P--Eastside Bypass Improvements Project Weir Removal

Active
140R2019Q0073Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Bureau of Reclamation’s Mid-Pacific Region plans to issue a firm fixed-price service contract focused on the Eastside Bypass Improvements Project, specifically targeting weir removal work. This contract is designated as a Total Small Business Set-Aside under NAICS code 238910, with a small business size standard of $14 million. The estimated project cost ranges from $250,000 to $500,000. The work site is located in the Eastside Bypass Flood Control Channel near Merced, California. Key tasks include the removal and delivery of gaging station hardware, construction of coffer dams, selective removal of reinforced concrete and metal structures at the Upper and Lower Weirs, excavation and backfilling around reinforced concrete abutments, and restoration of disturbed soil with re-vegetation efforts. Contractors will also be responsible for recycling or disposing of waste, installing erosion control measures, and restoring all impacted areas under applicable permits. Solicitations for this contract were scheduled to be posted electronically around late March 2019, with offers due approximately one month later. Interested bidders must be actively registered in the System for Award Management (SAM) to be eligible. The solicitation will only be available for download online, with no paper copies issued. The work will be managed by the Denver Federal Center office of the Department of the Interior, and the contract seeks to engage a qualified small business capable of safely and effectively executing the required demolition, environmental mitigation, and site restoration activities in compliance with federal requirements.

General Info

Small business set-aside for weir removal, demolition, excavation, and restoration near Merced, California.

NAICS

238910 - Site Preparation Contractors

Place of Performance

CO

Set-Aside

SBA

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhasePresolicitation
Posted

Presolicitation

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyDepartment Of The Interior → Denver Federal Center
ContactsNo contacts available
OfficeDENVER, CO, 80225, USA
Office AddressDENVER, CO, 80225, USA
ContactsNo contact information available

Full Description

Show more
The Mid-Pacific Region of the Bureau of Reclamation intends to issue a Solicitation for a firm fixed-price service contract for Eastside Bypass Improvements Project Weir Removal. This procurement is set-aside for Total Small Business. The work to be performed is described below. The applicable North American Industry Classification System (NAICS) Code is 238910 and the related small business size standard is $14.0M. This notice is not an invitation for offers and the information presented in this announcement will not obligate the Bureau of Reclamation in any manner. The estimated cost of this project is between $250,000.00 and $500,000.00. The work is located within the Eastside Bypass Flood Control Channel, approximately 16 miles south-west of Merced, California in Merced County. PRINCIPAL COMPONENTS OF WORK: A. Remove, crate, and deliver gaging station hardware to US Bureau of Reclamation, Friant Dam Office, Friant CA. B. Construct Coffer Dams as required to protect sites during the work. C. Selectively saw-cut and remove reinforced concrete pier walls, sill walls, structural and miscellaneous metalwork, timber planking, and miscellaneous hardware. Existing concrete buried cut-off walls and slab to remain as a permanent feature at the Lower Weir. All features shall be removed at the Upper Weir. D. Excavate and remove existing reinforced concrete abutments (4 total, 2 each at the Upper and Lower weirs). E. Place soil backfill in excavated areas at each abutment site. F. Do not compact soil, which would inhibit re-vegetation efforts. G. Recycle, reuse, salvage, or dispose of all waste materials removed at permitted sites. H. Restore disturbed soil areas, primarily at the abutments but potentially other locations around the weirs. I. Install erosion control measures as required by permits to prevent loss of soil materials. J. Place seeding mix, saplings, and other items (fertilizer, irrigation, etc.) to initiate re-vegetation efforts. K. Restore other disturbed areas. Solicitation 140R2019Q0073 will be posted electronically via www.fedbizopps.gov on or about March 27, 2019. The date for receipt of offers will be approximately April 26, 2019. The solicitation must be downloaded at the above website; no paper copy of this solicitation will be distributed. Prospective contractors MUST be actively registered in the System for Award Management (SAM) database at http://www.sam.gov to be eligible for award.

Similar Contracts

Same NAICS industry code

NAICS: 238910
New
SLED
26ITB0921226K-CRB Abatement & Demolition Services for Fulton County Jail Project
Solicitation # 26ITB0921226K-CRB
Fulton County, Georgia, is soliciting bids for solicitation number 26ITB0921226K-CRB to provide abatement and demolition services for the Fulton County Jail project. The scope of work involves the demolition of three specific locations: the Fulton County Accountability Court, Jefferson Place Transition Housing, and the Bellwood Annex. The project covers approximately 32.86 acres, with 3.30 acres of disturbed area, and requires the removal of buildings, foundations, utilities, and pavement. A critical component of the contract is the identification, abatement, and lawful disposal of hazardous materials, including asbestos-containing materials and lead-based coatings, in compliance with NESHAP, OSHA, and GA EPD regulations. The final objective is to create a proposed green space for a future facility, which includes grading and restoring disturbed areas with topsoil and grass seed. The contract will be awarded to the lowest responsive and responsible bidder based on an evaluation of price, technical experience, and financial capacity. Bidders must attend a mandatory guided site visit on November 10, 2026, and submit their sealed bids by November 20, 2026. Required submissions include a bid bond for five percent of the bid amount, as well as various certifications and disclosure forms. The successful contractor must provide performance and payment bonds for 100 percent of the bid and utilize the B2GNow software for payment reporting. Work is to commence within ten days of a notice to proceed, which may be issued within 120 days of contract execution. All work is subject to inspection by the Construction Manager to determine substantial and final completion.
Fulton County Purchasing Department

POSTED

about 9 hours ago

DEADLINE

in 22 days
View Details

More opportunities from Department Of The Interior → Denver Federal Center

Same awarding agency

Earlier notices in this NAICS code

Posted before this notice, open and closed

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS