Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, November 11 at 2:00 PM ET

Register Free →

This Solicitation opportunity from California was posted on March 11, 2025. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Painting Services

Closed
01A6490State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 238320
New
SLED
GROVE STREET TANK REHABILIATION
Solicitation # DPW-27-440-05
The Town of Hopkinton Department of Public Works is soliciting bids for the Grove Street Tank Rehabilitation in Hopkinton, Massachusetts, under solicitation number DPW-27-440-05. The project involves a comprehensive interior and exterior coating rehabilitation of a welded steel tank, including the installation of a passive mixing system, vault rehabilitation of process piping and valves, and welding repairs to address corrosion and metal loss. Additionally, the scope requires a licensed electrician to perform electrical modification work and the demolition of three exterior electrical panels. The contract is governed by EJCDC C-700 Standard General Conditions and various Massachusetts General Laws, with a required completion timeline of seventy-five days for the fall work. The contract will be awarded to the lowest responsible and eligible bidder. Bidders must provide a bid deposit of at least 5 percent of the proposed work value, and the successful awardee must provide a 100 percent performance bond and a 50 percent labor and materials payment bond. Key requirements include strict adherence to paint age limits, where no paint manufactured more than six months prior to application is accepted, and compliance with OSHA 10-hour safety training for all employees. The contractor is responsible for providing an approved air quality containment plan, conducting pre- and post-construction soil analysis, and maintaining detailed records for six years after final payment. Final acceptance is contingent upon the submission of as-built record drawings.
Town of Hopkinton

POSTED

about 9 hours ago

DEADLINE

in 21 days
NAICS: 238320
New
SLED
Lincoln Leisure Center Plaster Repair
Solicitation # 2027-17
The City of Bloomington, Illinois, through its Parks and Recreation department, is soliciting bids for solicitation number 2027-17 to perform plaster repair and repainting at the Lincoln Leisure Center located at 1206 S Lee. The scope of work involves repairing deteriorated plaster surfaces and repainting ceilings and walls in both the North and South stairwells to match existing finishes. Work must be performed Monday through Friday between 7:00 AM and 3:00 PM. Bids are due by November 19, 2026, via the ProcureNow e-Procurement portal, with the award being granted to the lowest responsible and responsive bidder. Evaluation factors include service quality, conformity with specifications, delivery terms, and qualifications, with a local preference policy applied to qualified local consultants. The contract requires strict adherence to Illinois Prevailing Wage laws, including the submission of certified payroll. Successful bidders must provide performance and payment bonds equal to 100 percent of the contract price within ten business days of the award. Compliance certifications are required for the Gift Ban Act, the Substance Abuse Prevention Program, and various Illinois Public Acts and federal regulations. Additionally, bidders must submit a Contract Diversity Goal Form and an Equal Employment Opportunity Plan, with a requirement for awarded contractors to provide a Good Faith Effort end-of-project summary. Payment terms are generally NET 45 days, contingent upon the City's inspection and satisfaction with the completed work.
Parks & Recreation

POSTED

about 10 hours ago

DEADLINE

in 22 days

General Info

Documents

2

Addendum 1 - IFPQ #01A6490 Painting Services in Mendocino County

PDF, High priority: read this firstamendment
High

IFPQ 01A6490 - Painting Services in Mendocino County

PDF, High priority: read this first47 pages · ifpq
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Solicitation

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Get full access to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
Contacts1 person available
OfficeN/A
Office AddressN/A

Full Description

Show more
1. Contractor shall provide all labor, tools, materials, vehicles, equipment, travel, and incidentals necessary to prepare and paint the exterior of two (2) storage covers and one (1) 10,000-gallon bulk fuel tank located at the Fort Bragg Maintenance Station.
2. Refer to the Proposed Form of Agreement, Exhibit A, for a more complete description of services.
The documents and files attached to this solicitation do not have any updates for digital accessibility at this time. Updates will be applied as soon as they are available. For an accessible version of solicitation documents published on this page, please submit a request to contact@example.gov or call +1 (555) 000-0000.

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Modify the existing traffic control signals.
Solicitation # 07-381404
The California Department of Transportation has issued solicitation 07-381404 for the modification of existing traffic control signals on a State Highway in Los Angeles County, specifically at Del Amo Boulevard in the City of Torrance. With an estimated project cost of 780,000 dollars, the scope of work includes modifying signal and lighting systems, implementing temporary signal systems, and installing thermoplastic crosswalks and pavement markings with enhanced wet night visibility. The project also requires the establishment of traffic control systems, construction area signs, and temporary pedestrian access routes, as well as the development of a lead compliance plan and a water pollution control program. Contractors must hold either a Class A or Class C-10 license and adhere to prevailing wage rates as determined by the California Department of Industrial Relations. Performance must begin within 180 days of contract approval, with a 72-hour notice required prior to starting job site activities. Key technical requirements include compliance with MIL-STD-810G for cellular routers and strict marking and identification standards for temporary steel barrier segments. Quality control measures involve source inspection of equipment enclosures and specific testing for cables and concrete compressive strength. Payment is managed through the Department's prompt payment monitoring system, requiring subcontractors to be paid within seven days of progress payments. The solicitation also emphasizes Buy America requirements for furnished materials and includes specific submittal preferences for Disabled Veteran Business Enterprises and small businesses.
Highway, Street, and Bridge Construction

POSTED

about 16 hours ago

DEADLINE

in 20 days
View Details
NAICS: 237310
New
SLED
Construction On State Highway In Los Angeles County At Various Locations On Route 10 From 0.2 Mile West Of Francisquito Avenue Undercrossing To Fairplex Drive Overcrossing And On Route 57 From 0.3 Mile South Of Brea Canyon Road Undercrossing To Gladstone
Solicitation # 07-379904
Solicitation 07-379904 is a unit price construction contract issued by the California Department of Transportation for highway improvements in Los Angeles County. The project scope involves construction on State Highway Route 10, from 0.2 mile west of the Francisquito Avenue undercrossing to the Fairplex Drive overcrossing, and on Route 57, from 0.3 mile south of the Brea Canyon Road undercrossing to Gladstone. With an estimated project cost of 7.4 million dollars, the work encompasses roadway excavation, concrete removal, clearing and grubbing, and the implementation of drainage, utilities, and electrical systems. Key deliverables include pavement structural work and comprehensive traffic management, requiring the use of special portable freeway detour signs and changeable message signs to ensure the traveled way remains open when construction is not active. The contract mandates strict adherence to 2025 Standard Specifications and Standard Plans, with project plans approved on June 9, 2026. Bidders must submit responses by December 8, 2026. Compliance requirements include following Buy America/Build America standards for manufactured products, providing environmental product declarations for concrete and asphalt, and adhering to prevailing wage rates as determined by the California Department of Industrial Relations or the U.S. Secretary of Labor, whichever is higher. Quality control is emphasized through mandatory ACI Concrete Field-Testing Technician Grade 1 certification for personnel and rigorous testing of materials at METS. Additionally, the project requires a lead compliance plan and specific marking and labeling standards for steel barriers, connection bolts, and pavement markings.
Highway, Street, and Bridge Construction

POSTED

2 days ago

DEADLINE

in about 1 month
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS