Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Government Contract opportunity from Vermont was posted on June 11, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Overhead and Drive-Thru Door Supply

Closed
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

AI Contract Overview

Show more

The contract involves the procurement and supply of a total of seven large overhead doors, specifically five measuring 12 feet by 14 feet and two drive-thru bay doors of the same dimensions, intended for use at a municipal garage. This subcontract falls under the NAICS code 332311, indicating its relevance to manufacturing metal doors and related components. The contracting agency is Vermont's Department of Economic Development, which is overseeing the acquisition to support infrastructure needs at the municipal facility. The solicitation was posted on June 11, 2026, with a response deadline set for July 8, 2026, highlighting a clear timeframe for vendors interested in submitting bids. Although specific location details for the place of performance and points of contact were not provided, the opportunity is listed on the Vermont Business Registry portal. There are no specified set-aside provisions for this subcontract, indicating it is open for general competition within the appropriate industry sector.

General Info

Procurement of seven large overhead doors for Vermont municipal garage, bids due July 8, 2026.

Agency

Vermont → Department of Economic DevelopmentView Agency

NAICS

332311 - Prefabricated Metal Building and Component ManufacturingView NAICS

Place of Performance

VT, USA

Set-Aside

NONE

Documents

This scope was carved out of 73855.

The full solicitation package (1 document), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

RFQ for Town Garage

AI Contract Breakdown

Uniform Contract Format

No contract breakdown available.

Cannot generate Contract Breakdown because no documents were found from this contract's source.

Timeline

PhaseClosed
Posted

subcontract

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyVermont → Department of Economic Development
ContactsNo contacts available
OfficeN/A
Organization / Agency
Vermont → Department of Economic Development
View Agency Profile
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Supply of five 12’x14’ overhead doors and two 12’x14’ drive-thru bay doors for the municipal garage.

More opportunities from Vermont → Department of Economic Development

Same awarding agency

NAICS: 541330
New
SLED
Centerville Brook AOP Obstructions Design Planning Hyde Park
Solicitation # 75140
The Centerville Brook AOP Obstructions Design Planning project in Hyde Park, Vermont, focuses on restoring aquatic organism passage and improving stream connectivity. The primary objective is to advance the Centerville Brook Dam removal from a 30 percent preliminary design to a 100 percent shovel-ready final design. This scope includes full structural removal of the dam, stream channel restoration, sediment management of approximately 200 cubic yards of impounded material, and the relocation of a dry hydrant to a viable downstream location at Brook Road. The project aims to eliminate flood risks, reduce streambank erosion, and enhance habitat complexity through the use of timber grade controls and Beaver Dam Analogs. Additionally, the project has expanded to include preliminary 30 percent design planning for two downstream culverts at Centerville Road and Brook Road. These structures currently act as perched barriers to native brook trout and other aquatic species. The design process will evaluate whether these culverts require full replacement or can be improved through aquatic organism passage retrofits. Managed by the Lamoille County Planning Commission and supported by grants from the Lake Champlain Basin Program and the New England Interstate Water Pollution Control Commission, the initiative seeks to establish a natural stream channel to improve water quality and flood water capacity.
Engineering Services

POSTED

1 day ago

DEADLINE

in 20 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS