21 days ago

DEADLINE

in almost 4 years
View Details
NAICS: 531190
Federal
Request for Lease Proposal (RFLP) Enhanced Use Leasing Project Davis-Monthan Air Force Base, AZ
Solicitation # AFCEC26R0003RFLP
The Department of the Air Force is soliciting proposals for an Enhanced Use Lease (EUL) project at Davis-Monthan Air Force Base in Tucson, Arizona. This non-FAR real estate transaction involves a long-term sublease of approximately 500 acres of land, currently held by the Government under a Master Lease with the City of Tucson. The objective is to select one or more lessees to finance, develop, and operate private commercial improvements on the property. While the current Master Lease expires on June 30, 2052, the Government intends to extend it to allow for sublease terms of up to 50 years with potential for further renewal. A mandatory requirement of the project is the relocation and construction of a new Combat Arms Training and Maintenance (CATM) facility. This facility must include two 50-meter small arms ranges for 5.56mm and 9mm training, one 800-meter range for 7.62mm training, and a 10,000 square foot administrative and classroom building. Lessees are responsible for all development costs, including the relocation of installation boundary fencing and the provision of payment and performance bonds. The project must comply with Davis-Bacon wage standards, the Buy American Act, and specific environmental land use controls. The Government will utilize a best-value proposal selection strategy, evaluating offerors based on their project description, return to the Government, organizational experience, and project plan. Proposals are due by November 2, 2026, and must include a financial pro forma in Excel and a narrative limited to 40 pages. Selected lessees must maintain comprehensive insurance coverage and employ a Government-approved independent construction consultant to certify that all work meets applicable federal, state, and local codes.
Lessors of Other Real Estate Property

POSTED

about 1 month ago

DEADLINE

in 13 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS