P-420 Integrated Water Treatment System, Naval Base Kitsap Bremerton, WA

Awarded
N44255-14-R-5000Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237110
New
Morgans Branch Force Main and Pump Station Improvements
Solicitation # SRP-W-134-0290
The Morgans Branch Force Main and Pump Station Improvements project, solicitation number SRP-W-134-0290, is a construction contract for the City of Belmont, North Carolina, with an estimated value of 16,690,000 dollars. The scope of work involves the construction of 16,435 linear feet of new 20-inch ductile iron force main and comprehensive upgrades to the Morgans Branch Pumping Station. Key infrastructure improvements include the installation of a new wet well, valve vault, and associated appurtenances, as well as the demolition of existing pumps and piping. The contractor is responsible for delivering a fully operational facility, including the installation of pumps, a generator, odor control equipment, new gravity sewers, and manholes, while managing by-pass pumping, testing, and commissioning. The contract will be awarded to the responsible bidder submitting the lowest responsive bid, with a strong emphasis on MWBE compliance through the submission of Good Faith Efforts and Table A documentation. Bids are due by November 12, 2026, and must be submitted using the EJCDC C-410 Bid Form. The project is governed by EJCDC standard general and supplementary conditions, requiring performance and payment bonds and proof of insurance. Technical standards include AWWA Specification C-600 for pipelines, NEMA MG1 for motors, and AWS D1.2 for aluminum welding. Project administration is managed by the City of Belmont with Willis Engineers serving as the project engineer. Payment is processed via Applications for Payment, with terms set at 30 days after presentation to the owner.
Don Moorhead Construction, Inc.

POSTED

about 9 hours ago

DEADLINE

in 20 days

General Info

Contract Value

$10,173,429

NAICS

237110 - Water and Sewer Line and Related Structures Construction

Place of Performance

WA

Set-Aside

NONE

Award Issued Date

Documents

35

Amendment 0001 to Solicitation N44255-14-R-5000

PDF, High priority: read this firstamendment
High

Amendment 0002 to Solicitation N44525-14-R-5000

PDF, High priority: read this firstamendment
High

Amendment 0003 - N44255-14-R-5000 (Integrated Water Treatment System)

PDF, High priority: read this firstamendment
High

Amendment 0004 to Solicitation N44255-14-R-5000

PDF, High priority: read this firstamendment
High

Amendment 0005 - N4255-14-R-5000 Integrated Water Treatment System

PDF, High priority: read this firstamendment
High

Amendment 0008 - Solicitation N4255-14-R-5000

PDF, High priority: read this firstamendment
High

Amendment 0009 - N4255-14-R-5000 (PPI Responses)

PDF, High priority: read this firstamendment
High

Amendment 0010 - N44255-14-R-5000 (Integrated Water Treatment System)

PDF, High priority: read this firstamendment
High

Dry Dock No. 4 Utilities Upgrade Geotechnical Engineering Study

PDF, High priority: read this firstspecifications
High

FY-14 MCON Project P-420 Integrated Drydock Water Treatment Fac. - QC Requirements

PDF, High priority: read this firstspecifications
High

FY-14 MCON Project P-420 Integrated Drydock Water Treatment Fac. - Section 01 14 00.05 20

PDF, High priority: read this firstspecifications
High

N44255-14-R-5000 Amendment 0006

PDF, High priority: read this firstamendment
High

N44255-14-R-5000 Amendment 0007

PDF, High priority: read this firstamendment
High

N44255-14-R-5000 P-420 Integrated Water Treatment System

PDF, High priority: read this firstrfp
High

Pneumatic Control Diagram - Pumpwell 4 / DD4 OW Bldg

PDF, High priority: read this firstspecifications
High

PPI_0012_C-131_C-132_C-133_C-134

PDF, High priority: read this firstspecifications
High

PPI_0013-0020-Structural_Dwgs_Addendum

PDF, High priority: read this first7 pages · amendment
High

PPI_0040_DRYD-P420-1107668-G-002 Drawing Index and Design Intent

PDF, High priority: read this firstspecifications
High

PPI_0056_Structural_Dwgs - Floor Plan Area 3D DD3

PDF, High priority: read this firstspecifications
High

PPI_0074_C-432 - Mechanical Connection Points

PDF, High priority: read this firstspecifications
High

PPI_0088-0097_Revised_Drawings

PDF, High priority: read this firstspecifications
High

PPI Structural Drawings - Dry Dock 4

PDF, High priority: read this firstspecifications
High

Project P-420 Integrated Drydock Water Treatment Fac. - Section 09 96 00 High-Performance Coatings

PDF, High priority: read this firstspecifications
High

Project P-420 Integrated Drydock Water Treatment Fac. Table of Contents

PDF, High priority: read this firstspecifications
High

Project P-420 Summary of Work - Section 01 11 00

PDF, High priority: read this firstsow
High

PSNS 11310/32 Substation One-Line Diagram

PDF, High priority: read this firstspecifications
High

Pumpwell 3A Electrical Floor Plans and Notes

PDF, High priority: read this firstspecifications
High

Section 00 01 15 - List of Drawings (Project P-420)

PDF, High priority: read this firstspecifications
High

Section 00100 List of Attachments

DOCX, High priority: read this firstpast-performance
High

Section 01 11 00 Summary of Work - Project P-420 Integrated Drydock Water Treatment Fac.

PDF, High priority: read this firstsow
High

Section 33 11 00 - Process Water Collection System (PWCS)

PDF, High priority: read this firstspecifications
High

Substation No. One-Line Diagram (PSNS 11310/32)

PDF, High priority: read this firstspecifications
High

Attachment I: Short Term Visitor Badge Request

PDF, Low priorityother
Low

P-420 Site Visit Sign-in Sheet - Integrated Water Treatment System

PDF, Low priorityindustry-day
Low

Piezometer Installation Report - Dry Dock Nos. 1 and 3

PDF, Low prioritygeotechnical-report
Low

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

13 updates
PhaseAwarded
Posted

Presolicitation

Justification (J&A)

Justification & Approval published

Notice updated

The notice description changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline added: Jan 30, 2014.

Deadline changed

The response deadline was removed.

Deadline changed

Response deadline added: Jan 30, 2014.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Jan 30, 2014 to Feb 10, 2014.

Notice updated

Notice details unchanged. Attachments may have changed.

Deadline changed

Response deadline changed from Feb 10, 2014 to Feb 24, 2014.

Notice updated

Notice details unchanged. Attachments may have changed.

Notice updated

Notice details unchanged. Attachments may have changed.

Type Changed

Presolicitation → Solicitation

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Defense → Navfacsyscom Northwest
Contacts2 people available
OfficeSILVERDALE, WA, 98315-1101, USA
Office AddressSILVERDALE, WA, 98315-1101, USA
Contacts
Rabi PeiferContract Specialist

More opportunities from Department Of Defense → Navfacsyscom Northwest

Same awarding agency

NAICS: 237990
Federal
Shipyard Infrastructure Optimization Program Multi-Mission Dry Dock, Multiple Award Construction Contract
Solicitation # N4425526R0005
The Naval Facilities Engineering Systems Command (NAVFAC) is soliciting proposals for an Indefinite-Delivery Indefinite-Quantity (IDIQ) Multiple Award Construction Contract (MACC) to support the Shipyard Infrastructure Optimization Program (SIOP) Multi-Mission Dry Dock (MMDD). The project primarily involves heavy and civil engineering waterfront facilities, as well as commercial and institutional construction, located at the Puget Sound Naval Shipyard and Intermediate Maintenance Facility (PSNS and IMF) at Naval Base Kitsap in Bremerton, Washington. The contract has a maximum aggregate estimated value of 15 billion dollars over a potential 10-year period, consisting of a five-year base period and one five-year option. Major task orders are expected to range from 2 billion to 6 billion dollars, though smaller task orders for Early Contractor Involvement and Alternative Technical Concepts may be issued. Each MACC holder is guaranteed a minimum of 1 million dollars. The solicitation is unrestricted and open to full competition, though large businesses must provide an acceptable small business subcontracting plan. Evaluation factors include experience, price, and small business utilization and participation. A key initial component is a seed project task order for Alternative Technical Concepts (ATC) Package 1 Marine, which focuses on innovative strategies to improve cost, schedule, and constructability. This specific effort includes the delivery of an ATC report and a facilitated panel discussion led by the contractor's key personnel. Offerors must be registered in the System for Award Management (SAM) and provide comprehensive documentation, including bonding capacity via a surety form, financial questionnaires, and historical small business utilization data. All work is subject to Davis-Bacon Act wage determinations for Kitsap County, Washington.
Other Heavy and Civil Engineering Construction

POSTED

21 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS