Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

This Sources Sought opportunity was posted on June 13, 2016. The submission period has ended. Browse the details below for market research, or find similar active opportunities.

Partnership Opportunity Document For a NASA Goddard Space Flight Center (GSFC) Infrared Telescope

Closed
NASA-GSFC-POD-INFRARED-TELESCOPEFederal

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

Active Opportunities Like This One

NAICS: 336419
Federal
Weapons Shipping Harness Refurbishment Blanket Purchase Agreement
Solicitation # N6278927Q0001
Solicitation N6278927Q0001 is a request for quotes to establish a multiple award Blanket Purchase Agreement (BPA) for the refurbishment of SSN 688 class weapon shipping harnesses to support waterfront submarines at SUBASE New London in Groton, Connecticut. The scope of work includes the complete disassembly, refurbishment of all parts, reassembly, NDT testing, painting, and weight testing of these safety-critical tactical handling gear in accordance with NAVSEA specifications and strict naval nuclear safety standards. The BPA will have a five-year period of performance from January 27, 2027, to January 26, 2032, with a total ceiling of 500,000 USD and a per-call limit of 100,000 USD. Individual requirements will be competed among BPA holders based on the most advantageous quote. Awards will be made based on best value, evaluating technical qualifications and the ability to meet schedules, past performance, and price. Offerors must provide at least three references from the last three years and a description of their property management system. The procurement is not a small business set-aside and is limited to sources capable of meeting specialized military design and safety standards. Quotations are due by 4:00 PM EST on December 3, 2026, and must be submitted electronically. Contractors are required to use the Wide Area Workflow system for invoicing and must comply with CMMC cybersecurity requirements and SAM registration.
Supply Of Shipbuilding Groton

POSTED

9 days ago

DEADLINE

in about 1 month
NAICS: 336419
DIBBS
FLANGE, PIPE
Solicitation # SPE7M4-27-T-0838
Solicitation SPE7M4-27-T-0838, issued by the DLA Weapons Support Fluid Handling Division, is a request for quotations for eight 5-inch pipe flanges (NSN 4730-01-313-2154). The procurement is conducted under full and open competition with a need ship date of April 6, 2027, and a final required delivery date of May 2, 2027. Delivery is set as FOB Origin, with the destination being DLA Distribution San Joaquin in Tracy, California. The items are designated as critical application items and must adhere to specific technical drawings and specifications, including MIL-PRF-20042G. The contract imposes strict quality and environmental standards, requiring the manufacturer's inspection system to comply with SAE AS9003 or ISO 9001. Sampling must follow MIL-STD-1916 or ASQ H1331, with a zero-nonconformance requirement for acceptance. Prohibitions are in place regarding the use of Class I ozone-depleting chemicals and the intentional addition of mercury. Packaging and marking must comply with MIL-STD-2073-1E and MIL-STD-129, while palletization must follow DLA requirement RP001. Administrative requirements include electronic invoicing via Wide Area WorkFlow (WAWF) and compliance with various FAR and DFARS clauses, including the Buy American Act and the Berry Amendment. Cybersecurity compliance is mandatory, specifically referencing CMMC Level 2 and DFARS 252.204-7012 for safeguarding covered defense information. Additionally, a price evaluation preference is available for certified HUBZone Small Business Concerns.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

9 days ago

DEADLINE

in 1 day
NAICS: 336419
DIBBS
NIPPLE, PIPE
Solicitation # SPE7M3-27-T-0303
Solicitation SPE7M3-27-T-0303 is a request for quotations issued by the DLA Weapons Support Fluid Handling Division for the procurement of 674 copper alloy pipe nipples, identified by NSN 4730011152648. The items must be manufactured in accordance with ASTM B687 and are designated as critical application items. The contract prohibits the use of Class I ozone depleting chemicals and explicitly excludes any items produced via additive manufacturing processes. Delivery is required within 164 days after order, with an original required delivery date of March 17, 2027, and a need ship date of April 6, 2027. Shipping is FOB Origin, with the destination for inspection and acceptance located at DLA Distribution San Joaquin in Tracy, California. The procurement is subject to various federal regulations, including the Buy American Act and the Berry Amendment. Packaging must comply with ASTM D3951 and MIL-STD-129, while palletization must follow DLA requirement RP001. Quality assurance is managed through Certificate of Conformance procedures per FAR 52.246-15. Invoicing and payment are to be processed electronically via the Wide Area WorkFlow system. The solicitation is open to full and open competition, with a specific price evaluation preference provided for certified HUBZone small business concerns. Administrative contact for this requirement is William Cain.
DLA WEAPONS SUPPORT FLUID HANDLING DIVISION

POSTED

9 days ago

DEADLINE

in 1 day
NAICS: 336419
Federal
DRAFT STATEMENT OF WORK FOR REVIEW: BQM-34S Engine Repair, Overhaul and Conversion
Solicitation # RFI-N00019-242-25-076-SN
The Naval Air Systems Command is seeking industry feedback on a draft Statement of Work for the repair, overhaul, and conversion of J85-GE-5 and J85-GE-100A engines. This effort supports the United States Navy BQM-34S Subsonic Aerial Target under the Strengthen Target Inventory New Growth (STING) program. The scope of work includes performing Test, Teardown and Evaluation to return assets to Ready-for-Issue condition, executing repairs on J85-GE-100A engines, and converting J85-GE-5 engines into J85-GE-100A configurations. All work must be performed in accordance with Technical Manual 01-J85-2 and PPC50, with finished engines expected to have a service life of 10 to 15 operating hours. Key deliverables include TT&E results, performance evaluation results, and monthly progress reports. The contractor is responsible for all quality inspections, test cell verification, and packaging using government-furnished storage containers marked per MIL-STD-129. Security requirements are stringent, requiring personnel to be eligible for Non-Critical Sensitive work via a Tier-3 investigation and adherence to NIST SP 800-171 Rev 2 and CMMC Level 2 cybersecurity standards. Additionally, contractors must comply with DFARS 252.204-7012 for safeguarding covered defense information. This is currently a request for information, and feedback must be submitted to the contracting office by October 23, 2026.
Naval Air Systems Command

POSTED

13 days ago

DEADLINE

in 1 day

General Info

Agency

N/A

NAICS

336419 - Other Guided Missile and Space Vehicle Parts and Auxiliary Equipment Manufacturing

Place of Performance

Not specified

Set-Aside

NONE

Documents

0

No documents available

Documents will appear here when they are available.

AI Contract Breakdown

Uniform Contract Format

No documents to break down

The breakdown needs solicitation documents. None were found from this contract's source.

Timeline

PhaseClosed
Posted

Sources Sought

Response Deadline

Deadline has passed

Submission Closed

Find active opportunities like this

Start your free trial to discover similar active contracts, track opportunities, and build proposals with AI assistance.

Organization & Contact Information

Show more
AgencyN/A
Contacts2 people available
OfficeN/A
Organization / Agency
N/A
Office AddressN/A

Full Description

Show more
Partnership Opportunity Document for a NASA Goddard Space Flight Center (GSFC) Infrared Telescope 1.0 INTRODUCTION/SCOPE This proposal opportunity is in response to a NASA Announcement of Opportunity (AO) for a Astrophysics MIDEX anticipated to be released late summer 2016. NASA's Goddard Space Flight Center (GSFC) is developing a mission concept to be proposed for this AO. The partnership opportunity is being issued to select a teaming partner to provide an Infrared Telescope (IRT). The proposed mission is currently in pre-Phase A. If the proposal is down-selected, the next step in the proposal process is a mission concept study culminating in a Concept Study Report (CSR), which is the Step 2 proposal, and a Site Visit. The following schedule should be used as a basis for responses to this opportunity: Release of draft AO: Spring/Summer 2016 (target) Release of final AO: Late summer/early fall 2016 (target) Pre-proposal conference: ~ 3 weeks after final AO release Step 1 Proposals due: 90 days after AO release Selection for competitive Phase A studies: Summer 2017 (target) CSRs due: Summer 2018 (target) Down-selection: Early 2019 (target) IRT start date: Vendor specified Instrument Delivery: 20 months after start of Phase B (1/2019) Launch: (NLT 12/31/2024) 1.1 COST Total cost and cost fidelity are important issues for the proposal. The cost cap for this AO is $250M, excluding launch vehicle. This cost includes the instruments, spacecraft, instrument to spacecraft integration support, environmental testing, launch site operations, and mission and science operations for a minimum of 3 years (goal - 5 years), as well as required contingency (>25%). The Phase A mission concept study (Step 2 down-selection) has a total cost cap of $1M for all partners. There will be no exchange of funds between the teaming partners for the portion of this partnership opportunity dealing with the preparation of the initial submission (Pre-Phase A, Step 1 proposal). Funding will be available for subsequent phases should the candidate mission concept be competitively selected for those additional phases. 1.2 DESIRED MISSION SERVICES GSFC is interested in selecting a partner to provide an IRT. All interested parties are required to respond to this POD in accordance with Section 5 below. 1.3 PROPOSAL SUPPORT It is expected that the selected POD respondent will provide support using their own resources to help develop the required MIDEX proposal elements in response to the Step 1 Pre-Phase A NASA MIDEX AO in the area of the IRT. If the proposal is down-selected for a Phase A Mission Concept Study, this will consist of a one-year concept study phase culminating in a Mission Concept Study Report (Step 2 proposal) and on-site support of a Site Visit. Partial funding will be provided to the partner for this Phase A mission concept study support, Mission CSR, and Site Visit. If the mission is selected for implementation (Phases B-F), the partner will be responsible for the design and development of the IRT. Respondents to this POD shall state the timeframe that their services will be available and the extent that the respondent can meet the timeline requirements set forth in the AO. 2.0 MISSION OVERVIEW The Astrophysics Explorer Program conducts Principal Investigator (PI)-led space science investigations to advance NASA's strategic goals in astrophysics, which are to discover the origin, structure, evolution, and destiny of the Universe and search for Earth-like planets. More detailed information on the parameters of the potential GSFC mission will be provided to those responding with a Notice of Interest (NOI) to this POD. A Notice of Interest (it is intentionally not called a notice of intent) does not obligate an organization to provide a POD response. 3.0 PRE-SELECTION SUPPORT 3.1 INITIAL PROPOSAL SUPPORT SOW: It is expected that the selected respondent will provide support using their own resources to help develop and write the Mission concept proposal in response to the AO in the area of the IRT. This will involve meeting with the relevant scientists and the overall mission engineering team in order to: (1) help define the end-to-end performance requirements, including interfaces to the IRT detector module; (2) identify trade studies associated with the IRT; and (4) predict performance and quantify risks. This will include cost estimation for all mission phases. The period of performance for this interval is expected to last from partner selection until the submission of the initial proposal. 3.2 PHASE A STUDY AND PHASE A PROPOSAL SUPPORT SOW: If the mission is selected for a Phase A study, the proposal team will receive funds to conduct a Phase A study and submit a detailed CSR to NASA. The selected partner will be allocated a portion of this funding to assist in completing the CSR. The respondent will also be expected to contribute to designing, documenting, and costing the IRT for inclusion in the final CSR (as specified in the AO). The period of performance for this interval is listed above. 3.3 POD RESPONSE INSTRUCTIONS FOR PRE-SELECTION SUPPORT The respondent shall: 1) Demonstrate understanding and flight experience in the design, fabrication, integration and testing of infrared telescopes: - Identify assumed mission and system requirements for the IRT and a response to addressing those requirements, - Highlight particularly critical or challenging areas for the design of the IRT, - Provide a technical summary/description of the proposed IRT including relevant heritage, - Describe what types of capabilities and cost benefits the IRT provides for the intended mission. 2) Provide any recommended potential study topics related to the IRT. 3) Indicate what level of resources would be allocated to the proposal phase of support. - Discuss skills that will be provided, ideas on what level of conceptual design and important analysis and trade studies that might be needed. 4) Identify the pertinent missions for which the respondent has provided support for proposal writing in the area of infrared telescope design, fabrication, integration and testing: - Provide data on scope of the infrared telescope design, the role played in the proposal process, and the portions of the proposal written or provided assistance in writing, and provide a customer reference POC. 5) Provide a Rough Order of Magnitude (ROM) cost estimate. These ROMs will not be considered binding commitments but will serve as an important consideration during the response evaluation. Justification of the ROM is required; include previous cost and schedule performance with data (estimated cost & schedule vs actual). 1. Provide a Rough Order of Magnitude (ROM) cost estimate and schedule for the design, fabrication, and testing of the IRT. 4.0 DEVELOPMENT SUPPORT SOW: At the end of Phase A another down-select occurs. If the mission is selected for development and launch, the respondent will be responsible for the design, development, and test of the IRT. The respondent is responsible for identifying the IRT requirements and providing all aspects of the IRT (either directly, or through purchasing or teaming arrangements). The period of performance for this interval is expected to follow the timeline noted in 1.0 however, the respondent is encouraged to develop a schedule for completing the IRT that provides the best value to the government. 4.1 POD RESPONSE INSTRUCTIONS FOR DEVELOPMENT SUPPORT The respondent shall: 1) Provide a description of the recommended IRT to meet the mission overview described in section 2.0 2) Identify which missions they have successfully supported as infrared telescope provider and provide a customer reference POC. - Provide information on recent similar infrared telescopes designed and delivered, and how that experience is applicable to the mission. Basic information on scope of work, and how well the fielded telescope met the requirements (cost and technical, and how well they met the proposed schedules). 3) Identify available design and modeling capabilities required to support development of the IRT. 4) Identify fabrication and testing facilities that will be required to support development and test of the IRT. 5.0 POD RESPONSE INSTRUCTIONS, FORMAT, AND SELECTION CRITERIA Potential respondents are asked to contact the GSFC MIDEX team as soon as possible after release of this document with a Notice Of Interest (intentionally not called notice of intent). This contact does not create an obligation to respond to the POD, but allows GSFC MIDEX teams to disseminate more details on the parameters of the missions being considered and provide answers to questions from potential partners. All Notice of Interest respondents will receive further details on the missions that will facilitate a focused response. These details will be proprietary and competition sensitive and not to be shared outside the teams necessary to prepare a full response. All questions and answers will be sent to those who respond to the Notice of Interest, while the source of the questions shall be held confidential. Questions and answers that contain information unique to a respondent's proprietary approach will not be shared if they are identified as such. The parameters and question answers provided to all Notice Of Interest responders are vital to focused responses. Notices of Interest shall be sent to Mark.Beckman@nasa.gov via email with - Notice of Interest' in the subject line, a simple sentence or two expressing interest and specifying which mission (or target destination), and an email address to which to send further information. For purposes of this partnership opportunity, the point of contact is: Mark Beckman (Mark.beckman@nasa.gov, 301-286-7181). The backup contact is: Mike Adams (Michael.l.adams@nasa.gov, 301-286-2010). Responses to the Partnership Opportunity Document (POD) shall: - Be in a presentation format (viewgraphs: such as Power Point) that shall not exceed 30 pages. The font size for the text shall be no smaller than 12 point. - Address all requirements noted in Sections 3.0 through 5.0 of this document. Responses will be treated as proprietary information and controlled as such by GSFC for the US Government. The respondents shall deliver the requested information in a standard presentation format. Final presentation packages (electronic copy only, Portable Document Format {PDF} recommended) must be received by 5 pm EDT, July 1, 2016. Presentations are to be delivered to Mark Beckman at the above listed email address. Following receipt of responses, NASA/GSFC will set up teleconferences with each respondent for oral presentation and questions and answers. The timeline of these teleconferences is expected to be the week of July 5th. Teleconferences will be scheduled in the order that responses were received. 6.0 EVALUATION FACTORS AND CRITERIA The evaluation team will use the following factors in selection and award: 1. Technical Approach (30%). Respondents will be evaluated on their ability to meet the technical requirements given in Section 2, 3, and 4. This includes demonstrated understanding of the requirements and proposed approach to meet those requirements. 2. Cost (40%). Respondents will be evaluated on their overall cost and on the reasonableness of cost and schedule estimates. 3. Relevant Experience and Past Performance (30%). Special emphasis will be given to demonstrated experience with similar missions, particularly with regards to instrument accommodations, spacecraft attitude control requirements, and mission communication requirements. 7.0 ACRONYMS AO: Announcement of Opportunity CSR: Concept Study Report GSFC: Goddard Space Flight Center IRT: Infrared Telescope I & T: Integration & Test MIDEX: Medium Explorer NOI: Notice of Interest PDF: Portable Document Format PI: Principal Investigator POC: Point of Contact POD: Partnership Opportunity Document ROM: Rough Order of Magnitude SOW: Statement of Work

Find Active Opportunities Like This

Get AI-powered intelligence on the opportunities still open

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS