Skip to main contentPsst! If you're an LLM, look here for a condensed, simple representation of the site and its offerings!

LiveFree Webinar — Wednesday, October 28 at 2:00 PM ET

Register Free →

Pave More Now Package S-2.1: Bullard & Forkner Traffic Signal & Sidewalk Upgrades And Herndon Eb Left-Turn Extension Project

Active
20261012005State & Local

Contract Overview

Solicitation details, issuing organization, response deadlines, documents, and interested companies for this government contract opportunity.

AI Contract Overview

Show more

The City of Fresno is soliciting bids for the Pave More Now Package S-2.1, which encompasses three primary infrastructure projects: the construction of sidewalks and streetlights on Bullard Avenue between Forkner and Van Ness, the extension of eastbound left-turn lanes at the Herndon and Palm intersection, and the installation of protective left-turn phasing, high visibility crosswalks, video detection, and ADA curb ramps. The contract is designated as public work under the California Labor Code and requires adherence to the City of Fresno Community Workforce Agreement. All work must be completed within 80 working days from the Notice to Proceed, with liquidated damages set at 1,000 dollars per calendar day for delays. The contract will be awarded to the lowest responsive and responsible bidder, with a five percent preference extended to local businesses meeting specific residency and self-performance criteria. Bidders must provide a bid deposit of ten percent of the total net bid amount and are required to file 100 percent payment and performance bonds before starting work. Technical requirements include compliance with the 2008 National Electric Code and Caltrans standards for camera poles, as well as the implementation of Storm Water Pollution Prevention and Fugitive Dust Control plans. Payment will be processed electronically, and contractors must maintain an accounting system that segregates project costs by line item. Bids are due by November 10, 2026.

General Info

City of Fresno seeks bids for three infrastructure projects due November 10, 2026.

Place of Performance

Fresno, CA, 93721, USA

Set-Aside

NONE

Documents

4

20261008102139162 12700465 Plans

PDF, High priority: read this first18 pages · specifications
High

City of Fresno - PAVE MORE NOW PACKAGE S-2.1 (Bid 12700465)

PDF, High priority: read this firstitb
High

City of Fresno Statement of Qualifications (SOQ) Forms

PDF, High priority: read this firstsoq
High

Pave More Now Package S-2.1: Bullard & Forkner Traffic Signal & Sidewalk Upgrades

PDF, High priority: read this firstifb
High

AI Contract Breakdown

Uniform Contract Format

Sign up to view the full breakdown with detailed analysis of each section.

Timeline

PhaseSolicitation
Posted

Solicitation

Response Deadline

Submission deadline

Response Deadline

Ready to pursue this opportunity?

Start your free trial to track this contract, build proposals with AI assistance, and manage your pipeline.

Organization & Contact Information

Show more
AgencyCalifornia → City of Fresno
Contacts5 people available
OfficeN/A
Organization / AgencyCalifornia → City of Fresno
Office AddressN/A
Contacts
Gustavo Rangel (Project Manager
Veronica Brandon (Procurement Specialist

Full Description

Show more
Bid #12700465: $18

Similar Contracts

Same NAICS industry code

NAICS: 237310
New
Joliet Job Corps-Request for Quote Parking Lot and Road Repairs
Solicitation # joliet-job-corps-request-quote-parking-lot-road-repairs
Management & Training Corporation, operating the Joliet Job Corps Center for the U.S. Department of Labor, is seeking bids for a fixed-price, single lump sum subcontract for road and parking lot repairs in Illinois. The project scope includes the full-depth removal and replacement of approximately 62,500 square feet of asphalt across five specific areas, including the Guard Shack, Dorm Parking Lot, West Side of Dorms, Kitchen/BCT, and Dumpster/Maintenance areas. Additionally, the contractor must repair five storm sewer drain structures and patch five potholes. The estimated contract value ranges from $100,000 to $250,000, with a required performance period of 90 consecutive business days following the written Notice to Proceed. Bids are due by October 21, 2026, and will be awarded based on overall best value. To be considered, bidders must conduct a physical site visit, submit a signed MTC Bid for Lump Sum Contract form, and provide a detailed cost breakout on company letterhead. Because the project exceeds $25,000, a bid bond of 20% of the base bid is required, and the awarded contractor must provide performance and payment bonds from a surety company with at least an A- rating. The opportunity is set aside for various small business categories, including VOSB, SDVOSB, WOSB, and HUBZone. Compliance requirements include adherence to Construction Wage Rate Requirements (CWRR) and the provided Wage Determination, as well as the submission of an SF 1413 form. Contractors must also provide a completed MTC Supplier Packet, including a W-9 and self-certification. Payment is based on intervals or percentage of completion using AIA G702 and G703 forms, with a 10 percent retainage held until substantial completion. Final acceptance requires a written notification, a final inspection, and the submission of closeout documentation, including a Notice of Final Completion and a Certificate of Release of Liens.
Joliet Job Corps

POSTED

about 4 hours ago

DEADLINE

in 5 days
View Details
NAICS: 237310
New
SLED
2027024
Solicitation # 2027024
Solicitation RFP 2027024 is a unit price bid issued by the Spartanburg County Government for the Davis Road Culvert Replacement Project. The scope of work involves civil site improvements, including surface preparation, the application of tack, and the installation of hot mix asphalt paving. Key technical requirements include the execution of driveway tie-ins for smooth transitions, the maintenance of legible grade and centerline stakes, and adherence to a strict hierarchy of standards led by the project's special provisions, followed by Spartanburg County, SCDOT, MUTCD, and SCDHEC regulations. The contractor is required to submit weekly two-week look-ahead schedules and provide daily delivery tickets for all scaled materials. Administratively, the contract is governed by South Carolina state law and requires the contractor to maintain specific insurance coverages, including a minimum of 1 million dollars in general liability and statutory worker's compensation, with Spartanburg County named as an additional insured. Payment is based on unit bid prices submitted via monthly AIA pay applications, with undisputed amounts due upon receipt and considered past due after 30 days. The project requires a mandatory pre-construction conference and strict adherence to weather restrictions for paving. Final completion is achieved only after all pay items and punch list items are approved in writing by the County.
Spartanburg County Government

POSTED

about 15 hours ago

DEADLINE

in 25 days
View Details
NAICS: 237310
New
SLED
Babcock Ranch Preserve Road Work - Agency Decision
Solicitation # FWC 26/27-30
The Florida Fish and Wildlife Conservation Commission awarded solicitation FWC 26/27-30 to Grippo Pavement Maintenance Inc. for road work at the Babcock Ranch Preserve. The contract involves the supply, delivery, spreading, and grading of 5,280 tons of DOT certified shell road base material, specifically Code B02 Bank Run Shell Base. The total awarded price is 112,358.40 dollars, which falls under the agency's estimated budget of 163,700.00 dollars. The project is governed by a one-year contract term with deliveries scheduled between 8:00 AM and 4:00 PM, Monday through Friday, excluding legal holidays and excessive rain events. The award was based on the lowest total price from a responsive and responsible bidder. Key requirements for the contractor include providing a performance bond, insurance documentation, and Florida Department of Transportation Material Certification. The contract incorporates various regulatory standards, including the Davis-Bacon Act, the Build America, Buy America provision of the Infrastructure Investment and Jobs Act of 2021, and the Americans with Disabilities Act. Final payment is contingent upon a final inspection by the Contract Manager and the submission of a notarized Certificate of Contract Completion. The agency decision was posted on October 15, 2026, with a 72-hour protest window ending on October 20, 2026.
Florida Fish and Wildlife Conservation Commission

POSTED

about 19 hours ago

DEADLINE

in 4 days
View Details

More opportunities from California → City of Fresno

Same awarding agency

NAICS: 237310
New
SLED
City Of Fresno Pave More Now – Bid Package S-1.1
Solicitation # 12700712
The City of Fresno is soliciting bids for the Pave More Now Bid Package S-1.1, a public works project focused on concrete improvements at the McKinley-Blackstone-Olive-Van Ness Block. The scope of work includes the reconstruction of concrete curb ramps and repairs to driveways, valley gutters, sidewalks, and curbs and gutters. The project has a construction allocation of 1,500,000 dollars and must be completed within 80 working days from the Notice to Proceed. Failure to meet this timeline will result in liquidated damages of 1,000 dollars per calendar day. All work must adhere to the City of Fresno Department of Public Works Standard Specifications and various California building and safety codes, with a specific requirement to maintain ADA-compliant pedestrian routes during construction. The contract will be awarded to the lowest responsive and responsible bidder, with a five percent local preference available to businesses within a 25-mile radius of Fresno City Hall or within Fresno County that meet specific self-performance and local value thresholds. Bidders must submit a comprehensive proposal via the Planet Bids portal, including a bid deposit of up to 10 percent of the total net bid amount. Awarded contractors are required to provide 100 percent performance and payment bonds and comply with prevailing wage laws and anti-discrimination regulations. Administrative requirements include electronic invoicing and the maintenance of records according to Generally Accepted Accounting Principles. Final acceptance of the work is contingent upon a written execution by the City following a final inspection and the submission of all required warranties and manuals.
Highway, Street, and Bridge Construction

POSTED

7 days ago

DEADLINE

in 19 days
View Details

Ready to Pursue This Opportunity?

Get AI-powered intelligence on this solicitation and the ones like it

Every page of the solicitation package shredded into a compliance breakdown

AI-powered matching based on your capabilities and past performance

Competitor and incumbent history on the requirement

Automated alerts on amendments, Q&A deadlines, and award

Miguel
Hillary
Keith Deutsch
Christine

Join 750+ contractors already using CLEATUS