Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, December 9 at 2:00 PM ET

Register Free →

Palisade Santee Commerce Center

Forecast
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The Palisade Santee Commerce Center project, located at 10990 N. Woodside Avenue in Santee, California, involves the demolition of existing structures at the former Santee Drive-In Theatre to construct a light industrial and warehousing facility. Originally approved in August 2025 for a single 300,145 square foot building, the project was revised via a January 2026 Notice of Determination to consist of two buildings totaling approximately 290,618 square feet. The facility will include 274,618 square feet of warehouse space and 16,000 square feet of office space, featuring up to 50 dock-high doors, four grade-level doors, one truck court, and 296 parking spaces. The development also includes 450kW of solar PV, a ten-foot tall perimeter wall, and various utility, stormwater, and roadway improvements, including a new sidewalk along N. Woodside Avenue. The project is governed by the California Environmental Quality Act, with the City of Santee certifying the Final Environmental Impact Report and a subsequent Addendum to address site revisions. Compliance requires a Development Review Permit for the building size and a Conditional Use Permit to increase the allowable building height to 50 feet. Key operational and construction mandates include adherence to CALGreen Tier 2 Standards, SDAPCD fugitive dust and architectural coating rules, and the use of CARB-certified Tier 4 Interim engines for diesel equipment 75 horsepower or greater. Environmental mitigation is managed through a Mitigation Monitoring and Reporting Program, which requires a qualified biologist to conduct personnel training on the Endangered Species Act and Clean Water Act, as well as the installation of an interpretive display prior to the issuance of the certificate of occupancy.

General Info

Demolition and construction of 300K sq ft industrial facility in Santee, CA, with 24/7 operations, permits for height increase, and strict environmental and cultural protections.

Place of Performance

Santee, CA, 92071

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

View Full Breakdown

Get what you need to respond

No documents were posted with this contract.

  • Buyer contactEmail and phone
  • Original solicitationLink to the source posting
Get the buyer contact

Ask CLEATUS

I've read this contract. Ask me anything.

Timeline

PhaseForecast
Posted

forecast

Prepare for this forecast

Research the agency, track this forecast, and prepare your capture plan before the solicitation opens.

Organization & Contact Information

Show more
AgencyCalifornia → City of Santee
Contacts2 people available
OfficeN/A

Full Description

Show more
Project Description: On January 28, 2026, at a regularly held public meeting of the Santee City Council, the City adopted Resolution No. 010-2026 certifying that the City Council considered the Addendum to the certified Environmental Impact Report (SCH No. 2023090144), determined that no further environmental review is required, made findings in accordance with Section 13.04.060 of the SMC for a Major Revision (MJR-2025-001), and approved the Major Revision. The Major Revision revised the approved Santee Commerce Center Project to include two light industrial buildings onsite instead of the single building under the Approved Project. The new two-building configuration would reduce overall building area from 300,145 square feet to 290,618 square feet. On August 27, 2025, the City certified the Final Environmental Impact Report (EIR) (SCH No. 2023090144), adopted Findings of Fact and a Statement of Overriding Considerations under the California Environmental Quality Act, adopted a Mitigation Monitoring and Reporting Program, and approved the proposed Palisade Santee Commerce Center project (Approved Project). The Addendum evaluates minor modifications to the Approved Project related to noise and confirms that the proposed changes do not result in any new significant environmental effects, do not substantially increase the severity of previously identified significant effects, and do not trigger any of the conditions described in CEQA Guidelines Sections 15162 or 15163 requiring preparation of a Subsequent or Supplemental EIR. The Addendum relies on the analysis, mitigation measures, and conclusions of the certified Final EIR. All mitigation measures and conditions imposed on the Approved Project will continue to be applicable to the approved Major Revision. The site is not listed as a hazardous waste and substance site pursuant to Section 65962.5 of the Government Code. This includes but is not limited to lists of hazardous waste facilities, land designated as hazardous waste property, and hazardous waste disposal sites, and the information in the Hazardous Waste and Substances Statement required under subsection (f) of that Section

Similar Contracts

Same NAICS industry code

NAICS: 541620
New
SLED
RFP for Preparation of an Initial Study Under CEQA
Solicitation # RFP-PLN-2504
The County of San Benito is soliciting proposals for the preparation of an Initial Study under the California Environmental Quality Act (CEQA). This project, identified as RFP-PLN-2504, requires the selected contractor to perform services in accordance with the Public Resources Code and the California Code of Regulations. The scope of work is divided into three primary tasks: project management, scope of services, and a traffic impact analysis. To support the study, the County has provided reference materials from planning files PLN250084 and PLN180004, which include grading and utility plans, a mitigated negative declaration, and various technical reports. Proposals must be submitted electronically via the OpenGov system by December 7, 2026, at 5:00 pm. The submission must be split into a technical proposal and a separate cost proposal using a specific pricing table. Award selection is based on a points-based scoring system that weights cost at 30%, firm qualifications at 25%, experience in similar CEQA analysis at 25%, and the quality of the written scope of work at 20%. The County reserves the right to award the contract to the highest-rated proposer rather than the lowest bidder. The resulting contract will be governed by the County of San Benito's Standard Contract, featuring a net-30 payment term with invoicing occurring one month in arrears. Contractors must certify compliance with various federal non-discrimination laws, including the Americans with Disabilities Act and the Civil Rights Act of 1964, and must provide a debarment certification. Final project schedules, including milestones and critical paths, will be required from the proposer, while specific insurance and indemnification terms will be finalized during the negotiation process.
Planning

POSTED

about 12 hours ago

DEADLINE

in 20 days
View Details
NAICS: 541620
New
International
Source Water Protection Plan - Baptiste Lake
Solicitation # 235899
The Regional District of East Kootenay is seeking a qualified consultant to develop a comprehensive and implementable Source Water Protection Plan for Baptiste Lake in British Columbia. The scope of work involves characterizing the lake and watershed as a drinking water source, identifying hazards and vulnerabilities, and evaluating current protection measures, governance, and climate-related risks. The final deliverables must include a detailed Source Water Protection Plan with recommended actions for land use and monitoring, a practical implementation plan with budget-level cost estimates, and a monitoring framework with decision triggers. The plan must align with the Edgewater Water System Master Plan, Interior Health permit conditions, and DFO screening requirements. The contract is expected to be awarded by December 18, 2026, with a project start-up meeting scheduled for mid-January 2027, a draft report due by May 28, 2027, and a final report due by July 2, 2027. Proposals are evaluated on a 100-point scale, with 40 points allocated to the project team and experience, 40 points for project understanding and methodology, and 20 points for the fee. The selection process prioritizes the highest overall ranking and best value rather than the lowest bid. Submissions must be delivered in PDF format to the designated Engineering Technician by the closing deadline.
Regional District of East Kootenay

POSTED

about 14 hours ago

DEADLINE

in 24 days
View Details

More opportunities from California → City of Santee

Same awarding agency

NAICS: 925120
SLED
City of Santee Housing Element Rezone Program Implementation
Solicitation # 2021100263
The City of Santee Housing Element Rezone Program Implementation, identified by solicitation number 2021100263, provides the environmental and regulatory framework for residential development within the City of Santee, California. A primary component of this program is The Exchange at Santee Town Center, which involves subdividing a 4.18-acre parcel to develop 100 attached townhome residential units at a density of 24 units per acre. The scope of work includes the construction of private roadways, parking, landscaping, open space, and necessary utility and stormwater improvements. Other implementations under this program include the Cottonwood and Park Parkvue Project, a 285-unit residential condominium development featuring street improvements and riparian scrub restoration to establish buffer zones for the city preserve system. Environmental compliance for these projects is governed by a Program Environmental Impact Report certified by the City Council on October 12, 2022. Pursuant to CEQA Guidelines Sections 15168(c) and 15162, the projects are determined to have no new significant environmental effects beyond those previously analyzed. Adherence to a Mitigation Monitoring or Reporting Plan is required to manage environmental impacts, and specific water-related works must comply with Fish and Game Code section 1602. Project administration is managed by the City of Santee Planning and Building Department, with Borstein Enterprises serving as a project applicant.
Administration of Urban Planning and Community and Rural Development

POSTED

11 months ago

DEADLINE

N/A
View Details
NAICS: 236220
SLED
Santee Community CenterThe City of Santee is overseeing the construction of a two-story, 12,500 square foot community center located at 10129 River Walk Drive on a 3.57-acre portion of a 5.2-acre parcel. The facility will feature an event center, multipurpose rooms, two covered patios, a service kitchen, food service truck parking, and four-tier amphitheater seating. Beyond its role as a community hub, the building is designed to serve as the city's backup Emergency Operation Center. Site improvements include the installation of 29,360 square feet of landscaping and irrigation, six biofiltration basins, an upgraded trash enclosure, and a new joint use parking lot. The project is subject to strict environmental and regulatory compliance measures under CEQA and the Mitigation Monitoring and Reporting Program. Key requirements include the submission of a Stormwater Pollution Prevention Plan, the use of California Air Resources Board-certified Tier 4 Final engines for diesel equipment 75-horsepower or greater, and the implementation of specific noise and dust control measures. The contractor must employ a qualified project biologist to monitor ground-disturbing activities and provide environmental awareness training to personnel. Additionally, the contract mandates strict protocols for the protection of biological resources, the management of cultural and archaeological finds, and the maintenance of retained city trees by a certified arborist.
Commercial and Institutional Building Construction

POSTED

11 months ago

DEADLINE

N/A
View Details

Prepare for this forecast

Research this forecast and prepare for the solicitation

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS