Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Government Contract opportunity from Department Of Agriculture was posted on July 31, 2006. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

P -- Decommission Lake Blue Ridge Campground

Awarded
AG-435H-S-06-0009Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238910
New
SLED
26ITB0921226K-CRB Abatement & Demolition Services for Fulton County Jail Project
Solicitation # 26ITB0921226K-CRB
Fulton County, Georgia, is soliciting bids for solicitation number 26ITB0921226K-CRB to provide abatement and demolition services for the Fulton County Jail project. The scope of work involves the demolition of three specific locations: the Fulton County Accountability Court, Jefferson Place Transition Housing, and the Bellwood Annex. The project covers approximately 32.86 acres, with 3.30 acres of disturbed area, and requires the removal of buildings, foundations, utilities, and pavement. A critical component of the contract is the identification, abatement, and lawful disposal of hazardous materials, including asbestos-containing materials and lead-based coatings, in compliance with NESHAP, OSHA, and GA EPD regulations. The final objective is to create a proposed green space for a future facility, which includes grading and restoring disturbed areas with topsoil and grass seed. The contract will be awarded to the lowest responsive and responsible bidder based on an evaluation of price, technical experience, and financial capacity. Bidders must attend a mandatory guided site visit on November 10, 2026, and submit their sealed bids by November 20, 2026. Required submissions include a bid bond for five percent of the bid amount, as well as various certifications and disclosure forms. The successful contractor must provide performance and payment bonds for 100 percent of the bid and utilize the B2GNow software for payment reporting. Work is to commence within ten days of a notice to proceed, which may be issued within 120 days of contract execution. All work is subject to inspection by the Construction Manager to determine substantial and final completion.
Fulton County Purchasing Department

POSTED

about 11 hours ago

DEADLINE

in 22 days
NAICS: 238910
New
SLED
ITB-26-22 - City Center Sport Complex Ballfields Restoration
Solicitation # ITB-26-22-CW
The City of Port Orange is soliciting bids for the restoration and reconstruction of approximately 8 acres of developed parkland at the City Center Sport Complex Ballfields. Because the site is located on a former municipal landfill, the project focuses on managing legacy landfill conditions to ensure long-term stability and safety. The scope of work includes the excavation and removal of the upper three feet of soil, the identification and lawful disposal of solid waste, the installation of a 300,000 square foot reinforced geotextile membrane, and the replacement of topsoil and suitable fill. Additional requirements include the reconstruction of ballfields, parking lots, and associated site improvements, such as asphalt pavement and chain link fencing. The contract will be awarded to the lowest responsive and responsible bidder, with an engineer's estimate of 3,500,000 dollars and a projected performance term of 395 days. Bidders must be certified General Contractors licensed in the State of Florida. Submissions require a hybrid approach, consisting of an electronic bid via OpenGov and a hand-delivered hard copy including a PDF on a flash drive, with a final deadline of November 9, 2026. Mandatory requirements for bidders include attendance at the pre-bid site visit, the provision of a bid bond typically valued at 5 percent of the bid amount, and the submission of numerous compliance affidavits covering workers compensation, E-Verify, and anti-collusion. Payments will be processed via ACH within 45 days of receiving a proper invoice.
Engineering

POSTED

about 12 hours ago

DEADLINE

in 11 days

General Info

Contract Value

$97,900

NAICS

238910 - Site Preparation Contractors

Place of Performance

GA

Set-Aside

NONE

Award Issued Date

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

1 update
PhaseAwarded
Posted

Presolicitation

Notice updated

Notice type changed from Presolicitation to Special Notice. The response deadline was removed. NAICS code changed from 238910 to 237990. The notice description changed.

Awarded

Contract was awarded

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Agriculture → Chattahoochee Oconne National Forest
Contacts2 people available
OfficeGAINESVILLE, GA, 30501, USA
Office AddressGAINESVILLE, GA, 30501, USA
Contacts
Kimberly B. CarithersProcurement Technician
Christy G SmithContract Specialist

Full Description

Show more
AG-435H-S-06-00009 Decommission Lake Blue Ridge Campground Preproposal Conference June 20, 2006 The following information is offered as clarification to questions asked: A. Well depth is 400' B. Well casing is 6 " Diameter C. Casing depth is unknown D. The drawings state that the contractor shall remove benches and re-shape to natural contours. Natural contours does not mean original contours. We are looking for the benches and sharp angles to be replaced with smooth, blended transitions. E. Existing trees should not need to be removed. Natural contours can be blended around tree bases. F. There are two area where boulders are required. These are available on site and can be taken from the site. The intent is to block ATV traffic. One site will require approximately 4 boulders. The other site will require approximately 8 boulders. Exact number of boulders required depends upon their size. G. The septic tanks and well reservoir may be demolished in place. See Spec. Section 02070 DEMOLITION, PART 2,Paragraphs B AND C.

Earlier notices in this NAICS code

Posted before this notice, open and closed

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS