Parking Improvements at Windmill Park
Contract Overview
Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.
AI Contract Overview
Banks County Government is soliciting bids for parking improvements at Windmill Park in Homer, Georgia, with all proposals due by 2:00 p.m. on Friday, August 28, 2026, at the Board of Commissioners Office located at 150 Hudson Ridge. The project includes a comprehensive range of site improvements such as approximately 320 tons of 9.5 mm asphalt and 480 tons of 12.5 mm asphalt, 4,300 square yards of 6-inch graded aggregate base course, 890 linear feet of 6-inch by 24-inch curb and gutter, and 880 square yards of 4-inch concrete sidewalk. Stormwater management components consist of 220 linear feet of 18-inch HDPE storm drain, 200 linear feet of 24-inch HDPE storm drain, 44 linear feet of 18-inch RCP storm drain, two 24-inch concrete headwalls, two grate top drop inlets, one manhole, and one junction box. Additional work includes 200 square yards of Type 3 rip rap, 3,300 linear feet of 5-inch white pavement striping, 240 linear feet of 5-inch yellow pavement striping, 40 linear feet of 24-inch pavement striping, pavement markings, roadway and parking lot signage, mass grading, and erosion and traffic control measures. All work must be completed within 30 consecutive calendar days after receipt of a written Notice to Proceed, and a bid bond is mandatory with each proposal. Complete contract documents, specifications, and construction drawings are available by contacting Kurt Kirby, Director of Parks and Recreation, via email at kkirby@co.banks.ga.us or by phone at (706) 677-4407.
General Info
Agency
NAICS
Place of Performance
GA, USASet-Aside
Documents
(2)AI Contract Breakdown
Uniform Contract FormatWhat is UCF?
Uniform Contract Format (UCF) uses AI to break down any contract into standardized sections—scope, pricing, deliverables, and evaluation criteria.
Timeline
Response Deadline
Organization & Contact Information
Full Description
The Project consists of, but is not limited to the following major elements:
Approximately 320 Tons of 9.5 mm Asphalt, 480 Tons of 12.5 mm Asphalt, 4,300 SY of 6-inch Graded Aggregate Base Course, 890 LF of 6-Inch x 24-Inch Curb & Gutter, 880 SY of 4-Inch Concrete Sidewalk, 220 LF of 18-Inch HDPE Storm Drain, 200 LF of 24- Inch HDPE Storm Drain, 44 LF of 18-Inch RCP Storm Drain, (2) 24-Inch Concrete Headwalls, (2) Grate Top Drop Inlets, (1) Manhole, (1) Junction Box, 200 SY of Type 3 Rip Rap, 3,300 LF of 5-inch White Pavement Striping, 240 LF of 5-inch Yellow Pavement Striping, 40 LF of 24-inch Pavement Striping, Pavement Markings, Roadway and Parking Lot Signage, Mass Grading, Traffic and Erosion Control Measures.
Time of completion for all work associated with this project shall be thirty (30) consecutive calendar days from the date of a written "Notice to Proceed" from OWNER. A Bid Bond will be required with proposal submission.
Copies of Contract Documents, Specifications, and Construction Drawings may be obtained by contacting the Director of Parks and Recreation, Kurt Kirby, at 607 Thompson Street, Homer, Georgia 3054, by email at kkirby@co.banks.ga.us, or by phone at (706) 677-4407.