Nature of Project The Commissioners Court of Nueces County (hereinafter called the “County”) will accept sealed competitive bids for: Packery Channel Nature Park Shoreline Enhancement (CMP) at 14218 Park Road 22, Corpus Christi, TX 78414 in accordance with the Drawings, Specifications, and other Contract Documents prepared by Anchor QEA, Inc. Scope of Work The Scope of Work (SOW) for this project is detailed fully in the attachments below: • Attachment E – Specifications • Attachment F – Plan Drawings Bidder agrees that if his/her Bid is accepted by the County, he will complete all work called for under the Contract Documents on or before 126 calendar days after the date of the Notice to Proceed for the Base Bid, and if the work is not completed by such time, he/she agrees to pay to the County as liquidated damages, the sum of One thousand five hundred dollars and 00/100 ($1,500.00) for each day that expires after the time (as duly adjusted pursuant to this Agreement) specified above for Substantial Completion, until the Work is substantially complete. Completion of Remaining Work: After Substantial Completion, if Contractor shall neglect, refuse, or fail to complete the remaining Work within the Contract Times (as duly adjusted pursuant to this Agreement) for completion and readiness for final payment, Contractor shall pay Owner Five Hundred Dollars and 00/100 ($500.00) for each calendar day after such time that the work remains incomplete, calculated in accordance with the provisions of the Contract Documents. The Contractor shall provide all tools and equipment that are necessary to complete the project in its entirety. All work shall be in accordance with the scope of work. All materials used for the project shall be equal to or better than the existing materials quality. The Contractor will be responsible for removal and disposal of all demolished materials and debris from the work area. The Contractor shall take proper care to avoid unnecessary noise, clatter or obstructions in walkways, sidewalks, and roadways. The Contractor shall not interfere with use or safe passage to and from building and adjacent facilities. Nueces County does not provide project estimated cost, in order to receive the lowest & best bid for our taxpayers. Time is of the essence. Failure to complete the Project within the contract time, except as such time may be extended by delays approved by County, will subject the Bidder to whom the contract is awarded, liability for damages, as provided in the Conditions of the Contract. Contract Administrator: Nueces County Coastal Parks Director, Scott Cross will serve as the contract administrator for this project.