Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Solicitation opportunity from Washington was posted on July 30, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Park Structures Demolition and Abatement Project (Former Wayne Golf Course Front 9 and Back 9, and North Creek Forest), City of Bothell, WA #0114.05.T001

Closed
0114.05.T001State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 562910
New
Theatre Mold Remediation Scope of Work
Solicitation # AT25-0006
Solicitation AT25-0006 is a subcontracting opportunity with Adams and Associates, Inc. for comprehensive mold remediation at Theatre Building 1086 of the Atterbury Job Corps Center in Edinburgh, Indiana. The project was initiated following a sprinkler system failure that caused significant water damage. The scope of work requires the remediation of the entire building, including cleaning visible mold and algae from concrete floors, CMU walls, and vinyl tiles, as well as the removal and replacement of affected drywall, gypsum wallboard, and acoustical tile ceiling finishes. Additionally, the contractor must perform dehumidification to maintain humidity levels at or below 50 percent and clean or replace damaged theater seating cushions. All work must adhere to EPA guidelines and the ANSI/IICRC S520 Standard for Professional Mold Remediation. The project requires the provision of a Certified Industrial Hygienist to verify materials and perform final clearance walkthroughs. Contractors must submit a single lump sum bid on company letterhead, including a detailed cost breakdown, a timeline for substantial completion, and proof of a valid Indiana Contractor's License. Evaluation is based on best value, with price weighted at 60 percent, quality at 20 percent, past performance at 10 percent, and schedule at 10 percent. Mandatory requirements include compliance with the Davis-Bacon Act wage determinations, specific automobile and workers compensation insurance limits, and the submission of a sequenced construction schedule within 10 days of the Notice to Proceed. Work must commence within 14 days of the Notice to Proceed, and payment is issued on Net 30 terms.
Atterbury Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 17 days
NAICS: 562910
New
Maui JCC Mold Remediation and Removal of Water-Damaged Materials
Solicitation # maui-jcc-mold-remediation-removal-water-damaged-materials
Management & Training Corporation (MTC) is soliciting bids for a fixed-price, single lump sum contract to perform mold remediation and removal of water-damaged materials at the Maui Job Corps Center in Makawao, Hawaii. The project focuses on Building 11, specifically the cafeteria, food service areas, and restrooms, which sustained significant water intrusion during a windstorm on August 15, 2026. The scope of work includes the removal of mold-affected porous materials such as drywall and ceiling tiles, the establishment of containment with HEPA-filtered negative air pressure, and the remediation of structural surfaces. The estimated contract value ranges from $25,000 to $100,000, with a required performance period of 30 consecutive business days following the Notice to Proceed. Bids will be evaluated based on overall best value. To be considered, bidders must conduct a mandatory physical site visit and submit a comprehensive proposal including a lump-sum bid, a detailed cost breakout, three comparable references, and proof of insurance. For bids of $25,000 or more, a bid bond guarantee of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety with at least an A- rating. The contract is set aside for small businesses, including VOSB, SDVOSB, WOSB, and HUBZone certifications. Awardees must comply with Davis-Bacon Act minimum wage rates, EPA guidance for mold remediation, and various Federal Acquisition Regulation clauses, including first-tier subcontractor reporting for awards over $40,000. Payment is based on an approved Schedule of Values via AIA documents, with a 10% retainage withheld until substantial completion.
Management & Training Corporation/Hawaii/Maui Job Corps Center

POSTED

about 3 hours ago

DEADLINE

in 1 day

AI Contract Overview

Show more

The City of Bothell is soliciting bids for the demolition and hazardous material abatement of nine existing structures across two parks: the former Wayne Golf Course Front and Back 9, and North Creek Forest. The project requires the safe removal and proper disposal of asbestos, lead-based paint, and other regulated contaminants found within these structures, with demolition activities strictly ordered by schedule—Schedule A at the golf course sites must be completed before work begins on Schedule B at North Creek Forest. All work must comply with local, state, and federal environmental and safety regulations to ensure worker and public health protections during and after removal operations. The project is limited to the designated sites within Bothell, with performance required at the 98011 zip code area. The solicitation, identified as 0114.05.T001, was posted on July 27, 2026, with responses due by July 29, 2026, at 10:00 PM Pacific Time. The contracting authority is the City of Bothell, Washington, with Aaron Milner as the designated point of contact for inquiries and submissions, reachable via email or phone. This procurement is not subject to any specific small business set-aside, and interested parties must submit proposals in accordance with the city’s procurement guidelines. All work must be performed within the timeline and scope defined by the contract, with no deviations permitted without written approval from the city.

General Info

Demolish and abate hazardous materials at two Bothell parks, following strict schedule and regulatory compliance.

Place of Performance

Bothell, WA, 98011, USA

Set-Aside

NONE

Documents

457

Addendum #1 - Page 1.jpg

JPG

Advertisement for Bids - Page 1.jpg

JPG

Advertisement for Bids - Page 2.jpg

JPG

Bid Tabulation - Page 1.jpg

JPG

Demolition Memo Reviews - Page 100.jpg

JPG

Demolition Memo Reviews - Page 101.jpg

JPG

Demolition Memo Reviews - Page 102.jpg

JPG

Demolition Memo Reviews - Page 103.jpg

JPG

Demolition Memo Reviews - Page 104.jpg

JPG

Demolition Memo Reviews - Page 105.jpg

JPG

Demolition Memo Reviews - Page 106.jpg

JPG

Demolition Memo Reviews - Page 107.jpg

JPG

Demolition Memo Reviews - Page 108.jpg

JPG

Demolition Memo Reviews - Page 109.jpg

JPG

Demolition Memo Reviews - Page 10.jpg

JPG

Demolition Memo Reviews - Page 11.jpg

JPG

Demolition Memo Reviews - Page 12.jpg

JPG

Demolition Memo Reviews - Page 13.jpg

JPG

Demolition Memo Reviews - Page 14.jpg

JPG

Demolition Memo Reviews - Page 15.jpg

JPG

Demolition Memo Reviews - Page 16.jpg

JPG

Demolition Memo Reviews - Page 17.jpg

JPG

Demolition Memo Reviews - Page 18.jpg

JPG

Demolition Memo Reviews - Page 19.jpg

JPG

Demolition Memo Reviews - Page 1.jpg

JPG

Demolition Memo Reviews - Page 20.jpg

JPG

Demolition Memo Reviews - Page 21.jpg

JPG

Demolition Memo Reviews - Page 22.jpg

JPG

Demolition Memo Reviews - Page 23.jpg

JPG

Demolition Memo Reviews - Page 24.jpg

JPG

Demolition Memo Reviews - Page 25.jpg

JPG

Demolition Memo Reviews - Page 26.jpg

JPG

Demolition Memo Reviews - Page 27.jpg

JPG

Demolition Memo Reviews - Page 28.jpg

JPG

Demolition Memo Reviews - Page 29.jpg

JPG

Demolition Memo Reviews - Page 2.jpg

JPG

Demolition Memo Reviews - Page 30.jpg

JPG

Demolition Memo Reviews - Page 31.jpg

JPG

Demolition Memo Reviews - Page 32.jpg

JPG

Demolition Memo Reviews - Page 33.jpg

JPG

Demolition Memo Reviews - Page 34.jpg

JPG

Demolition Memo Reviews - Page 35.jpg

JPG

Demolition Memo Reviews - Page 36.jpg

JPG

Demolition Memo Reviews - Page 37.jpg

JPG

Demolition Memo Reviews - Page 38.jpg

JPG

Demolition Memo Reviews - Page 39.jpg

JPG

Demolition Memo Reviews - Page 3.jpg

JPG

Demolition Memo Reviews - Page 40.jpg

JPG

Demolition Memo Reviews - Page 41.jpg

JPG

Demolition Memo Reviews - Page 42.jpg

JPG

AI Contract Breakdown

Uniform Contract Format

Contract not broken down yet

CLEATUS splits the solicitation into Uniform Contract Format (UCF) sections: scope, pricing, deliverables, and evaluation criteria.

Timeline

PhaseClosed
Response Deadline

Deadline has passed

Posted

Solicitation

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyWashington → City of Bothell
Contacts1 person available
OfficeN/A
Organization / AgencyWashington → City of Bothell
Office AddressN/A

Interested Companies (10)

Always Active ServicesSEATTLE, WA
Wyser ConstructionSnohomish, WA

See All 10 Interested Companies

Start a free trial to view all interested companies, their contact details, and full contractor profiles.

Start Free Trial

Full Description

Show more
The Bothell Parks Structures Demolition and Abatement Project proposes to demolish 9 existing structures, and the removal and proper disposal of hazardous materials found within existing structures at two Bothell City Parks. The project is divided into two schedules, schedules A (Former Wayne Golf Course Front and Back 9), and B (North Creek Forest) Demolition priorities are identified in the following order: Schedule A then Schedule B.

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS