Partially Grouted Rock Slope Protection (PGPSP) Contractor

Open
State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

General Info

Documents

This scope was carved out of 04-2J88U4.

The full solicitation package (4 documents), including the RFP, is on the prime solicitation, not on this scope.

View the prime solicitation

Bridge scour repair.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

Posted

subcontract

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Get full access to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia Department of Transportation
ContactsNo contacts available
OfficeN/A
Office AddressN/A
ContactsNo contact information available

Full Description

Show more
Installs rock slope protection for prime contractors on Caltrans bridge projects. Places Partially Grouted Rock Slope Protection (PGPSP) in predetermined stages and fills voids with PGPSP void filler using grouting equipment per 2025 Standard Plans and Specifications. Delivers installed PGPSP system at the bridge channel.

Similar Contracts

Same NAICS industry code

NAICS: 238990
New
SLED
Virginia Zoo - Africa Boardwalk Repairs
Solicitation # 24051
The City of Norfolk Department of Public Works is soliciting lump sum bids for Project 24051, involving repairs to the Africa Boardwalk at the Virginia Zoo located at 3500 Granby Street, Norfolk, VA. The scope of work includes structure demolition and the installation of composite decking, to be executed in phases. All work must comply with the International Building Code 2011, Virginia building codes, and the VirginiaZoo_AfricaWalk_PME Set_260603 plan set. The project must be substantially completed within 445 consecutive calendar days from the receipt of the Notice to Proceed. Bids are due by 4:00 PM on November 12, 2026, and must be submitted electronically via the designated procurement portal. Bidders are required to provide a 5% bid bond, and the successful contractor must furnish performance and payment bonds each totaling 100% of the construction price. Award will be granted to the lowest responsive and responsible bidder, with evaluations focusing on non-collusion compliance, debarment status, and criminal history. Bidders must be authorized to transact business in the Commonwealth of Virginia and provide their Virginia Contractor Registration Class and Number. Contractors are responsible for providing quality-control services and submitting a quality-control plan within 10 days of the Notice of Award. The project mandates strict adherence to packaging and storage standards to prevent material deterioration and requires compliance with ADA-ABA Accessibility Guidelines for temporary egress. Requests for Information must be submitted through the questions portal no later than 4:00 PM on October 19, 2026.
Public Works (D&C)

POSTED

about 5 hours ago

DEADLINE

in 24 days
View Details

More opportunities from California Department of Transportation

Same awarding agency

NAICS: 237310
New
SLED
Paving, cold plane AC pavement, drainage, and delineation.
Solicitation # 01-0J9304
The California Department of Transportation has issued solicitation 01-0J9304 for a project involving paving, cold plane AC pavement, drainage, and delineation located in Lake County on Route 29 and 53. With an estimated value of 14.4 million dollars, this cost-plus-time contract requires bids to be submitted via the Bid Express website with a security deposit of at least 10 percent of the bid. Contractors must propose a performance period between 100 and 140 working days. The project includes strict environmental and quality mandates, such as the implementation of Best Management Practices to protect water quality and mandatory equipment pressure washing at 140 degrees Fahrenheit and 800 psi to prevent the spread of soil-borne pathogens. Technical requirements include adherence to MASH Test Level 3 for temporary barrier systems and specific ACI Concrete Field-Testing Technician Grade 1 certifications for quality control personnel. The project is subject to the Davis-Bacon Act, Build America Buy America standards, and requires the submission of DVBE quotes. Safety representatives must hold Cal/OSHA or OSHA 510 certifications along with valid first aid and CPR certifications. Payment terms mandate that subcontractors be paid within 7 days of progress payments, while material suppliers must be paid within 30 days. Performance is supported by digital terrain models, alignments, and profiles provided in LandXML and DGN formats.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in about 2 months
View Details
NAICS: 237310
New
SLED
Bridge scour repair.
Solicitation # 04-2J88U4
The California Department of Transportation is soliciting bids for bridge scour repair at the No Name Creek Bridge on a state highway in Napa County near Calistoga. The scope of work involves protecting the existing culvert, repairing scour holes at exposed footings using shotcrete, and excavating the channel streambed to final grade. Key technical requirements include the installation of Partially Grouted Rock Slope Protection (PGPSP) with void filler, repairing exposed rebar soffit spalls via structural concrete bridge repair, and grouting voids behind and under culvert walls. All work must adhere to the 2017 AASHTO LRFD Bridge Design Specifications with California Amendments and the 2025 Standard Plans and Specifications. The project is estimated to take 80 working days, with a strict environmental restriction limiting work within creek channels to the period between June 15 and October 15. Contractors must provide a baseline schedule and weekly reports, and quality control personnel must hold an ACI Concrete Field-Testing Technician, Grade 1 certification. The contract mandates a 5 percent goal for both Small Business Enterprise (SBE) and Disabled Veteran Business Enterprise (DVBE) participation. Bids must include a security deposit of at least 10 percent of the bid amount. Payment is managed through the Department's prompt payment monitoring system, requiring material suppliers to be paid within 30 days of progress payments.
Highway, Street, and Bridge Construction

POSTED

1 day ago

DEADLINE

in about 1 month
View Details
NAICS: 237310
SLED
Construction On State Highway In Alameda County In Berkeley And Albany From Heinz Avenue To 0.1 Mile South Of Contra Costa County Line
Solicitation # 04-2Y3014
Solicitation 04-2Y3014 is a construction project issued by the California Department of Transportation for work on State Highway 123 in Alameda County, specifically within Berkeley and Albany from Heinz Avenue to 0.1 mile south of the Contra Costa County Line. With an estimated value of 22 million dollars, the project scope encompasses comprehensive infrastructure improvements including the construction of sidewalks, curb ramps, asphalt and concrete pavement, and the installation of electrical and drainage systems. Additional requirements include earthwork involving barium contaminated soil, landscape planting, erosion control, and the installation of site furnishings such as bus shelters, bike racks, and trash receptacles. The project also necessitates a robust traffic control system, temporary barrier systems, and the implementation of a Lead Compliance Plan and a Stormwater Pollution Prevention Plan. Bids must be submitted on a unit price basis by December 16, 2026, and must include bidder's security equal to at least 10 percent of the bid. The contract mandates compliance with Buy America standards, prevailing wage rates, and specific environmental product declarations for asphalt and concrete. Performance requires a Level 2 Critical Path Method schedule and the designation of a certified on-site safety representative. Contractors must coordinate with various utility owners including PG&E, AT&T, Comcast, and EBMUD, and obtain necessary encroachment permits from the cities of Berkeley and Albany. Job site activities are expected to commence within 55 days of contract approval by the Attorney General.
Highway, Street, and Bridge Construction

POSTED

8 days ago

DEADLINE

in about 1 month
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS