Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, September 16 at 2:00 PM EDT

Register Free →

This Combined Synopsis/Solicitation opportunity from Department Of Homeland Security was posted on July 27, 2026. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Parking Lot Painting Renewal – USCG Base New Orleans

Closed
70Z02926QNEWO00350Federal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 237310
New
Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment
Solicitation # HD-S3135
Kiewit Infrastructure West Co. is soliciting quotes from qualified SBE, VSBE, and DBE firms for the Pier B On-Dock Rail Support Facility West Expansion and Pier B Street Realignment project in Long Beach, California. The scope of work is extensive, covering heavy civil and infrastructure activities including site preparation, asbestos abatement, tunneling, underground piping, asphalt and concrete paving, electrical systems, and telecommunications. Interested firms must provide evidence of certification through the Department of General Services and the Port of Long Beach PlanetBids portal. Bidders are required to hold a valid California Contractor's license, provide acceptable insurance, and may be required to provide bonding for 100 percent of their contract value, with bond premiums reimbursed by Kiewit. The project is subject to a Project Labor Agreement, prevailing wage rates, and the California Labor Code. Firms performing onsite work must be signatory to collective bargaining agreements with specific trades, including carpenters, laborers, cement masons, ironworkers, operating engineers, and teamsters. Funding is provided through multiple grants, including the FHWA, LACMTA, the State of California Transportation Agency, and the U.S. DOT MARAD 2021 Port Infrastructure Development Program, necessitating compliance with DBE Program requirements. Interested parties must contact Lead Estimator Cassandra Shore to receive an Invitation to Bid via the BuildingConnected system, with a response deadline of September 15, 2026.
Kiewit Infrastructure West Co.

POSTED

about 9 hours ago

DEADLINE

in 3 days
NAICS: 237310
New
SLED
NH-093-1(035) Farrington Highway Widening
Solicitation # B27000387
The Farrington Highway Widening project, solicitation B27000387, is an invitation for bids issued by the Hawaii Department of Transportation to develop an auxiliary lane between Nanakuli Avenue and Mohihi Street in the District of Ewa, Oahu. The scope of work includes excavation, cold-planing, paving, striping, signage, drainage structure modifications, and the installation of retaining walls. The estimated construction cost is between 35 million and 37 million dollars, with a performance period of 780 calendar days from the start work date. Bidders must hold a valid State of Hawaii General Engineering A license and submit their proposals via HiePRO by October 28, 2026. The contract will be awarded to the lowest responsible and responsive bidder based on the summation of unit bid prices and approximate quantities. Key requirements include the submission of a surety bid bond for proposals exceeding 25,000 dollars, as well as performance and labor and material payment bonds. The project adheres to federal and state regulations, including the Davis-Bacon Act, the Build America, Buy America Act, and Hawaii Revised Statutes Chapter 103D. Contractors are required to comply with strict prompt payment terms, paying subcontractors within 10 calendar days of receiving progress payments from the agency. Final acceptance is determined by the Engineer based on full compliance with contract documents, including specific quality standards for pavement smoothness and compaction.
Department of Transportation

POSTED

about 15 hours ago

DEADLINE

in about 2 months
NAICS: 237310
New
SLED
ACADEMY OF RICHMOND COUNTY PARKING LOT PAVEMENT REPAIR and STRIPING
Solicitation # 26-214
The Richmond County Board of Education has issued RFP 26-214 for turnkey pavement repair and striping services at the Academy of Richmond County, located at 910 Russel St., Augusta, Georgia. The scope of work includes patching designated areas to match existing pavement, installing curb and gutter to enclose grease trap access manholes, and performing line striping. Specific technical requirements include the use of 3,000 FSI concrete with a fine broom finish, 98% compacted subgrade, and MPI #32 alkyd traffic-marking paint. All new striping and hatching must be yellow, while stop bars and existing crosswalks must be recoated in white, adhering to Georgia DOT Construction Standards. Asphalt top courses must cure for at least 14 days before painting. The contract will be awarded to the lowest responsible and responsive bidder, with an anticipated award date of October 20, 2026. Sealed bids are due by 3:00 PM on October 7, 2026, and must include turnkey pricing, a project lead time, company references, and a signed Sex Offender Acknowledgement Form. Contractors must maintain commercial general liability insurance of 2 million dollars and worker's compensation insurance of 1 million dollars. Compliance with Georgia state laws is mandatory, including E-Verify affidavits, periodic criminal history record inquiries under O.C.G.A. 35-3-34, and adherence to a smoke-free environment on school property. All work coordination and deliveries must be cleared through David Perry.
Richmond County Board of Education

POSTED

about 20 hours ago

DEADLINE

in 25 days

AI Contract Overview

Show more

The United States Coast Guard Base New Orleans is seeking a contractor to renew painted surfaces across its parking facility, encompassing approximately 260 standard parking spaces, eight ADA-compliant accessible spaces with stenciled markings, 37 GV Parking spaces, and various curb segments including red and white curbs with “No Parking” stencils, four fire hydrant curbs, and two pedestrian crosswalks. All work must adhere to the Manual on Uniform Traffic Control Devices and Americans with Disabilities Act standards for accessibility and signage. The contractor is responsible for providing all labor, materials, tools, equipment, transportation, and supervision necessary to complete the project, with strict compliance to OSHA safety regulations including implementation of a safety program, use of barricades, signs, and signal lights. Any hot work such as welding or grinding requires a permit and at least 48 hours of advance notification to the Contracting Officer’s Representative. Environmental compliance is mandatory under the Resource Conservation and Recovery Act, requiring all hazardous waste to be properly manifested off-site with the base listed as generator, and all chemicals to be preapproved with Safety Data Sheets submitted. No waste may be disposed of in onsite dumpsters, and storm drains must be protected at all times. Work must occur Monday through Friday between 8:00 AM and 4:00 PM, excluding federal holidays, with no use of telephone services permitted, though electrical power and water may be used. The contractor must restore the site daily and upon completion, and any damage to government property must be repaired at no cost to the government. Personnel must remain within designated work areas, abide by base regulations, and restrict smoking to designated zones. A mandatory site visit is required prior to quote submission, coordinated with CWO Mike Ackiss, and all personnel lacking a TWIC, military, or preapproved ID must provide their full name at least five business days in advance for security badge processing. Quotes must be submitted via email to Daniel Galarza by August 10, 2026. Award will be made using the lowest price technically acceptable method, with evaluation based on price, technical acceptability, and past performance. The contract is a total small business set-aside under NAICS code 237310. The contractor must ensure all installation, workmanship, and testing meet OSHA, EPA, and Louisiana state regulations, and must obtain environmental approval from Base New Orleans prior to commencing work.

General Info

Paint parking lot surfaces per DOT and ADA standards with full compliance, safety, and environmental requirements.

Agency

Department Of Homeland Security → Base New ORLEANS(00029)View Agency

NAICS

237310 - Highway, Street, and Bridge ConstructionView NAICS

Place of Performance

New Orleans, LA, 70129, USA

Set-Aside

SBA

Documents

(5)

SF1442 Construction Solicitation and Award

PDFifb

Construction Clauses Incorporated by Reference and Full Text

PDFclauses

Base+New+Olreans+overhead+view.png

PNG

Wage Determination LA20260041 for Louisiana Building Construction

TXTwage-determination

Renew Parking Lot Painting PWS at USCG Base New Orleans

DOCXsow

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseClosed
Posted

Combined Synopsis

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyDepartment Of Homeland Security → Base New ORLEANS(00029)
Contacts2 people available
OfficeNEW ORLEANS, LA, 70117, USA
Organization / Agency
Department Of Homeland Security → Base New ORLEANS(00029)
View Agency Profile
Office AddressNEW ORLEANS, LA, 70117, USA

Full Description

Show more

The United States Coast Guard Base New Orleans, located at 1790 Saturn Blvd, New Orleans, LA 70129, requires a contractor to renew all painted surfaces in the parking lots in accordance with the attached Statement of Work. The contractor shall furnish all labor, tools, materials, transportation, equipment, supervision, and personnel necessary to complete the project. Work includes repainting approximately 260 standard parking spaces, 8 handicap accessible spaces with stenciled placarding, 37 stenciled “GV Parking” spaces, one red painted curb with “No Parking” stencil at the Fire Pump (approximately 120 linear feet), one white painted curb at the main entrance (approximately 40 linear feet), four curbs in front of fire hydrants painted red with “No Parking” stenciled, and renewal of two pedestrian crosswalks totaling approximately 50 linear feet. All work must comply with the Federal Highway Administration Manual on Uniform Traffic Control Devices (MUTCD) and Americans with Disabilities Act (ADA) standards for accessible spaces. The contractor is responsible for site safety and must implement a safety program in accordance with OSHA regulations, including appropriate barricades, signs, and signal lights. Any “Hot Work” operations such as welding, cutting, brazing, grinding, or any activity that could produce sparks or heat require a permit and at least 48 hours advance notification to the Contracting Officer’s Representative (COR).


Environmental compliance is required; all waste generated must be recycled or disposed of in accordance with the Resource Conservation and Recovery Act (RCRA) and all applicable federal, state, and local laws. Hazardous waste must be manifested off site with Base New Orleans listed as the generator and signatory. No waste or recycling may be disposed of in onsite dumpsters, and all chemicals must be preapproved by the contract POC with Safety Data Sheets (SDS) provided. Storm drains and waterways within range of potential discharge must be protected by covers or silt fence, and nothing may be discharged to a storm drain at any time during the project. The contractor must restore the site to a clean condition at the end of each workday and upon completion of the project, with final acceptance contingent on approval by the COR.


All work must be scheduled to minimize disruption to facility operations and performed between 8:00 AM and 4:00 PM, Monday through Friday, excluding federal holidays, unless otherwise approved by the Contracting Officer or their representative. The contractor will be permitted to use available electrical power and water, but not telephone services. Restroom facilities are available. Any damage to government property caused by the contractor must be repaired or replaced at no cost to the government. The contractor must comply with all base regulations, and personnel must remain within the designated work area unless otherwise required for performance of duties. Smoking is prohibited in Coast Guard buildings and must be restricted to designated areas.


mandatory site visit is Mandatory prior to submitting a quote. Site visits must be scheduled with the Contracting Officer’s Representative (COR), CWO Mike Ackiss, at carlton.m.ackiss@uscg.mil. Any personnel without a TWIC, military, or prior approved ID must provide their first and last name at least five business days prior to arrival to allow for security badge creation and base access. The contractor must submit a detailed work schedule, report of findings, quote for further repair as needed, and Safety Data Sheets for all hazardous materials to the COR and obtain approval from Base New Orleans Environmental Protection prior to beginning work. All installation, workmanship, fabrication, assembly, inspection, and testing must comply with OSHA standards and all applicable federal, EPA, and State of Louisiana laws and regulations.


Award method will be lowest price technically acceptable. The evaluation factors are:


  • Price
  • Technical Acceptability
  • Past Performance

The Government will evaluate the past performance of each offeror to determine the degree of confidence that the offeror will successfully perform the contract requirements. Evaluation will consider the relevance, quality, and timeliness of prior work as demonstrated through submitted references and independent government sources. Offerors with no relevant past performance will receive a neutral rating. Past performance will be rated and factored into the overall evaluation as specified in the solicitation.

Offerors, if they wish, can also provide information on problems encountered on the identified contracts and the offeror’s corrective actions. The Government shall consider this information, as well as information obtained from any other sources, when evaluating the offeror’s past performance. The source selection authority shall determine the relevance of similar past performance information.


All quotes must be submitted to: daniel.galarza@uscg.mil


IF A SITE VISIT IS MANDATORY, THE FOLLOWING CLAUSES APPLY:


  • FAR 52.236-2 Differing Site Conditions. Apr 1984
  • FAR 52.236-3 Site Investigation and Conditions Affecting the Work. Apr 1984
  • FAR 52.236-27 Site Visit (Construction). Feb 1995

52.236-27 Site Visit (Construction) (Feb 1995):
(a) The clauses at 52.236-2, Differing Site Conditions, and 52.236-3, Site Investigations and Conditions Affecting the Work, will be included in any contract awarded as a result of this solicitation. Accordingly, quoters are urged and expected to inspect the site where the work will be performed.
(b) Site visits may be arranged during normal duty hours by contacting:
Name: CWO Mike Ackiss
Address: USCG Base New Orleans, 1790 Saturn Blvd, New Orleans, LA 70129
Email: carlton.m.ackiss@uscg.mil

More opportunities from Department Of Homeland Security → Base New ORLEANS(00029)

Same awarding agency

NAICS: 238220
New
Federal
Remove and replace commercial water heaters
Solicitation # 37160Q260000027
Solicitation 37160Q260000027 is a Request for Quotation for a Firm-Fixed Price construction contract to remove and replace three commercial water heaters and associated plumbing components at U.S. Coast Guard Station Dauphin Island in Alabama. The scope of work includes the replacement of two 120-gallon water heaters and a 14-gallon thermal expansion tank in the utility room, as well as one 85-gallon water heater in the kitchen utility closet. The contractor is responsible for providing all labor, commercial-grade materials, and equipment, including the replacement of mixing valves, pumps, and piping, and the lawful disposal of all removed debris. The project must be completed within a 30-day performance period, and the contractor must provide a temporary hot water source if service is unavailable for more than 24 consecutive hours. This procurement is a total small business set-aside under NAICS code 238220. Award will be based on the lowest price, technical acceptability, and past performance. Interested offerors must be registered in the System for Award Management and are strongly encouraged to conduct a site visit coordinated through the Contracting Officer Representative. All quotes and written inquiries must be submitted by 3:00 pm CST on September 17, 2026. The contract adheres to FAR Part 36 and includes specific requirements for domestic construction materials, Department of Labor wage rates, and compliance with national electrical and plumbing codes.
Plumbing, Heating, and Air-Conditioning Contractors

POSTED

1 day ago

DEADLINE

in 5 days
View Details
NAICS: 238290
Federal
Repair & Perform A 1-For-1 In-Kind Replacement of Elevator Equipment at USCG Base New Orleans
Solicitation # 70Z02926QNEWO432
The United States Coast Guard is seeking proposals for a firm-fixed price contract to perform a 1-for-1 in-kind replacement of elevator equipment at Base New Orleans, located at 1790 Saturn Blvd, New Orleans, LA. The project involves replacing obsolete ThyssenKrupp TAC20 hydraulic ram equipment with non-proprietary microprocessor-based controllers and hydraulic power equipment to ensure service continuity. All work must be performed by a state-licensed contractor in accordance with ASME A17.1/CSA B44 safety codes, OSHA regulations, and ADA requirements. A mandatory site visit is required prior to submitting a quote to verify existing conditions and take field measurements. This acquisition is a total small business set-aside under NAICS code 238290, requiring active registration in SAM.gov. Award will be made to the lowest priced technically acceptable offer, with evaluations based on price, technical approach, and past performance. The contractor must adhere to Davis-Bacon Act wage determinations for Orleans Parish and follow a strict performance timeline, including providing submittals within 7 days of award and completing the project within 15 days of commencing work. Final acceptance is contingent upon a successful code compliance inspection, the issuance of a certificate of operation, and approval of the job site appearance by the Contracting Officer's Representative.
Other Building Equipment Contractors

POSTED

12 days ago

DEADLINE

in 3 days
View Details

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 650+ contractors already using CLEATUS